WCRC Licence Suspended

الموضوع في 'What's Going On' بواسطة 5944, بتاريخ ‏2 إبريل 2015.

حالة الموضوع:
مغلق
  1. mrKnowwun

    mrKnowwun Part of the furniture

    إنضم إلينا في:
    ‏22 اكتوبر 2011
    المشاركات:
    4,366
    عدد المعجبين:
    2,823
    الوظيفة:
    Retired
    مكان الإقامة:
    West Byfleet
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I finally got to my reading library (WH SMITHS) and read the second editorial by Nigel Harris. Again I found it to be a second "outraged of cheam" letter to the Times rather than incisive journalism. Two key points, personal condemnation of the driver involved in the SPAD accusing him of lying, ignoring the possibility of what the driver seriously thinks he saw (its a common problem with signals), but the crux being that much was made of the fact that WCRC and David Smith refused to comment or engage with Rail Magazine but had the temerity to speak to someone from another magazine.
     
    RayMason, JohnMc, alastair و 3 آخرون معجبون بهذا.
  2. tromba

    tromba New Member

    إنضم إلينا في:
    ‏7 أوت 2012
    المشاركات:
    61
    عدد المعجبين:
    41
    I'm not so sure. Certainly not in the next few months during the phased return to services. Only time will tell. But remember there were a lot of people saying this couldn't continue at the same pace BEFORE the suspension. Maybe I am just an old cynic.
     
  3. mrKnowwun

    mrKnowwun Part of the furniture

    إنضم إلينا في:
    ‏22 اكتوبر 2011
    المشاركات:
    4,366
    عدد المعجبين:
    2,823
    الوظيفة:
    Retired
    مكان الإقامة:
    West Byfleet
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I do suspect there was rather too much waking up and coffee smelling in your household Its true. :p
     
  4. John Petley

    John Petley Part of the furniture

    إنضم إلينا في:
    ‏8 اكتوبر 2007
    المشاركات:
    2,947
    عدد المعجبين:
    2,524
    الجنس:
    ذكر
    الوظيفة:
    Researcher/writer and composer of classical music
    مكان الإقامة:
    Between LBSCR 221 and LBSCR 227
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    ...still, even if it's not "Business as usual", it's a big step in the right direction.

    My hopes began to rise when Ben Mason of Vintage Trains announced the postponement of 5043's trip to Poole to 30th May. Like a good few other people who have travelled with Vintage Trains, I am very impressed with its professionalism, so if VT was announcing a definite alternative date, it seemed likely that it knew that some positive news was in the offing and some sort of timescale for WCRC to return. Announcing a new date only to postpone it yet again as soon as it was in the public domain just isn't VT's style.

    Having said that, after the seriousness of the event and its aftermath, I guess, like many others, I still didn't want to raise my hopes only to be disappointed - even after your post, Steve. Still, now the Jacobite Stock is on the move with the Riley Fives to follow, we can be thankful for some solid evidence.
     
    أعجب بهذه المشاركة Rich and Louise
  5. Victor

    Victor Nat Pres stalwart Friend

    إنضم إلينا في:
    ‏20 أوت 2006
    المشاركات:
    14,526
    عدد المعجبين:
    9,197
    الوظيفة:
    Retired
    مكان الإقامة:
    DEWSBURY West Yorkshire
    And I'd bet that Mr Smith isn't complaining to NR about the letter, I think if I'd have been in his position I'd be breathing a huge sigh of relief.
    The ball is very much in WC's court now, any more indiscretions and it'll all be over, ORR will be watching VERY closely, NR are waiting to pounce, it will be a stressful time for them.
    I hope WC succeed, directly and indirectly they provide a lot of people with jobs................and they give a lot of pleasure to the travellers who use them
     
    Last edited: ‏9 ماي 2015
    spicer21 و andalfi1 معجبون بهذا.
  6. Steve Sienkiewicz

    Steve Sienkiewicz Member

    إنضم إلينا في:
    ‏21 ماي 2010
    المشاركات:
    315
    عدد المعجبين:
    2,685
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Near Garstang, Lancashire
    Just something that occurred to me.....the lifting of the suspension is perfect timing for the start of the Jacobite. At the end of April, NR indicated that there would be no early revocation of the suspension and following that statement, I think everyone expected nothing further to happen until at least 15th May and probably later than that. Even WCRC in their statement a few days ago eluded to a possible delay in the start of the Jacobite.
    And so to my point.....it got me wondering if any political pressure from North of the border was applied to NR? I guess we'll never know and in any event, I for one am certainly not complaining!
     
  7. mrKnowwun

    mrKnowwun Part of the furniture

    إنضم إلينا في:
    ‏22 اكتوبر 2011
    المشاركات:
    4,366
    عدد المعجبين:
    2,823
    الوظيفة:
    Retired
    مكان الإقامة:
    West Byfleet
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I would think every politico, north or south of the border, was rather more engaged in (to them) more important stuff. If it had any political mileage someone would have used it before the final vote, not quietly slipped it out after.
     
  8. Steve Sienkiewicz

    Steve Sienkiewicz Member

    إنضم إلينا في:
    ‏21 ماي 2010
    المشاركات:
    315
    عدد المعجبين:
    2,685
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Near Garstang, Lancashire
    You have a point but there are still one or two politicians out there who continue to work for what is right for their areas and constituents, regardless of political gain timing. You don't know who knows who in this game and one or two phone calls between influencers and decision makers can make all the difference, not just in this case but in all walks of life.
     
