41313 overhaul at East Somerset for IOWSR

الموضوع في 'Steam Traction' بواسطة gwalkeriow, بتاريخ ‏26 اكتوبر 2014.

  1. Matt37401

    Matt37401 Nat Pres stalwart

    إنضم إلينا في:
    ‏8 جوان 2014
    المشاركات:
    15,551
    عدد المعجبين:
    11,955
    مكان الإقامة:
    Wnxx
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Can we add 78018 and 84030 to that too?
     
  2. mendiprail

    mendiprail Member

    إنضم إلينا في:
    ‏7 جوان 2006
    المشاركات:
    523
    عدد المعجبين:
    120
    الجنس:
    ذكر
    مكان الإقامة:
    Somerset
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    10429839_10205540409696992_8439494742900648857_n.jpg
    Photo by Edd Hill.

    41313 safely arrived at the East Somerset Railway today, the restoration of this former Ivatt Trust Locomotive for the Isle of Wight Steam Railway is expected to take around 2 years to complete.
     
    ykin01, Corbs, philw2 و 10 آخرون معجبون بهذا.
  3. philw2

    philw2 Member

    إنضم إلينا في:
    ‏30 إبريل 2011
    المشاركات:
    494
    عدد المعجبين:
    86
    It would be great if they publish a photographic record of the restoration as they did with the tender version..
     
  4. Steve82H

    Steve82H New Member

    إنضم إلينا في:
    ‏11 سبتمبر 2014
    المشاركات:
    20
    عدد المعجبين:
    88
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Yes I will be adding photos of the restoration on the ESR website as we go as I did for 46447. I will add a link here once I've set up the gallery.
     
    Macko, philw2, Skimpot Flyer و 6 آخرون معجبون بهذا.
  5. Maunsell man

    Maunsell man Well-Known Member

    إنضم إلينا في:
    ‏1 ماي 2006
    المشاركات:
    1,601
    عدد المعجبين:
    512
    الوظيفة:
    Senior Finance Auditor
    مكان الإقامة:
    Kent
    Is it done yet??

    Sent from my KFTT using Tapatalk
     
    Matt37401, Kinghambranch, ADB968008 و 1 شخص آخر معجبون بهذا.
  6. Rumpole

    Rumpole Part of the furniture

    إنضم إلينا في:
    ‏17 ديسمبر 2005
    المشاركات:
    2,604
    عدد المعجبين:
    889
    الوظيفة:
    Tea-Maker
    مكان الإقامة:
    34105
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Impressive to see the number of people enthusiastically ripping it apart today!
     
  7. mendiprail

    mendiprail Member

    إنضم إلينا في:
    ‏7 جوان 2006
    المشاركات:
    523
    عدد المعجبين:
    120
    الجنس:
    ذكر
    مكان الإقامة:
    Somerset
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    20150214_005_1_medium.JPG
    41313 is seen here outside the engine shed at Cranmore yesterday morning. Two spare springs for 46447 can be seen on the front of the loco.
     
    Kinghambranch, Corbs و philw2 معجبون بهذا.
  8. Islander

    Islander Member

    إنضم إلينا في:
    ‏11 ماي 2006
    المشاركات:
    313
    عدد المعجبين:
    306
    الجنس:
    ذكر
    مكان الإقامة:
    Isle of Wight
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    أعجب بهذه المشاركة mendiprail
  9. Steve82H

    Steve82H New Member

    إنضم إلينا في:
    ‏11 سبتمبر 2014
    المشاركات:
    20
    عدد المعجبين:
    88
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Islander, Corbs و cav1975 معجبون بهذا.
  10. 32110

    32110 Member

    إنضم إلينا في:
    ‏20 ماي 2006
    المشاركات:
    649
    عدد المعجبين:
    794
    الجنس:
    ذكر
    الوظيفة:
    Retired from full time paid work
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Cab and bunker removed. Leading and trailing trucks removed. See link in #29 for photos.
     
    std tank, cav1975 و gwalkeriow معجبون بهذا.
  11. Steve82H

    Steve82H New Member

    إنضم إلينا في:
    ‏11 سبتمبر 2014
    المشاركات:
    20
    عدد المعجبين:
    88
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    IMG_2744.jpg

    We had the crane in today. Tanks removed, boiler removed and on the boiler wagon, frames lifted and on the trolleys and all back in the workshop. We had snow, hail, winds, rain and even some sunshine. Typical Cranmore weather!

    Tom has hopefully recorded another timelapse of the days activities and I'm sure he will upload it here later in the week.
     
    green five, Chris86, Kinghambranch و 3 آخرون معجبون بهذا.
  12. banburysaint

    banburysaint Member

    إنضم إلينا في:
    ‏12 يناير 2008
    المشاركات:
    322
    عدد المعجبين:
    413
    You don't mess about do you - the team are an inspiration to all!
     
