If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

71000 Duke fundraising efforts

الموضوع في 'Steam Traction' بواسطة mike1522, بتاريخ ‏24 جويلية 2015.

  1. mike1522

    mike1522 Long Time Member Friend

    إنضم إلينا في:
    ‏9 اكتوبر 2010
    المشاركات:
    2,002
    عدد المعجبين:
    237
    مكان الإقامة:
    Fort Worth, Texas
    I was on their website and heard that ads had been sent out in rail preservation magazines. How is it going with the 8P? So much is based in Crewe these days.

    Cheers
     
  2. Matt37401

    Matt37401 Nat Pres stalwart

    إنضم إلينا في:
    ‏8 جوان 2014
    المشاركات:
    15,552
    عدد المعجبين:
    11,961
    مكان الإقامة:
    Wnxx
    Heritage Railway Volunteer:
    No I do not currently volunteer
    According to Steam Railway the 'Duke' has a decent chance of steaming in 2018, they've found someone willing to write a cheque for an unspecified amount.
     
    أعجب بهذه المشاركة mike1522
  3. Matt37401

    Matt37401 Nat Pres stalwart

    إنضم إلينا في:
    ‏8 جوان 2014
    المشاركات:
    15,552
    عدد المعجبين:
    11,961
    مكان الإقامة:
    Wnxx
    Heritage Railway Volunteer:
    No I do not currently volunteer
    And apparantly the Brass numbers will be no more. 71000 will emerge as it did from Crewe in 1954
     
  4. 99Z

    99Z Guest

    Deleted
     
    Last edited by a moderator: ‏3 أوت 2015
  5. Matt37401

    Matt37401 Nat Pres stalwart

    إنضم إلينا في:
    ‏8 جوان 2014
    المشاركات:
    15,552
    عدد المعجبين:
    11,961
    مكان الإقامة:
    Wnxx
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Fair enough but I'm quoting from what I have in front of me, it'll also be running with lion over the wheel rather than ferret and dartboard
     
  6. Gav106

    Gav106 Well-Known Member

    إنضم إلينا في:
    ‏29 مارس 2010
    المشاركات:
    1,772
    عدد المعجبين:
    2,171
    مكان الإقامة:
    Nantwich, Cheshire
    From what i understand a member passed away and has left a very large cheque to the Duke. So this should give them enough to start to overhaul. Good luck to them and i hope to see it in steam in the not too distant future.
     
  7. John Petley

    John Petley Part of the furniture

    إنضم إلينا في:
    ‏8 اكتوبر 2007
    المشاركات:
    2,957
    عدد المعجبين:
    2,542
    الجنس:
    ذكر
    الوظيفة:
    Researcher/writer and composer of classical music
    مكان الإقامة:
    Between LBSCR 221 and LBSCR 227
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Same here. I've yet to sample the Duke on the main line and am very keen to do so. My only run behind it was a short trip on the WSR in 1995, alighting at Washford. Kentsford Bank behind, say, a Manor or a Large Prairie can be fun, but 71000 didn't actually seem aware that there was an uphill gradient at all, let alone that parts of it were as steep as 1 in 74.
     
    Last edited: ‏27 جويلية 2015
  8. 61624

    61624 Part of the furniture

    إنضم إلينا في:
    ‏27 سبتمبر 2006
    المشاركات:
    5,294
    عدد المعجبين:
    3,599
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The 1 in 49 between Grosmont and Goathland didn't seem to bother it much either. Hopefully it will make a return visit one day.
     
  9. mike1522

    mike1522 Long Time Member Friend

    إنضم إلينا في:
    ‏9 اكتوبر 2010
    المشاركات:
    2,002
    عدد المعجبين:
    237
    مكان الإقامة:
    Fort Worth, Texas
    I'm really glad that the Duke shall be going into overhaul. Big news item for me this week!
     
  10. mike1522

    mike1522 Long Time Member Friend

    إنضم إلينا في:
    ‏9 اكتوبر 2010
    المشاركات:
    2,002
    عدد المعجبين:
    237
    مكان الإقامة:
    Fort Worth, Texas
    Does anyone know if The Duke is going in once either Royal Scot or Braunton depart?
     
