Long Potential Extensions

الموضوع في 'Heritage Railways & Centres in the UK' بواسطة JFlambo, بتاريخ ‏3 مارس 2015.

  1. Bramblewick

    Bramblewick Member

    إنضم إلينا في:
    ‏19 يناير 2010
    المشاركات:
    736
    عدد المعجبين:
    200
    Getting around Melrose would indeed be a right pig to do. The Whitrope lads however have perhaps the most potential for expansion of all: Carlisle to St. Boswell's, with branches to Langholm and Kielder.
     
    Last edited: ‏3 مارس 2015
  2. Martin Perry

    Martin Perry Nat Pres stalwart Staff Member Moderator Friend

    إنضم إلينا في:
    ‏15 إبريل 2006
    المشاركات:
    16,551
    عدد المعجبين:
    7,897
    مكان الإقامة:
    1012 / 60158
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The Llangollen Railway and Bala Lake Railway are built on the formation of the GWR Ruabon - Barmouth Jn line, 54 miles long. Sadly there are also some pretty significant developments on the line such as the Dollgellau bypass, a road at Penmaenpool, various buildings in Llangollen, missing bridges at Acrefair, Corwen and other locations.
     
  3. Woodster21

    Woodster21 Member

    إنضم إلينا في:
    ‏4 فبراير 2007
    المشاركات:
    461
    عدد المعجبين:
    50
    مكان الإقامة:
    Derbyshire
    Rowsley to Buxton or Blackwell Mill
     
  4. Matt37401

    Matt37401 Nat Pres stalwart

    إنضم إلينا في:
    ‏8 جوان 2014
    المشاركات:
    15,551
    عدد المعجبين:
    11,955
    مكان الإقامة:
    Wnxx
    Heritage Railway Volunteer:
    No I do not currently volunteer
    SVR to Stourport? They own the trackbed as far as Burlish but not sure how much the lines been built on at the Stourport end.
     
  5. Pete Thornhill

    Pete Thornhill Resident of Nat Pres Staff Member Administrator Moderator Friend

    إنضم إلينا في:
    ‏24 جويلية 2008
    المشاركات:
    7,764
    عدد المعجبين:
    5,891
    There is a housing estate built across the formation unfortunately.
     
  6. RA & FC

    RA & FC Well-Known Member

    إنضم إلينا في:
    ‏4 اكتوبر 2007
    المشاركات:
    1,128
    عدد المعجبين:
    415
    الجنس:
    ذكر
    مكان الإقامة:
    Gogledd Cymru
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Not to forget the Corwen - Rhyl line, branching off at Denbigh toward Mold! Could have a right little network one day.
     
  7. gwralatea

    gwralatea Member

    إنضم إلينا في:
    ‏31 ديسمبر 2014
    المشاركات:
    511
    عدد المعجبين:
    1,006
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    No I do not currently volunteer
    So close - out by one branchline! What the SVR *could* do, allowing for favourable weather conditions, a limitless money pool/pit, and stiff gins all round, is reinstate Dowles Bridge.

    Can't get all the way to Woofferton but you could put back Bewdley-Wyre Forest-Brown Clee Hill- Cleobury Mortimer-Neen Sollars-Newnham Bridge.... (although you'd need to have a Chinnor style headshunt loop beyond the station at Newnham Bridge unless they changed the road alignment immediately before the bridge over the trackbed to get a loop in at the station.

    Now that's the closing time-after-eight-pints in the King & Castle dream of champions.

    What's the number for the Heritage Lottery Fund again?
     
    Piece of coal, 49010, spicer21 و 2 آخرون معجبون بهذا.
  8. JFlambo

    JFlambo New Member

    إنضم إلينا في:
    ‏4 جوان 2013
    المشاركات:
    80
    عدد المعجبين:
    11
    الجنس:
    ذكر
  9. gwralatea

    gwralatea Member

    إنضم إلينا في:
    ‏31 ديسمبر 2014
    المشاركات:
    511
    عدد المعجبين:
    1,006
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    No I do not currently volunteer
    good site - just used it to check my memory, and, as I thought, move a couple of static caravans and it's clear to the other side of Newnham Bridge. I think there's one building that would need to come down as well in the depths of the forest, but in the great scheme of things, if we've got the money to put back the bridge we've got the money to buy that...