    Matt37401, gwalkeriow, green five و 5 آخرون معجبون بهذا.
  13. D7076

    D7076 Well-Known Member

    إنضم إلينا في:
    ‏21 ديسمبر 2007
    المشاركات:
    1,538
    عدد المعجبين:
    691
    Could it work a passenger train before 41298?
     
  14. martin1656

    martin1656 Nat Pres stalwart Friend

    إنضم إلينا في:
    ‏8 ديسمبر 2014
    المشاركات:
    19,260
    عدد المعجبين:
    12,512
    الجنس:
    ذكر
    مكان الإقامة:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    that depends on where and when, and how long it takes to fit the air braking kit on to 41298, for instance i would expect 41298 to work an IOW working before 41313 but saying that 41313 could work a train on the ESR in what 18 months? if there is no need for 41298 to be in traffic at Havenstreet before that, who knows? you could even take a bet on both engines working their first revenue earning trains at the same time:)
     
  15. 32110

    32110 Member

    إنضم إلينا في:
    ‏20 ماي 2006
    المشاركات:
    649
    عدد المعجبين:
    794
    الجنس:
    ذكر
    الوظيفة:
    Retired from full time paid work
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Progress continues with stripping the frames. The wheel sets are awaiting transport for tyre turning and attention to the crank pins. Valves and pistons have been removed. The two centre horn guides, which are inverted 'U' shape, have been removed as rust has got in behind the top and has distorted the frame locally. It has been decided that the top section will be drilled and riveted as is the case on the Ivatt Cl 2 tender loco 46447. Many other components are being degreased, needle gunned and painted. Progress continues to be recorded at this link:
    http://www.eastsomersetrailway.com/gallery.php?gid=321
     
    أعجب بهذه المشاركة cav1975
  16. andrewtoplis

    andrewtoplis Well-Known Member

    إنضم إلينا في:
    ‏28 مارس 2006
    المشاركات:
    1,419
    عدد المعجبين:
    878
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Progress continues on 41298, the air brake controls are being installed and the engine painted at the moment. Don't forget that it is not a usual job to fit air braking to a locomotive which is steam braked, whilst still keeping the ability to work vac trains as well.
     
  17. jma1009

    jma1009 Well-Known Member

    إنضم إلينا في:
    ‏16 مارس 2013
    المشاركات:
    1,392
    عدد المعجبين:
    1,639
    الجنس:
    ذكر
    مكان الإقامة:
    ynysddu south wales
    given that the boiler ticket is already running on 41298 at Havenstreet, it does seem to be taking an awfully long time to get it into traffic?

    i know that whatever Havenstreet do it will be done well and thoroughly, but the delay does seem a bit unusual and unexpected.

    cheers,
    julian
     
  18. Martin Perry

    Martin Perry Nat Pres stalwart Staff Member Moderator Friend

    إنضم إلينا في:
    ‏15 إبريل 2006
    المشاركات:
    16,551
    عدد المعجبين:
    7,897
    مكان الإقامة:
    1012 / 60158
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The boiler ticket runs from when the inspector says 'go', for one year.

    Am sure that the loco department at Havenstreet will have their work programme planned accordingly.
     
  19. jma1009

    jma1009 Well-Known Member

    إنضم إلينا في:
    ‏16 مارس 2013
    المشاركات:
    1,392
    عدد المعجبين:
    1,639
    الجنس:
    ذكر
    مكان الإقامة:
    ynysddu south wales
    41298 had test runs in october last year, and the boiler ticket is running, but has spent the last 4 and a half months not turning a wheel, and from what i understand may be at least 6 months since last october's test runs before it runs again. it would be interesting to know the exact cause for the delay, as even some of the fulltime workshop staff dont know!
    cheers,
    julian
     
  20. Phil-d259

    Phil-d259 Member

    إنضم إلينا في:
    ‏2 إبريل 2015
    المشاركات:
    703
    عدد المعجبين:
    736
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Oh it's pratical alright - just way more expensive than by road.

    For the Mets to be allowed to travel over NR EVERY axle and wheel had to undergo ultrasonic testing, plus checks on tyre thickness, brakes, etc. all in all not cheep but in this case paid for by TfL.

    The 'derelict' Pacific would have been required to undergo the same process.

    Similarly if the locos you mention were towed dead over NR, they would have to have an ultrasonic wheel axle inspection, have tyre thickness that meet the mainline standards etc and have the motion disconnected.

    If the locos were in steam for lubrication reasons then the boilers etc would have to be certified to meet mainline standards - about the only thing that would be different from regular main liners is that if they were dragged, they would not need AWS, TPWS and OTDR fitted.

    Of course if dragged you need to pay someone to do the dragging which won't come cheap - particularly if the locos are dragged dead as the speed of the convoy will be a lot slower than everything else on the network making pathing difficult.

    Or you could hire a couple of low loaders and transport the locos with one simple payment.
     