  11. buseng

    buseng Part of the furniture

    إنضم إلينا في:
    ‏9 سبتمبر 2005
    المشاركات:
    4,801
    عدد المعجبين:
    349
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Tilehurst, Reading, Berks.
    Looks like there is a bit of a setback with the overhaul.
    Just read the latest SR arrived today, seems LNWR Crewe are now "too busy" to undertake the overhaul.
    Look as if they are cutting down on third party work & want to concentrate on "in house" work.
    Mention has been made of 35028's overhaul, stated that as work has started it will continue.
    Another overhaul location may have to be looked for.
    Possibly Riley's now 60103 is nearing completion?
     
  12. mike1522

    mike1522 Long Time Member Friend

    إنضم إلينا في:
    ‏9 اكتوبر 2010
    المشاركات:
    2,002
    عدد المعجبين:
    237
    مكان الإقامة:
    Fort Worth, Texas
    Shame on them.
     
  13. 61624

    61624 Part of the furniture

    إنضم إلينا في:
    ‏27 سبتمبر 2006
    المشاركات:
    5,294
    عدد المعجبين:
    3,599
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Shame on them.
    Why? they have their own fleet to maintain, and they know they'll be able to do that work as it suits them rather than have to wait for a third party to be able to afford to pay them. It's a commercial decision, and we should respect that.
     
    Matt37401, 99Z, 26D_M و 4 آخرون معجبون بهذا.
  14. BillyReopening

    BillyReopening Member

    إنضم إلينا في:
    ‏17 سبتمبر 2012
    المشاركات:
    830
    عدد المعجبين:
    581
    الجنس:
    ذكر
    الوظيفة:
    Freelance Trumpet Player // IT Engineer
    مكان الإقامة:
    South West
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I think it will be increasingly difficult to get the big "houses" to undertake overhauls unless its a start ---> finish complete job with all monies available. Can't blame them really, it cant be helpful to have a partially finished job sitting around for potentially 5+ years with no work going on.

    Saying No is always hard to do and I think Crewe should be applauded for their honesty - knowing the situation before the job starts is better than stripping a loco and it ending up in bits for 10 years...
     
    99Z و std tank معجبون بهذا.
  15. Pete Thornhill

    Pete Thornhill Resident of Nat Pres Staff Member Administrator Moderator Friend

    إنضم إلينا في:
    ‏24 جويلية 2008
    المشاركات:
    7,833
    عدد المعجبين:
    6,080
    I don't think it's just the money. It's also that as time marches on, the work required increases which makes it more difficult to balance the contract work with the in house work. That is a problem that is not unique to LNWR.
     
  16. buseng

    buseng Part of the furniture

    إنضم إلينا في:
    ‏9 سبتمبر 2005
    المشاركات:
    4,801
    عدد المعجبين:
    349
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Tilehurst, Reading, Berks.
    Not sure of the legalities here?
    Wasn't the work agreed to be carried out originally, was some form of contract agreed/signed?
     
  17. 61624

    61624 Part of the furniture

    إنضم إلينا في:
    ‏27 سبتمبر 2006
    المشاركات:
    5,294
    عدد المعجبين:
    3,599
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Don't go there. If it comes to legal arguments we know which party has the deeper pockets!
     
  18. mike1522

    mike1522 Long Time Member Friend

    إنضم إلينا في:
    ‏9 اكتوبر 2010
    المشاركات:
    2,002
    عدد المعجبين:
    237
    مكان الإقامة:
    Fort Worth, Texas
    Well, I think Tyseley might be a good option. What do I know though?
     
  19. Pete Thornhill

    Pete Thornhill Resident of Nat Pres Staff Member Administrator Moderator Friend

    إنضم إلينا في:
    ‏24 جويلية 2008
    المشاركات:
    7,833
    عدد المعجبين:
    6,080
    I'm sure they thought of that and any potential situations when they drew up the contract if indeed one exists.
     
  20. Gav106

    Gav106 Well-Known Member

    إنضم إلينا في:
    ‏29 مارس 2010
    المشاركات:
    1,772
    عدد المعجبين:
    2,171
    مكان الإقامة:
    Nantwich, Cheshire
    I can understand LNWR starting to refuse work. With the amount of engines the group/Hoskins owns he will surely have enough work to keep his employees busy without the need for distractions of other loco societies. And then when they start moaning saying the work isnt done on time because he has used the engineers to work on his own locos. It looks like with the people being taken on for coaches that he is creating his own rake/s for his engines to use also so its a one stop shop for his business set up. Im sure if there is the odd times when LNWR are not busy he can slip in contract work to keep the staff in work. But at that point he can choose loco societies who have enough to pay for the overhaul in one go, not groups saying well do a bit then stop then do a bit.
     