    In fact, if it wasn't such a ludicrous idea (on the basis of cost, demand, and the fact that no one lives there), it would be a brilliant idea. Certainly would count as one of the most beautiful and unspoilt standard gauge preservation schemes.

    But realistically, no chance.
     
    أعجب بهذه المشاركة JFlambo
  10. Southernman99

    Southernman99 Member Friend

    إنضم إلينا في:
    ‏10 نوفمبر 2009
    المشاركات:
    946
    عدد المعجبين:
    698
    Matt,
    At the recent Q & A at Highley. It was proposed that a railway p/way engineering company are looking at using the trackbed from south of Sandbourne viaduct through to the tunnel as a training base. Ie lineside clearance, embankment/ civils work and relaying the track through the tunnel. I am not sure how much further past the tunnel can be relaid.
     
    أعجب بهذه المشاركة Matt37401
  11. lil Bear

    lil Bear Part of the furniture

    إنضم إلينا في:
    ‏11 ديسمبر 2006
    المشاركات:
    6,136
    عدد المعجبين:
    1,700
    الجنس:
    ذكر
    الوظيفة:
    Railway Technician
    مكان الإقامة:
    8C / 5D / 27C / 71B
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Churnet Valley.

    Currently 5.5miles Leek Brook to Kingsley & Froghall, with access to the 4.5miles from LBJ to Ipstones.

    Proposed Extension -:
    1 mile North to Leek from LBJ
    10miles West to Stoke from LBJ
    4ish Miles South-East from Ipstones to Cauldon Quarry
    > Plus 2ish Miles from Caldon Jcn to Waterhouses
    5ish Miles South from Froghall to Alton Towers.

    IF everything comes off, that's a network of over 30miles worth of track.
    *Leek is progressing, with formal plans to be made public within the coming weeks.
    *Stoke is under discussions between MCR and Network Rail.
    *Cauldon is waiting for the ownership of the quarry to be full settled before talks recommence (and this ties in with Waterhouses too).
    *Alton, we own upto Oakamoor Sand Quarry (aka Moneystone). Scoping plans have just gone in for converting the former quarry into a holiday park, which if successful would give an ideal reason to re-open this section. Beyond Moneystone the trackbed between Oakamoor and Alton is currently Council owned, and so further discussions will be required. Leek though is the main effort at present as it will finally give us a presence in a location that is actually somewhere instead of in the middle of nowhere!
     
    49010, desperado و JFlambo معجبون بهذا.
  12. JFlambo

    JFlambo New Member

    إنضم إلينا في:
    ‏4 جوان 2013
    المشاركات:
    80
    عدد المعجبين:
    11
    الجنس:
    ذكر
    Is the loco department located in a good position should this network come into fruition? - would LBJ become the most active place in all of railway preservation?
     
  13. Fireline

    Fireline Well-Known Member

    إنضم إلينا في:
    ‏11 فبراير 2008
    المشاركات:
    1,303
    عدد المعجبين:
    1,351
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    No, that would be Mr Reeder's imagination....
     
    oddsocks و Jamessquared معجبون بهذا.
  14. lil Bear

    lil Bear Part of the furniture

    إنضم إلينا في:
    ‏11 ديسمبر 2006
    المشاركات:
    6,136
    عدد المعجبين:
    1,700
    الجنس:
    ذكر
    الوظيفة:
    Railway Technician
    مكان الإقامة:
    8C / 5D / 27C / 71B
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The MPD is based at Cheddleton, roughly a mile South of Leek Brook.
    Steam wise we have 2x TKh, 2x S160 + 8F. 1x TKh is serviceable, and bot S160s should be running within 12 months.
    Diesel wise we have 2x 33, 1x 47, 1x 25 and 2x 37. Both 33s run (though 021 is currently awaiting repairs) and the 47 should be running within 18 months.

