If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Nunney Castle

Discuție în 'Steam Traction' creată de richard67, 23 Iun 2014.

  1. david1984

    david1984 Resident of Nat Pres

    Înscris:
    13 Sep 2005
    Mesaje:
    12.910
    Aprecieri primite:
    1.387
    Sex:
    Masculin
    Locație:
    Birmingham
    Probably means the boiler can take a couple more steamings, but has no worthwhile life left in it long term, say for example the firebox is worn, doesn't mean it will go immediately, but isn't up to another season of tours.
     
  2. GWR4707

    GWR4707 Nat Pres stalwart

    Înscris:
    12 Mai 2006
    Mesaje:
    19.232
    Aprecieri primite:
    17.566
    Sex:
    Masculin
    Locație:
    Cumbria
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I have read that it was a generational thing and many of the older crew preferred the Churchward cab, if nothing else as it gave more manoeuvrability with fire irons etc. I suspect it was a result of people generally in life not wanting change.

    I also recall reading somewhere (it may have been Harold Gasson?) that one thing that united GWR crews was that they couldn't understand why other companies locomotives had cab doors fitted - I believe the comment was something like 'is it because the buggers keep falling off the footplate'.
     
    Martin Perry apreciază asta.
  3. GWR4707

    GWR4707 Nat Pres stalwart

    Înscris:
    12 Mai 2006
    Mesaje:
    19.232
    Aprecieri primite:
    17.566
    Sex:
    Masculin
    Locație:
    Cumbria
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I must admit my first thought when I saw the video was that they were not nursing her back to Crewe - although I suppose it was only LE.

    Is it known what is up the boiler, is it just tired and needing overhaul or is there a fundamental problem which will need more that a 'normal' 10 yearly repair (I know there s no norm but hopefully you know what I mean).
     
  4. JBTEvans

    JBTEvans Part of the furniture

    Înscris:
    14 Feb 2008
    Mesaje:
    2.597
    Aprecieri primite:
    793
    Sex:
    Masculin
    Locație:
    Casnewydd, De Cymru
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Certainly is a strange one, especially as they are saying the rest of the engine is fine. Not as if they were taking it easy in my video either. Didn't she recently have a boiler extension granted too?
     
  5. Robbo

    Robbo Member

    Înscris:
    8 Sep 2005
    Mesaje:
    541
    Aprecieri primite:
    44
    Sex:
    Masculin
    From Icons of Steam: https://medium.com/@IconsOfSteam/a-new-year-iconsofsteam-c5962b9eb8ba
    "We are, unfortunately, starting off this year on a sad note. With the news that No. 5029 Nunney Castle is to be officially withdrawn from service, following her failure of a fitness to run examination, due to leaking boiler stays, back in November 2014. Because of the nature and amount of work required to remedy the problems with her boiler we have decided to move the engine to the Royal Scot Locomotive and General Trust facilities at LNWR Heritage in Crewe as soon as is practical.
    We have no immediate plans for a return to steam for the No. 5029. This is for a number of reasons, not least because our teams are focused on getting No. 46100 and No. 34046 back on the mainline as soon as possible."
     
    Last edited: 17 Feb 2015
  6. lil Bear

    lil Bear Part of the furniture

    Înscris:
    11 Dec 2006
    Mesaje:
    6.136
    Aprecieri primite:
    1.700
    Sex:
    Masculin
    Ocupație:
    Railway Technician
    Locație:
    8C / 5D / 27C / 71B
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Can't she have her boiler pressure reduced ala 4771, and do a tour of preserved lines? Seems a shame to see her go into store when only 18(?) months ago she had a bottom end overhaul.
     
    flying scotsman123 apreciază asta.
  7. KristianGWR

    KristianGWR Member

    Înscris:
    2 Ian 2011
    Mesaje:
    930
    Aprecieri primite:
    1.389
    Sex:
    Masculin
    Locație:
    Swindon


    A couple of shots from me of the move at Abergavenny and Craven Arms.
     
  8. mike1522

    mike1522 Long Time Member Friend

    Înscris:
    9 Oct 2010
    Mesaje:
    2.001
    Aprecieri primite:
    237
    Locație:
    Fort Worth, Texas
    So sad. It is so unfortunate to see her go. I'm glad that she got around as much as she did last year.
     
  9. green five

    green five Resident of Nat Pres

    Înscris:
    30 Apr 2006
    Mesaje:
    6.783
    Aprecieri primite:
    2.623
    Sex:
    Masculin
    Ocupație:
    Design Draughtsman
    Locație:
    Hampshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It is very sad to see her finish her current career in this way. The wreath on her smokebox door seems to suggest she is going to be away for a long time. I recently bought the latest PSOV ML Blu ray which covers her final ML runs and the commentary by Karl Jauncey suggests 5029 has a very uncertain ML future and may never return to the national network. However, if you read the articles about the LSL loco's in the latest issues of The Railway Magazine and Heritage Railway they both say she is heading to Crewe for boiler repairs.
     
