  1. twr12

    twr12 Well-Known Member

    Pridružen(a):
    2. Rujan 2007.
    Poruka:
    1,659
    Lajkova:
    821
    No it doesn't. The words above do not say "data recorder was not working".
     
    Jamessquared se sviđa ovo.
  2. david1984

    david1984 Resident of Nat Pres

    Pridružen(a):
    13. Rujan 2005.
    Poruka:
    12,910
    Lajkova:
    1,387
    Spol:
    Muškarac
    Grad:
    Birmingham

    I agree and think people are reading things into the WCRC statement which are not there, the suggestion by someone they were attempting to circumvent the ban is utterly ridiculous, if you are hiring out to another TOC, then it runs under their safety case, which is entirely above board in NR's eyes, and means some tours can run at least.
     
  3. alastair

    alastair Well-Known Member

    Pridružen(a):
    7. Studeni 2005.
    Poruka:
    1,272
    Lajkova:
    788
    Well for a start... regret,sorry? Trains have already been cancelled. For multiple reasons debated above,we know DBS can't pick up the vast majority of steam workings, so why pretend that they can?
     
  4. 8126

    8126 Member

    Pridružen(a):
    17. Ožujak 2014.
    Poruka:
    831
    Lajkova:
    976
    Spol:
    Muškarac
    Tornado of course, WCRC's favourite loco. ;) There's also Clan Line, if they feel like some extra funds at the last minute pre-overhaul. 60007 too...
     
    green five and 26D_M like this.
  5. mrKnowwun

    mrKnowwun Part of the furniture

    Pridružen(a):
    22. Listopad 2011.
    Poruka:
    4,366
    Lajkova:
    2,823
    Interesi:
    Retired
    Grad:
    West Byfleet
    Heritage Railway Volunteer:
    No I do not currently volunteer
    3. Implement arrangements to accurately record, monitor and manage all train protection

    activations (including Automatic Warning System and Train Protection and Warning System),

    Says it wasn't
     
  6. GWR4707

    GWR4707 Nat Pres stalwart

    Pridružen(a):
    12. Svibanj 2006.
    Poruka:
    19,248
    Lajkova:
    17,594
    Spol:
    Muškarac
    Grad:
    Cumbria
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Firstly Mods if you want to split the thread feel free to move this, I do appreciate that thread management is a chore so not sure whether to start one or not
    From the RAIB initial report...

    The RAIB has found no evidence of any malfunction of the signalling, AWS or TPWS equipment involved in the incident.

    Suggests it was!
     
    oldmrheath and Jamessquared like this.
  7. twr12

    twr12 Well-Known Member

    Pridružen(a):
    2. Rujan 2007.
    Poruka:
    1,659
    Lajkova:
    821
    I give up. Think what you like. It doesn't matter what spleen is vented on railway enthusiast forums. Unless anyone commits libel!
     
  8. Chris W

    Chris W New Member

    Pridružen(a):
    3. Listopad 2010.
    Poruka:
    6
    Lajkova:
    0
    Grad:
    York
    That is a fair comment. Although, Freedom of Information rules allow 30 days for a response and information would only become public if a journalist/member of public requested it. The language in the letter also suggests to me that the decision to publish upfront was probably a concious one.
     
  9. alastair

    alastair Well-Known Member

    Pridružen(a):
    7. Studeni 2005.
    Poruka:
    1,272
    Lajkova:
    788
    Hang on a minute,we were specifically requested by the Moderators here :

    http://www.national-preservation.co...-march-wootton-bassett-incident.444267/page-3

    NOT to discuss this incident. Presumably this is still the case?
     
  10. Duty Druid

    Duty Druid Resident of Nat Pres

    Pridružen(a):
    19. Srpanj 2010.
    Poruka:
    11,114
    Lajkova:
    4,713
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I think events have overtaken that somewhat............

    Now all we can do is wait until mid May to find out the result of how good WCRC response to NR's demands are........... in the meantime, there's going to be quite a few spare paths on the network it seems.....
     
  11. GWR4707

    GWR4707 Nat Pres stalwart

    Pridružen(a):
    12. Svibanj 2006.
    Poruka:
    19,248
    Lajkova:
    17,594
    Spol:
    Muškarac
    Grad:
    Cumbria
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Firstly Mods if you want to split the thread feel free to move this, I do appreciate that multiple thread management is a chore so not sure whether to start one or not..

    The below is lifted from the RAIB website verbatim...

    The RAIB’s preliminary examination has shown that, at around 17:24 hrs, train 1Z67 was approaching signal SN43 at 59 mph, when it passed over the temporary AWS magnet associated with the TSR. This created both an audible and visual warning in the locomotive’s cab. However, as the driver did not acknowledge this warning within 2.7 seconds, the AWS system on the locomotive automatically applied the train’s brakes. This brake application should have resulted in the train being brought to a stand. In these circumstances, the railway rule book requires that the driver immediately contact the signaller.

    The RAIB has found evidence that the driver of 1Z67 did not bring the train to a stand and contact the signaller after experiencing this brake application. Evidence shows that the driver and fireman instead took an action which cancelled the effect of the AWS braking demand after a short period and a reduction in train speed of only around 8 mph. The action taken also had the effect of making subsequent AWS or TPWS brake demands ineffective.