    Future service wise I can only see CVR operating the Leek - Froghall (and/or Oakmoor + Alton Towers) section regularly.
    Ipstones will more than likely remain a 1 weekend a month operation until Waterhouses is reached (which wont be in the immediate future).
    Stoke Line will probably become a gala only line, as this is mainly MCR efforts so they can re-introduce commuter service Leek - Stoke and also use it for moving freight to/from Cauldon.

    So for what CVR want to do I would say yes we have enough, we just need to the money and manpower to get them all operational!

    As for Leek Brook, Gala days could certainly become interesting once we've got it all opened!
     
    أعجب بهذه المشاركة JFlambo
  15. Jamessquared

    Jamessquared Nat Pres stalwart

    إنضم إلينا في:
    ‏8 مارس 2008
    المشاركات:
    27,800
    عدد المعجبين:
    64,480
    مكان الإقامة:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The Bluebell owns the trackbed for a two mile extension to Ardingly and thence (via Network Rail) to Haywards Heath. The major engineering obstacle is the re-instatement of Sherriff Mill viaduct just outside Horsted Keynes.

    With near-unlimited funds the Bluebell could go six miles south to the site of Culver Junction, and then another three miles into Lewes. But they really would have to be near-unlimited funds! The trackbed has been built on at Newick, about two miles south of Sheffield Park, and then again once into Lewes. There is also an infilled cutting to clear.

    Tom
     
    nine elms fan و JFlambo معجبون بهذا.
  16. gwralatea

    gwralatea Member

    إنضم إلينا في:
    ‏31 ديسمبر 2014
    المشاركات:
    511
    عدد المعجبين:
    1,006
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Why stop there? When you get to Waterhouses you can go down a gauge or so and rebuild the Leek & Manifold Valley as well...
     
    أعجب بهذه المشاركة lil Bear
  17. lil Bear

    lil Bear Part of the furniture

    إنضم إلينا في:
    ‏11 ديسمبر 2006
    المشاركات:
    6,136
    عدد المعجبين:
    1,700
    الجنس:
    ذكر
    الوظيفة:
    Railway Technician
    مكان الإقامة:
    8C / 5D / 27C / 71B
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Someone sends us a blank cheque we'll happily get on with it!
     
  18. Bramblewick

    Bramblewick Member

    إنضم إلينا في:
    ‏19 يناير 2010
    المشاركات:
    736
    عدد المعجبين:
    200
    If we're talking real pie in the sky then in addition to Pickering to Rillington, there's Pickering to Scarborough via the Forge Valley line, and Pickering to Pilmoor and Malton (and Driffield) via Gilling.
     
    أعجب بهذه المشاركة MarkinDurham
  19. Daddsie71b

    Daddsie71b Member Friend

    إنضم إلينا في:
    ‏4 إبريل 2013
    المشاركات:
    942
    عدد المعجبين:
    803
    الجنس:
    ذكر
    مكان الإقامة:
    34091
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Or Norden to Goathorn on the Fayles Tramway in the Purbecks.
     
    أعجب بهذه المشاركة Reading General
  20. Rbridge100

    Rbridge100 New Member

    إنضم إلينا في:
    ‏19 جويلية 2012
    المشاركات:
    30
    عدد المعجبين:
    4
    With enough will the Brecon Mountain Rly could easily regain the 7 or so miles to Talybont-on-Usk, and with new bridges over the Usk and under the A40 (and repossessing someone's garden), the trackbed is clear for at least 8 miles to Talgarth; 15 miles in all. An extension south from Pontsticill to Cefn Coed of about 4 miles looks reasonably clear too.
     

مشاركة هذه الصفحة