    Well as that seems to be breaking news, undoubtedly too early to say. I seem to recall that the "additional costs" were on the basis that they may need to build the bridge without sharing possessions etc. - clearly there will now be some possessions and I daresay they will aim to share them if they can, but I don't know whether they got as far as setting any timescales for the bridge in the light of the 'pause' - all that I saw said that they would look at doing other elements of the 'gap' scheme in a different order, and I guess that they still could do that. Better to maintain momentum than delay the whole scheme, if the bridge itself is better delayed a bit to save costs, I'd have thought. But this is just my opinion of course!
     
    David R apreciază asta.
  2. mikechant

    mikechant Member

    Înscris:
    24 Oct 2012
    Mesaje:
    228
    Aprecieri primite:
    245
    The good thing is that based on this you'd expect NR to want to get the bridge works done by about 2020 or 2021 at the very latest so this would bring things back within the general hoped-for timescales for the reunification project.
    The bridge works may well be done earlier than this since the main problems with MML electrification seem to be availability of expertise and equipment for the actual electrification works, which doesn't really affect preparations like this.
     
  3. David R

    David R Well-Known Member

    Înscris:
    30 Iul 2013
    Mesaje:
    1.020
    Aprecieri primite:
    1.391
    Sex:
    Masculin
    Locație:
    Surrey
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Lplus și jnc apreciază asta.
  4. mikechant

    mikechant Member

    Înscris:
    24 Oct 2012
    Mesaje:
    228
    Aprecieri primite:
    245
    Saw this snippet
    "Great Central supporter pays £350K to repair key bridge"

    In the news section of the issue description of Issue 207 of "Heritage Railway" magazine.

    I don't have a copy or online access to this magazine and can't find any other references to this in the usual places.
    Anyone know about this? It sounds like someone might be paying towards (or the whole amount of) the refurbishment of the canal bridge - unless this is nothing to with 'bridge the gap' and is in relation to another bridge somewhere on the existing line.

    Link to HR mag issue 207 summary:
    http://www.classicmagazines.co.uk/issue/View/issue/HR207/issue-207
     
  5. Martin Perry

    Martin Perry Nat Pres stalwart Staff Member Moderator Friend

    Înscris:
    15 Apr 2006
    Mesaje:
    16.552
    Aprecieri primite:
    7.905
    Locație:
    1012 / 60158
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    They had to do some repairs to a bridge at Swithland I believe.

    Sent from my SM-G900F using Tapatalk
     
  6. 35B

    35B Nat Pres stalwart

    Înscris:
    18 Iun 2011
    Mesaje:
    29.168
    Aprecieri primite:
    29.588
    Sex:
    Masculin
    Locație:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    They have - reported in the latest copy of "Main Line".
     
  7. pmh_74

    pmh_74 Part of the furniture

    Înscris:
    28 Ian 2009
    Mesaje:
    2.443
    Aprecieri primite:
    1.749
    It's actually the steel span of the south viaduct, which is also the reason for the 10mph TSR at present.
     
  8. 46118

    46118 Part of the furniture

    Înscris:
    16 Sep 2005
    Mesaje:
    4.043
    Aprecieri primite:
    212
    I have seen a comment on another forum that a ceremony is to take place at Loughborough in the near future to mark the start of work on the bridge over the MML.

    Anyone in the know care to comment?

    Nothing posted on the GCR website as such.
     
  9. Raimondo

    Raimondo New Member

    Înscris:
    24 Oct 2005
    Mesaje:
    135
    Aprecieri primite:
    116
  10. philw2

    philw2 Member

    Înscris:
    30 Apr 2011
    Mesaje:
    494
    Aprecieri primite:
    86
    See current Railway Herald issue..
     
  11. MellishR

    MellishR Resident of Nat Pres Friend

    Înscris:
    16 Apr 2009
    Mesaje:
    8.992
    Aprecieri primite:
    5.920
    Although the deck will be single track, the "Network Rail visualisation of the new bridge" appears to show piers wide enough for two tracks. Is that the intention?

