If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Line side scenery- telegraph poles

Тема в разделе 'Heritage Railways & Centres in the UK', создана пользователем Grashopper, 23 дек 2013.

  1. Matt37401

    Matt37401 Nat Pres stalwart

    Дата регистрации:
    8 июн 2014
    Сообщения:
    15.551
    Симпатии:
    11.955
    Адрес:
    Wnxx
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I agree with you on that for example at Highley before the line was washed away there was some Token pickup/setdown equipment. Never saw it used but it added to the Ambience, unfortunatly I dont know whats happened to it since the floods.
     
  2. Forestpines

    Forestpines Well-Known Member

    Дата регистрации:
    5 июн 2009
    Сообщения:
    1.681
    Симпатии:
    2.438
    Пол:
    Женский
    Адрес:
    Somewhere in the UK
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I recall being involved in extending the B&KR's pole route from, I think, the up section signal to either the down outer home or down distant, in about 2000-2001. The extended pole route was partly for ambience, but was largely for track circuiting and to provide electric lamps in the two down signals mentioned.
     
  3. Islander

    Islander Member

    Дата регистрации:
    11 май 2006
    Сообщения:
    313
    Симпатии:
    306
    Пол:
    Мужской
    Адрес:
    Isle of Wight
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    TonyMay, CH 19, paulhitch и ещё 1-му нравится это.
  4. Islander

    Islander Member

    Дата регистрации:
    11 май 2006
    Сообщения:
    313
    Симпатии:
    306
    Пол:
    Мужской
    Адрес:
    Isle of Wight
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The telegraph pole project continues with more work completed in the Wootton section last weekend. The next stage is to 'dress' the poles with foot-steps, cross-arms with insulators and a ‘tin hat’ – the finial to prevent the ingress of rainwater. This is scheduled to take place in November. Meanwhile work is ongoing to source the porcelain insulators, which may have to come from as far afield as China or India! Link to the IWSR website update here.
     
  5. Islander

    Islander Member

    Дата регистрации:
    11 май 2006
    Сообщения:
    313
    Симпатии:
    306
    Пол:
    Мужской
    Адрес:
    Isle of Wight
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The next stage of the IWSR Telegraph Pole Project is about to get underway, more details are on the IWSR web site.
     
    CH 19, Grashopper, Charles Parry и 2 другим нравится это.
  6. Robkitchuk

    Robkitchuk Member

    Дата регистрации:
    7 июн 2013
    Сообщения:
    324
    Симпатии:
    358
    Пол:
    Мужской
    Адрес:
    Durham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The few telegraph poles at Beamish have just been set to install an internal phone system.
     
  7. Ploughman

    Ploughman Part of the furniture

    Дата регистрации:
    1 апр 2008
    Сообщения:
    5.969
    Симпатии:
    2.761
    Род занятий:
    Ex a lot of things.
    Адрес:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I hope that you will be wiring up the route correctly using proper transpositions to avoid interference.
    So that all wires gradually rotate around and are not in the same position all the way.
     
  8. Islander

    Islander Member

    Дата регистрации:
    11 май 2006
    Сообщения:
    313
    Симпатии:
    306
    Пол:
    Мужской
    Адрес:
    Isle of Wight
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The project initiator is a BT infrastructure professional, I expect he is all over the correct wiring method!
     
    PaulB, Jamessquared, paulhitch и ещё 1-му нравится это.
  9. Ploughman

    Ploughman Part of the furniture

    Дата регистрации:
    1 апр 2008
    Сообщения:
    5.969
    Симпатии:
    2.761
    Род занятий:
    Ex a lot of things.
    Адрес:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    wiring 1.jpg Hope I did not seem to be being awkward or anything, did not intend that.
    However, What I intended to mean is best shown in the attached scan.
    This is for a Telegraph Pole route and is LNER in origin but I would expect all the railway companies to have had this sort of layout on their pole routes.