    Greenway و Sheff معجبون بهذا.
  9. mrKnowwun

    mrKnowwun Part of the furniture

    إنضم إلينا في:
    ‏22 اكتوبر 2011
    المشاركات:
    4,366
    عدد المعجبين:
    2,823
    الوظيفة:
    Retired
    مكان الإقامة:
    West Byfleet
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Having a major railway disaster in your constituency is not good for your constituents
    And being one of those responsible for short circuiting a safety issue for political or constituents gain is not good for your constituents, your party, your own career, possibly even your liberty.
     
    أعجب بهذه المشاركة andalfi1
  10. sgthompson

    sgthompson Part of the furniture Friend

    إنضم إلينا في:
    ‏12 جوان 2008
    المشاركات:
    4,010
    عدد المعجبين:
    9,837
    الجنس:
    ذكر
    الوظيفة:
    Tobacco manufacturing
    مكان الإقامة:
    Kendal
    Thanks Steve, not steam but good to see WCRC moving on the rails again .
     
  11. Big Al

    Big Al Nat Pres stalwart Staff Member Moderator

    إنضم إلينا في:
    ‏30 ماي 2009
    المشاركات:
    22,591
    عدد المعجبين:
    22,721
    مكان الإقامة:
    1016
    Heritage Railway Volunteer:
    No I do not currently volunteer
    A post and comments about it have been removed for moderation. Same issue as before.
     
  12. Steve Sienkiewicz

    Steve Sienkiewicz Member

    إنضم إلينا في:
    ‏21 ماي 2010
    المشاركات:
    315
    عدد المعجبين:
    2,685
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Near Garstang, Lancashire
    Absolutely, but I wasn't suggesting for one minute that the suspension would have been lifted if there had been any remaining concerns regarding WCRCs safety case, even in the remotest sense. That would have been plainly ridiculous.
     
    أعجب بهذه المشاركة Sheff
  13. Swiss Toni

    Swiss Toni Well-Known Member

    إنضم إلينا في:
    ‏9 نوفمبر 2008
    المشاركات:
    1,961
    عدد المعجبين:
    3,664
    مكان الإقامة:
    Switzshire
    but that wouldn't matter in Scotland though...............would it? [​IMG]
     
  14. 30567

    30567 Part of the furniture Friend

    إنضم إلينا في:
    ‏7 أوت 2012
    المشاركات:
    6,125
    عدد المعجبين:
    4,088
    Surely given their respective roles, if NR have decided/agreed with WCR that lifting the suspension on the basis of a phased implementation plan starting with a relatively simple self-contained operation is an acceptable way forward, ORR is not going to reject that. No doubt there will be briefings and questions. If it had gone the other way, then ORR would have come into play bigtime and it needed to prepare the ground for that with its consultation and leave the parties in no doubt as to its seriousness.

    It will be interesting to see what step 2 along the road is, assuming step 1 goes well.
     
  15. mrKnowwun

    mrKnowwun Part of the furniture

    إنضم إلينا في:
    ‏22 اكتوبر 2011
    المشاركات:
    4,366
    عدد المعجبين:
    2,823
    الوظيفة:
    Retired
    مكان الإقامة:
    West Byfleet
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I'm not sure there is a defined "step 2", there was certainly no provisos, intermediate requirements, or milestones specified by NR. Its seems to me, based on that published by NR, that the phased implementation was a sensible conciliatory offer from WCRC. Its a good indication of the less confrontational management attitude of WCRC.
     
  16. Sheff

    Sheff Resident of Nat Pres

    إنضم إلينا في:
    ‏21 إبريل 2006
    المشاركات:
    8,059
    عدد المعجبين:
    3,138
    الجنس:
    ذكر
    الوظيفة:
    Retired Engineer & Heritage Volunteer
    مكان الإقامة:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Really? Quote "This will include reviewing with you in three months the progress made by you in working within your new governance structure and Safety Management System".
     
  17. mrKnowwun

    mrKnowwun Part of the furniture

    إنضم إلينا في:
    ‏22 اكتوبر 2011
    المشاركات:
    4,366
    عدد المعجبين:
    2,823
    الوظيفة:
    Retired
    مكان الإقامة:
    West Byfleet
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Pretty non descriptive in milestones and specifics tho isn't it. No mention of restrictions before that date, no mention of what can be achieved after that date. No mention in any way of what specifics needs to be achieved by that meeting. Its a review, nothing more nothing less.
     
  18. mrKnowwun

    mrKnowwun Part of the furniture

    إنضم إلينا في:
    ‏22 اكتوبر 2011
    المشاركات:
    4,366
    عدد المعجبين:
    2,823
    الوظيفة:
    Retired
    مكان الإقامة:
    West Byfleet
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Edit, I will tell you one thing NR will be expecting at that review. They will be expecting to be shown documented examples of where WCRC have tested the SMS, they might even be expecting to be shown examples of where in practise the SMS has holes and what steps WCRC have taken to resolve them.
     
  19. Christopher125

    Christopher125 Part of the furniture

    إنضم إلينا في:
    ‏30 نوفمبر 2005
    المشاركات:
    2,846
    عدد المعجبين:
    581
    مكان الإقامة:
    Isle of Wight
    Did they? That's not the impression I had, I thought it was WCRC that suggested there'd be no further progress until the 15th but I'm happy to be corrected.
     
  20. spicer21

    spicer21 Guest

    Yes, indeed, I would expect all of that to happen as well.
     
حالة الموضوع:
مغلق