If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

MHR Restorations and Overhauls

الموضوع في 'Steam Traction' بواسطة LN850, بتاريخ ‏21 ماي 2010.

  1. 73129

    73129 Part of the furniture

    إنضم إلينا في:
    ‏24 سبتمبر 2007
    المشاركات:
    4,558
    عدد المعجبين:
    1,227
    مكان الإقامة:
    Winchester
    Just to add on to this. There are another two more huts being built on the Alton section. One at Yew tree curve and another to possibly built under Hampshire Hunt bridge or possible the other side of Butts bridge.
     
  2. Hampshire Unit

    Hampshire Unit Well-Known Member Friend

    إنضم إلينا في:
    ‏16 يناير 2012
    المشاركات:
    1,619
    عدد المعجبين:
    3,562
    الجنس:
    ذكر
    الوظيفة:
    Carer, Gardener
    مكان الإقامة:
    Alresford
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    These huts are a real enhancement to the Mid Hants lineside
     
  3. Hurricane

    Hurricane Member

    إنضم إلينا في:
    ‏1 نوفمبر 2013
    المشاركات:
    823
    عدد المعجبين:
    307
    الجنس:
    ذكر
    مكان الإقامة:
    71A
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The most recent Mid Hants News stated that they wont be building a hut under Hampshire Hunt Bridge due to issues with tamping and keeping in guage due to the low height of the bridge, however under the bridge is the remnants of an original lineside hut.
     
  4. 73129

    73129 Part of the furniture

    إنضم إلينا في:
    ‏24 سبتمبر 2007
    المشاركات:
    4,558
    عدد المعجبين:
    1,227
    مكان الإقامة:
    Winchester
    I heard it was only an idea to reinstate the hut at Hampshire hunt bridge. What I do know is another hut will be built in the Alton section some time next year. I wonder what will appear on the line side next after the huts are completed. Stone chipping boxes would look great next to the huts.
     
  5. Footbridge

    Footbridge Member

    إنضم إلينا في:
    ‏4 أوت 2013
    المشاركات:
    499
    عدد المعجبين:
    634
    الجنس:
    ذكر
    مكان الإقامة:
    Darlington
    Heritage Railway Volunteer:
    Yes I am an active volunteer
  6. 21B

    21B Part of the furniture

    إنضم إلينا في:
    ‏2 سبتمبر 2009
    المشاركات:
    4,379
    عدد المعجبين:
    9,994
    It is more likely the hut will be removed and the line slewed toward the centre of the bridge to improve clearances.
     
  7. cymroglan

    cymroglan Member

    إنضم إلينا في:
    ‏9 جوان 2009
    المشاركات:
    591
    عدد المعجبين:
    95
    Anyone able to give a steer as to likely locos for next week from Monday 13th?
     
  8. Steamage

    Steamage Part of the furniture

    إنضم إلينا في:
    ‏14 سبتمبر 2005
    المشاركات:
    4,754
    عدد المعجبين:
    1,139
    مكان الإقامة:
    Oxford
    You'll probably have to wait until the dust has settled behind Thomas before the loco roster is updated. 925 is off to Swanage for their gala next week, and Bittern is only contracted for a limited number of steaming days this year, so I doubt either of them will be running. Nellie and the Black Five are available for traffic and so is Wadebridge, but I think the 9F might still be waiting for the pony truck to be reassembled. Does that help?
     
  9. cymroglan

    cymroglan Member

    إنضم إلينا في:
    ‏9 جوان 2009
    المشاركات:
    591
    عدد المعجبين:
    95
    I really appreciate your reply.
    I do understand about the huge demands the long Thomas season makes on time! I will be along for the 50 at the weekend, on my own, but will probably drag a young lady over midweek with the promise of a nice meal at one of the better local restaurants as an enticement....
     
  10. free2grice

    free2grice Part of the furniture Friend

    إنضم إلينا في:
    ‏19 سبتمبر 2005
    المشاركات:
    5,765
    عدد المعجبين:
    3,889
    الجنس:
    ذكر
    الوظيفة:
    Retired Rolls-Royce engineer
    مكان الإقامة:
    Bath Green Park / Mangotsfield
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Good thinking. It's worked for me for years !! <BJ>
     
  11. 21B

    21B Part of the furniture

    إنضم إلينا في:
    ‏2 سبتمبر 2009
    المشاركات:
    4,379
    عدد المعجبين:
    9,994
    The plan as it stands is to use 45379 and 34007 all week next week. 30925 is away to Swanage. 30850 is stopped for annual exam. 92212 is stopped for ashpan replacement (due to complete in around 2 weeks time). 60019 is available, but would be a last resort given limited number of days available.
     