    I also note with some surprise that "The project was originally to be managed by Network Rail as part of the electrification of the Midland Main Line.

    "However, following the ‘pausing’ and ‘restarting’ of the electrification, the Great Central will now drive the project forward itself, with Network Rail providing support."
     
  12. Pesmo

    Pesmo Member

    Înscris:
    26 Dec 2008
    Mesaje:
    817
    Aprecieri primite:
    125
  13. ilvaporista

    ilvaporista Part of the furniture

    Înscris:
    16 Ian 2006
    Mesaje:
    4.356
    Aprecieri primite:
    5.456
    Sex:
    Masculin
    Ocupație:
    C.Eng
    Locație:
    On the 45th!
    I think that is just an optical illusion of the computer generated image. The green lower beam is the 'trough' of the structure, the pier is only for a single line.
     
  14. ilvaporista

    ilvaporista Part of the furniture

    Înscris:
    16 Ian 2006
    Mesaje:
    4.356
    Aprecieri primite:
    5.456
    Sex:
    Masculin
    Ocupație:
    C.Eng
    Locație:
    On the 45th!
  15. class8mikado

    class8mikado Part of the furniture

    Înscris:
    1 Iun 2009
    Mesaje:
    3.854
    Aprecieri primite:
    1.655
    Ocupație:
    Print Estimator/ Repository of Useless Informatio.
    Locație:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Sorry if this has been mentioned earlier, but the Great central Station is some considerable distance ( on foot at least) from Loughborough (Network rail).
    Either for the purposes of serving incoming Customers (weekends) or as part of an integrated transport service to destinations along the line ( Weekdays) is an intermediate halt planned (Close to the Chord line Junction / A60 bridge perhaps) at all ?
     
  16. huochemi

    huochemi Part of the furniture

    Înscris:
    6 Mai 2008
    Mesaje:
    3.044
    Aprecieri primite:
    1.539
    Sex:
    Masculin
    Locație:
    UK
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I think it has been looked at but is deemed too difficult / expensive. The A60 is very narrow here so even if building a station on an embankment was possible, it remains difficult access unless Brush relocates.
     
  17. 46118

    46118 Part of the furniture

    Înscris:
    16 Sep 2005
    Mesaje:
    4.043
    Aprecieri primite:
    212
    Looking at the images on the GC website, the view across the MML appears to show the route totally blocked by the Preci- Spark factory.
    Can some kind soul familiar with the location confirm if the GC embankment is immediately to the left of the factory? Not really obvious from the images. Presumably the new over-bridge crosses the MML at an angle? Or not, as the case may be!

    46118
     
  18. ilvaporista

    ilvaporista Part of the furniture

    Înscris:
    16 Ian 2006
    Mesaje:
    4.356
    Aprecieri primite:
    5.456
    Sex:
    Masculin
    Ocupație:
    C.Eng
    Locație:
    On the 45th!
    Yes the bridge is at an angle across the MML and according to pieces I have read there is room, just, to get a line alongside the factory. I am sure that somebody with a much better knowledge of the GCR will be along shortly.
     
  19. MarkinDurham

    MarkinDurham Well-Known Member

    Înscris:
    4 Mai 2007
    Mesaje:
    2.229
    Aprecieri primite:
    999
    Locație:
    Durham
    I would suggest that were there any issues with reinstatement, other than the bridge across the MML, (and money!), they would have been discussed already :)
     
    Wenlock și The Dainton Banker apreciază asta.
  20. GWR Man.

    GWR Man. Well-Known Member

    Înscris:
    8 Oct 2014
    Mesaje:
    2.267
    Aprecieri primite:
    2.751
    Sex:
    Masculin
    Locație:
    Taunton
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Any help. https://www.google.co.uk/maps/@52.7778457,-1.1929758,422m/data=!3m1!1e3
     

Distribuie pagina asta