  10. dan.lank

    dan.lank Member

    Înscris:
    30 Aug 2009
    Mesaje:
    412
    Aprecieri primite:
    312
    Sex:
    Masculin
    Locație:
    Haywards Heath
    Curious! Looks cracking in the videos...


    Sent from my iPhone using Tapatalk
     
  11. ADB968008

    ADB968008 Guest

    to think only a few months ago it was putting in a performance like this at the Mid Hants....
    (from 4.00 onwards is quite nice, as is after the pway slack at 6.50)

     
    Last edited by a moderator: 17 Feb 2015
  12. Sidmouth

    Sidmouth Resident of Nat Pres Staff Member Moderator

    Înscris:
    12 Sep 2005
    Mesaje:
    10.146
    Aprecieri primite:
    9.777
    Sex:
    Masculin
    Locație:
    Alderan !
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The issue as I understand is leaking stays which may be related to the reported batch of material which wasn't to the correct specification a few years back

    reading between the lines the decision has been met with total dismay by the support crew who feel that she is quickly repairable and had a significant sum spent less than 3 years ago on a full bottom end overhaul . to sideline her now seems a mad decision
     
    pete d apreciază asta.
  13. flying scotsman123

    flying scotsman123 Resident of Nat Pres

    Înscris:
    9 Sep 2013
    Mesaje:
    10.674
    Aprecieri primite:
    18.700
    Sex:
    Masculin
    Locație:
    Cheltenham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It does seem a bit daft, if she's well enough to limp home under her own steam I'd have thought the problems wouldn't be that bad.
     
  14. Big Al

    Big Al Nat Pres stalwart Staff Member Moderator

    Înscris:
    30 Mai 2009
    Mesaje:
    22.591
    Aprecieri primite:
    22.721
    Locație:
    1016
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It seems that whatever needs to be done, it is down the list and after work on other fleet members. That seems to be a factor so, anyway, it would not be available for anything on the ML anytime soon.
     
  15. green five

    green five Resident of Nat Pres

    Înscris:
    30 Apr 2006
    Mesaje:
    6.783
    Aprecieri primite:
    2.623
    Sex:
    Masculin
    Ocupație:
    Design Draughtsman
    Locație:
    Hampshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I am glad I captured this performance from 5029 up the bank from Alton to Medstead.


    The loudest climb I have ever had up there!
     
  16. joe_issitt

    joe_issitt New Member

    Înscris:
    13 Noi 2008
    Mesaje:
    168
    Aprecieri primite:
    103
    Sex:
    Masculin
    Ocupație:
    Ex-Boiler Maker
    Locație:
    Norfolk
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    If the boiler issues are related to the dodgy batch of copper, then they've done right to pull it from active duty. The problem is that these stays are breaking in more than one place, which is very unusual. Normally stays break in one place, but the stays made out of the dodgy material was breaking in two places.

    You can still run a steam engine with one broken stay... This puts more pressure on the ones in the vicinity of it, and when two stays go in the same row, then you have to replace it.

    The thing is, if the box is littered with these stays, you could replace hundreds upon hundreds of stays. The dodgy ones have to be drilled and shelled out (being careful to remove the stays from the waterspace), then run a tap through and possible tap them up a size, then make and replace the stay and tool it in.

    The good bottom end isn't going to 'go off'. Crewe have a hell of a lot of work going on and moving premises - you can't blame them for storing this engine. The set backs with the Brit and braunton over the last few years haven't helped - the same could be said for the Scot as well.
     
    Shoddy127 și GWRArry apreciază asta.
  17. dan.lank

    dan.lank Member

    Înscris:
    30 Aug 2009
    Mesaje:
    412
    Aprecieri primite:
    312
    Sex:
    Masculin
    Locație:
    Haywards Heath
    Great point about the bottom end not going off... Hadn't considered that...!


    Sent from my iPhone using Tapatalk
     
  18. Enterprise

    Enterprise Part of the furniture

    Înscris:
    9 Sep 2005
    Mesaje:
    5.472
    Aprecieri primite:
    3.302
    Nobody would want a bottom end going off.
     
    BrillTramway apreciază asta.
  19. Steve

    Steve Resident of Nat Pres Friend

    Înscris:
    7 Oct 2006
    Mesaje:
    12.732
    Aprecieri primite:
    11.848
    Ocupație:
    Gentleman of leisure, nowadays
    Locație:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I'm quite intrigued at the failure mechanism that causes a stay to break in two places. Once there is one break, the stay is no longer stressed so a second break shouldn't occur. I don't know what the problem is; however, according to Sidmouth (above) the problem is with leaking stays, which is an entirely different matter. Whatever the problem, it probably isn't a five minute fix and will require a boiler lift to do it.
     
  20. JJG Koopmans

    JJG Koopmans Member

    Înscris:
    12 Noi 2014
    Mesaje:
    382
    Aprecieri primite:
    474
    Sex:
    Masculin
    Heritage Railway Volunteer:
    No I do not currently volunteer
    If by thermal expansion it is forced into an S-shape, fatigue may cause two identical breaks
    kind regards
    Jos Koopmans
     

Distribuie pagina asta