  12. cymroglan

    cymroglan Member

    إنضم إلينا في:
    ‏9 جوان 2009
    المشاركات:
    591
    عدد المعجبين:
    95
    Much appreciated! Good to know Mr free2grice that you use the same technique as me!
     
  13. 61624

    61624 Part of the furniture

    إنضم إلينا في:
    ‏27 سبتمبر 2006
    المشاركات:
    5,294
    عدد المعجبين:
    3,602
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Weren't 41312 and 76017 supposed to be running by now? What state have they reached?
     
  14. Duty Druid

    Duty Druid Resident of Nat Pres

    إنضم إلينا في:
    ‏19 جويلية 2010
    المشاركات:
    11,137
    عدد المعجبين:
    4,857
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Give them a chance! :rolleyes:

    Other things like repairs to 34007 & 92212 will no doubt have focused attention away from them for a while......... ;)

    Best place as ever to keep up is with the Wednesday gang's blogs. :)

    As the saying goes, they'll be ready when they're ready.............. and I'm led to believe (though could be wrong) the Ivatt doesn't need too much doing so in theory should be out first, but no idea when!
     
  15. Hurricane

    Hurricane Member

    إنضم إلينا في:
    ‏1 نوفمبر 2013
    المشاركات:
    823
    عدد المعجبين:
    307
    الجنس:
    ذكر
    مكان الإقامة:
    71A
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    They are both being worked on, however Ropley MPD is in the fortunate situation to have enough motive power (850, 925,34007, 45379, 4464 & 92212) for this season, so there is no real rush to get them out; as duty druid says they will be ready when they are ready!.
     
    Last edited: ‏10 إبريل 2015
  16. 21B

    21B Part of the furniture

    إنضم إلينا في:
    ‏2 سبتمبر 2009
    المشاركات:
    4,379
    عدد المعجبين:
    9,994
    There is a plan for both 41312 and 76017, and both are nearing the end of their overhauls. However, it would be wrong to share the plan in public just yet since there is still a lot that could change. We have only so many hours in the day and running trains comes first. We are in a hurry to complete them soon, but not rushing the job.
     
    GSN, Swan Age, Hurricane و 2 آخرون معجبون بهذا.
  17. Swan Age

    Swan Age Member

    إنضم إلينا في:
    ‏8 سبتمبر 2005
    المشاركات:
    962
    عدد المعجبين:
    293
    الجنس:
    ذكر
    مكان الإقامة:
    21C101 in the South West
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Sounds a sensible balanced approach. If you let things slow down too much to a trot, then volunteers can lose impetus and interest, however rushing the job too quick is something the MHR of recent years has never done and has paid dividends in overall reliability.

    I think 60019, 45379 and the now departed 31806 are testament to that to name but a few.

    I look forward to seeing 41312 and 76017 back in service sometime in the forthcoming months ahead.
     
    green five و Hurricane معجبون بهذا.
  18. 21B

    21B Part of the furniture

    إنضم إلينا في:
    ‏2 سبتمبر 2009
    المشاركات:
    4,379
    عدد المعجبين:
    9,994
    Contractors finished boring the valve liners on 41312 today. The new valve heads are on order and expected imminently for machining to size. Valve rings and piston rings are in hand too so we will be able to reassemble the motion in a few weeks time.
     
  19. Journalist

    Journalist New Member

    إنضم إلينا في:
    ‏11 جويلية 2014
    المشاركات:
    130
    عدد المعجبين:
    68
    الجنس:
    ذكر
    I'm coming over to the Mid-Hants for a few hours on my morning off on Tuesday, just wondered what time the light engine moves normally leave Ropley before the start of service as I'll be able to get there early and would be good to spend a bit of time around the shed during the prep first thing. Thanks in advance for any info.
     
  20. Jason Cottage

    Jason Cottage New Member

    إنضم إلينا في:
    ‏13 فبراير 2011
    المشاركات:
    79
    عدد المعجبين:
    28
    الجنس:
    ذكر

مشاركة هذه الصفحة