    Apologies for the angle of the scan but the drawing is from an LNER Technicians pocket book and I do not intend trying to take the drawing out of the binder as some of the other drawings are quite delicate.

    wiring 1.jpg
     
  10. Islander

    Islander Member

    Дата регистрации:
    11 май 2006
    Сообщения:
    313
    Симпатии:
    306
    Пол:
    Мужской
    Адрес:
    Isle of Wight
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Interesting, the linesmen would have their work cut out trying to identify which wire was which when tracing the location of a fault along the run?
     
    nick813 нравится это.
  11. pmh_74

    pmh_74 Part of the furniture

    Дата регистрации:
    28 янв 2009
    Сообщения:
    2.423
    Симпатии:
    1.707
    Interesting. I have the pole route drawings for part of the Met/GC around Great Missenden somewhere, I will have to see if they show transpositions or just pairs. Don't have a clue where they are though following various house moves, so don't hold your breath!

    I can't see why a linesman would struggle with this though since the lines are in consistent pairs along the run and preumably you'd normally be changing or testing one wire at a time.
     
  12. John Webb

    John Webb Member

    Дата регистрации:
    2 мар 2010
    Сообщения:
    501
    Симпатии:
    86
    Род занятий:
    Retired
    Адрес:
    St Albans, Herts
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The reason for transposition, by the way, is to minimise interference/pick-up between different circuits. The transpositions are arranged so that one pair of wires are exposed to equal but opposite induction fields from the adjacent pair(s) of wire(s) over the run, which should cancel out any interference the induction causes.
     
  13. meeee

    meeee Member

    Дата регистрации:
    28 мар 2006
    Сообщения:
    886
    Симпатии:
    1.382
    Doesn't Beamish also have a Strowger telephone exchange? Sadly the ones at the Festiniog are suffering and slowly being replaced with modern equipment because we can no longer find people with the knowledge and time to maintain them. It's real shame as the extensive internal system, complete with traditional pole route and electro-mechanical exchanges is probably the largest of it's type still left in the country.

    Tim
     
  14. Islander

    Islander Member

    Дата регистрации:
    11 май 2006
    Сообщения:
    313
    Симпатии:
    306
    Пол:
    Мужской
    Адрес:
    Isle of Wight
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The IWSR Telegraph Pole Project Team started their 2015/16 winter work programme today. Despite some pretty dismal weather, rapid progress was being made. See the report on the IWSR website for more details and pictures.
     
    PaulB и paulhitch нравится это.
  15. Robkitchuk

    Robkitchuk Member

    Дата регистрации:
    7 июн 2013
    Сообщения:
    324
    Симпатии:
    358
    Пол:
    Мужской
    Адрес:
    Durham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Yes I believe that's the case, ex bt. It now has around 50 Telephones connected and growing.
     
  16. Islander

    Islander Member

    Дата регистрации:
    11 май 2006
    Сообщения:
    313
    Симпатии:
    306
    Пол:
    Мужской
    Адрес:
    Isle of Wight
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    A summary of the progress made so far this year on our Telegraph Pole Project has just been published on the IWSR website. Only a handful of poles now need attention before we can move on to wiring up the Havenstreet - Wootton section.
     
    gios, CH 19 и paulhitch нравится это.
  17. John Stewart

    John Stewart Part of the furniture

    Дата регистрации:
    22 сен 2011
    Сообщения:
    4.206
    Симпатии:
    2.072
    Пол:
    Мужской
    Род занятий:
    Retired
    Адрес:
    Hilton, Derby
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Reading this thread made me wonder why people see wooden poles with wires hanging from them as a wonderful part of the railway scene but think that steel poles with wires hanging over the track are ugly.:confused:
     
  18. GWR Man.

    GWR Man. Well-Known Member

    Дата регистрации:
    8 окт 2014
    Сообщения:
    2.259
    Симпатии:
    2.695
    Пол:
    Мужской
    Адрес:
    Taunton
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Well it is a shocking idea to put these wires above the running lines in the first place.:D
     

Поделиться этой страницей