    Shortly after passing the AWS magnet for the TSR, the train passed signal SN43, which was at caution. Although the AWS warning associated with this signal was acknowledged by the driver, the speed of the train was not then reduced appropriately on the approach to the next signal, SN45, which was at danger. Because of the earlier actions of the driver and fireman, the TPWS equipment associated with signal SN45 was unable to control the speed of the train on approach to this signal.

    As train 1Z67 approached signal SN45, the driver saw that it was at danger and fully applied the train’s brakes. However, by this point there was insufficient distance remaining to bring the train to a stand before it reached the junction beyond SN45. The train subsequently stopped, standing on both the crossovers and the up and down Badminton lines, at around 17:26 hrs. The signalling system had already set the points at the junction in anticipation of the later movement of 1Z67 across it; this meant that no damage was sustained to either the train or the infrastructure as a result of the SPAD.


    Whilst the suspension of WCRC seems to he the headline news on NP, the above is the RAIB's own initial report, I know there are a number of signalling and general operations specialists on here and I would be interested to hear an interpretation (WNXX seems to be quite measured in its response and analysis of this). They key element (to my limited knowledge) seems to be 'Evidence shows that the driver and fireman instead took an action which cancelled the effect of the AWS braking demand after a short period and a reduction in train speed of only around 8 mph. The action taken also had the effect of making subsequent AWS or TPWS brake demands ineffective.' what action was or could be taken and why ?

    Equally Mods if this is taking things in a direction that you would rather not have the hassle of dealing with feel free to delete this!
     
  12. GWR4707

    GWR4707 Nat Pres stalwart

    Pridružen(a):
    12. Svibanj 2006.
    Poruka:
    19,248
    Lajkova:
    17,594
    Spol:
    Muškarac
    Grad:
    Cumbria
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Sorry Mods - didn't see the note from last week (Friday) asking to not discuss until after posted this - apologies feel free to get rid!
     
  13. mrKnowwun

    mrKnowwun Part of the furniture

    Pridružen(a):
    22. Listopad 2011.
    Poruka:
    4,366
    Lajkova:
    2,823
    Interesi:
    Retired
    Grad:
    West Byfleet
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Says the AWS and the TPWS was working. Says nothing about the OTMR.
     
  14. GWR4707

    GWR4707 Nat Pres stalwart

    Pridružen(a):
    12. Svibanj 2006.
    Poruka:
    19,248
    Lajkova:
    17,594
    Spol:
    Muškarac
    Grad:
    Cumbria
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Exactly and sadly I suspect a fairly large number of staff at WCRC who work on this charter traffic and thus will be dependent about the future outcome.
     
  15. Spamcan81

    Spamcan81 Nat Pres stalwart

    Pridružen(a):
    25. Kolovoz 2007.
    Poruka:
    35,847
    Lajkova:
    22,295
    Interesi:
    Training moles
    Grad:
    The back of beyond
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Are Ian's 5s air braked?
     
  16. mrKnowwun

    mrKnowwun Part of the furniture

    Pridružen(a):
    22. Listopad 2011.
    Poruka:
    4,366
    Lajkova:
    2,823
    Interesi:
    Retired
    Grad:
    West Byfleet
    Heritage Railway Volunteer:
    No I do not currently volunteer
  17. Martin Perry

    Martin Perry Nat Pres stalwart Staff Member Moderator Friend

    Pridružen(a):
    15. Travanj 2006.
    Poruka:
    16,551
    Lajkova:
    7,897
    Grad:
    1012 / 60158
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I would suggest that anyone posting on this thread has a long hard think before they do so, take a moment to reflect upon what you are posting, if it is speculation or potentially libellous, step away from the keyboard please. Thanks.
     
  18. GWR4707

    GWR4707 Nat Pres stalwart

    Pridružen(a):
    12. Svibanj 2006.
    Poruka:
    19,248
    Lajkova:
    17,594
    Spol:
    Muškarac
    Grad:
    Cumbria
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I would assume that the fact that they state as fact that 'Evidence shows that the driver and fireman instead took an action which cancelled the effect of the AWS braking demand after a short period and a reduction in train speed of only around 8 mph. The action taken also had the effect of making subsequent AWS or TPWS brake demands ineffective.' is sufficiently accurate and stated as a fact to suggest they are getting the detail from somewhere which would suggest OTMR was working.

    But to be fair we now little of the facts and thus should assume nothing.
     
  19. mrKnowwun

    mrKnowwun Part of the furniture

    Pridružen(a):
    22. Listopad 2011.
    Poruka:
    4,366
    Lajkova:
    2,823
    Interesi:
    Retired
    Grad:
    West Byfleet
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Tell you what, you tell me what you think

    Implement arrangements to accurately record, monitor and manage all train protection

    activations (including Automatic Warning System and Train Protection and Warning System),


    means, and why it was pointed out as an issue
     
  20. 21B

    21B Part of the furniture

    Pridružen(a):
    2. Rujan 2009.
    Poruka:
    3,914
    Lajkova:
    8,723
    Frankly I don't see why we should not discuss what is in the public domain. The action taken was to isolate the TPWS/AWS system and continue running, that is what that RAIB statement means. AFAIK that is not what the rule book requires, which might explain in part the action NR have taken. I believe that if it is necessary to isolate the TPWS system you must bring the train to a stand and contact the signaller first. As to why it was isolated and why the signaller was not contacted, that is for the RAIB to establish, and I'll refrain from speculating.
     