If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Diesel Failures on Penzance Sleeper

本贴由 free2grice2015-08-17 发布. 版块名称: Diesel & Electric Traction

  1. free2grice

    free2grice Part of the furniture Friend

    注册日期:
    2005-09-19
    帖子:
    5,657
    支持:
    3,686
    性别:
    职业:
    Retired Rolls-Royce engineer
    所在地:
    Bath Green Park / Mangotsfield
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Passengers that use FGW's sleeper services are used to loco failures. It's quite common for FGW class 57 diesels to fail.
    They run in top 'n tail mode for this reason.
    On one occasion a sleeper train failed at Bristol Parkway. The second loco was started up as a replacement.....it also failed. :rolleyes: <BJ>
     
  2. 34098

    34098 Member Account Suspended

    注册日期:
    2010-06-22
    帖子:
    587
    支持:
    138
    职业:
    ,
    所在地:
    82G
    Heritage Railway Volunteer:
    No I do not currently volunteer
    they don't run in tnt mode for that reason, you have been misinformed.
    Yeah on occasion it goes wrong like that, but they have the resources near by to help with this,
    back to back power cars for example.
     
  3. free2grice

    free2grice Part of the furniture Friend

    注册日期:
    2005-09-19
    帖子:
    5,657
    支持:
    3,686
    性别:
    职业:
    Retired Rolls-Royce engineer
    所在地:
    Bath Green Park / Mangotsfield
    Heritage Railway Volunteer:
    No I do not currently volunteer
    On the subject of loco failures at Newton Abbot, here is an extract from SWRG this morning.......

    >> FGW 57.605 1C99 Paddington to Penzance sleeper arrive Newton Abbot at 04:34 and declared a failure.

    :rolleyes: <BJ>
     
  4. royals pete

    royals pete Member

    注册日期:
    2008-07-16
    帖子:
    766
    支持:
    50
    所在地:
    Woodley nr Reading
    Question......what do you do at Newton Abbot at 04.30 when the train stops for good ?? Do they just leave you asleep till the next Penzance turns up 07.38, or get woken up for the .06.17 Newquay...or........ Wonder if there are any 'plan Bs' along the line !!! sorry Al, bit off tack but interesting eh ? Pete
     
  5. Robbo

    Robbo Member

    注册日期:
    2005-09-08
    帖子:
    541
    支持:
    44
    性别:
    Road transport to Penzance apparently.
     
  6. Tony172

    Tony172 New Member

    注册日期:
    2014-09-08
    帖子:
    167
    支持:
    32
    性别:
    职业:
    Engineer
    所在地:
    Bristol
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    No back to back power cars then?


    Sent from my iPhone using Tapatalk
     
    已获得Spamcan81的支持.
  7. colin33

    colin33 New Member

    注册日期:
    2007-07-21
    帖子:
    6
    支持:
    1
     
  8. Robbo

    Robbo Member

    注册日期:
    2005-09-08
    帖子:
    541
    支持:
    44
    性别:
    Yes back-to-back power cars took ECS to Laira apparently.
     
  9. 34098

    34098 Member Account Suspended

    注册日期:
    2010-06-22
    帖子:
    587
    支持:
    138
    职业:
    ,
    所在地:
    82G
    Heritage Railway Volunteer:
    No I do not currently volunteer

    good job they were closer by then Bristol.........
     
  10. martin1656

    martin1656 Nat Pres stalwart Friend

    注册日期:
    2014-12-08
    帖子:
    19,416
    支持:
    12,617
    性别:
    所在地:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Not exactly to do with sleepers, but on my last return from Swindon, my train only had 1 working power car , apparently the rear car failed at Bristol it was some 7 minutes down at Swindon but we still arrived only some 3 minutes down at London, so how often do HST sets have to run on a single power car, and whilst Bristol to Paddington may not effect the performance too much, i do wonder would a single power car cope over the Devon banks?
     
  11. Spamcan81

    Spamcan81 Nat Pres stalwart

    注册日期:
    2007-08-25
    帖子:
    35,921
    支持:
    22,441
    职业:
    Training moles
    所在地:
    The back of beyond
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    AFAIK IC125 sets are not allowed over the Devon Banks with only one working power car.
     
  12. Pete Thornhill

    Pete Thornhill Resident of Nat Pres Staff Member Administrator Moderator Friend

    注册日期:
    2008-07-24
    帖子:
    7,831
    支持:
    6,079
    Sometimes having two power cars isn't a complete fail safe mind as FGW found out yesterday morning when one of their HST's sat down at Ledbury for two hours right during the morning peak resulting in some big delays.
     
  13. Spamcan81

    Spamcan81 Nat Pres stalwart

    注册日期:
    2007-08-25
    帖子:
    35,921
    支持:
    22,441
    职业:
    Training moles
    所在地:
    The back of beyond
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Made no difference to the passengers though did it. They had to go onward by road.
     
  14. Spamcan81

    Spamcan81 Nat Pres stalwart

    注册日期:
    2007-08-25
    帖子:
    35,921
    支持:
    22,441
    职业:
    Training moles
    所在地:
    The back of beyond
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Amazingly little froth about this from one certain individual on this thread. :)
     
    已获得RalphWPete Thornhill的支持.
  15. Pete Thornhill

    Pete Thornhill Resident of Nat Pres Staff Member Administrator Moderator Friend

    注册日期:
    2008-07-24
    帖子:
    7,831
    支持:
    6,079
    Let's just say more people were affected by it than the Royal Duchy problems combined ;)
     
    已获得Spamcan81的支持.
  16. david1984

    david1984 Resident of Nat Pres

    注册日期:
    2005-09-13
    帖子:
    12,910
    支持:
    1,387
    性别:
    所在地:
    Birmingham
    I think they are now, on the provision a non stop run through Totnes can be given.
     

分享此页面