If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Bluebell Railway General Discussion

Discuție în 'Heritage Railways & Centres in the UK' creată de Jamessquared, 16 Feb 2013.

  1. 21B

    21B Part of the furniture

    Înscris:
    2 Sep 2009
    Mesaje:
    3.893
    Aprecieri primite:
    8.652
    Ahh. I see. Well I don't know about the specifics of that, you may be right, or it may be that the perfectly good reason is that no one had the time or inclination to do it differently and so defaulted to the easy and probably cheaper route. We all do that at times.
     
  2. David R

    David R Well-Known Member

    Înscris:
    30 Iul 2013
    Mesaje:
    1.019
    Aprecieri primite:
    1.390
    Sex:
    Masculin
    Locație:
    Surrey
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Back to the Elephant Van and some pictures as at yesterday

    David R
     

    Fișiere atașate:

    Extension3363 și gwalkeriow apreciază asta.
  3. David R

    David R Well-Known Member

    Înscris:
    30 Iul 2013
    Mesaje:
    1.019
    Aprecieri primite:
    1.390
    Sex:
    Masculin
    Locație:
    Surrey
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    A couple of photos of the new shed going up from yesterday

    David R
     

    Fișiere atașate:

    Extension3363 apreciază asta.
  4. Jamessquared

    Jamessquared Nat Pres stalwart

    Înscris:
    8 Mar 2008
    Mesaje:
    27.793
    Aprecieri primite:
    64.460
    Locație:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    From the Bluebell e-Newsletter:

    "INFRASTRUCTURE NEWS: PILING ON

    With work on the footbridge complete, and with slightly better weather of late, it was an ideal opportunity to get the foundations dug for the piling and associated concrete plinths to be installed ready for the new platform starter signals at Sheffield Park.

    Piling is required because it is effectively made-up ground on what were the banks of the river in the days before the railway came to town. The new tapered signal posts have arrived, and are waiting in the yard for the pre-fabricated and galvanised metal bases that will support them.

    Once fitted together, and with the posts painted, the signals will be "dressed" by the S&T Department using refurbished spare parts and some fittings from the original signals that are being repainted.

    The whole assembly will then be lifted into place and bolted to the studs set in the concrete foundations. With the road-railer on hand to mix large volumes of concrete in the trailer, we also have taken the opportunity to cast the concrete abutment for River Bridge so that we can terminate the new handrails on the southern end. A new abutment at the northern end is not quite so urgent, so this can be done at a later date.

    By Mike Hopps, Infrastructure Volunteer"

    Also from the e-Newsletter, the ASH (Accessible Steam Heritage) project has reached £105,000, or 50% of the target so far. Thanks to everyone who has donated so far. For those that missed it lats time round, the appeal video explains the need for the project:



    and there is also a page on the website explaining the project and with some schematic visualisations of how it might develop: http://www.bluebell-railway.co.uk/bluebell/trust/appeal/about.html

    Tom
     
    David R apreciază asta.
  5. Extension3363

    Extension3363 New Member

    Înscris:
    5 Iun 2014
    Mesaje:
    31
    Aprecieri primite:
    47
    Locație:
    75B
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    David R apreciază asta.
  6. Extension3363

    Extension3363 New Member

    Înscris:
    5 Iun 2014
    Mesaje:
    31
    Aprecieri primite:
    47
    Locație:
    75B
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The locking bot has been fitted to the NW double doors and the first of the large end doors has been trial fitted. The roof is now structurally complete but requires the remain mastic trimmed and a few more coats of paint.

    https://www.flickr.com/photos/extension3363/26094510154/in/album-72157654777610931/

    Elsewhere SECR 3188 is nearing completion, the final coats of varnish have been applied to the east side and brass work fitted.

    https://www.flickr.com/photos/extension3363/26428941450/in/album-72157626960166136/

    Dave Clarke
     
  7. Paul42

    Paul42 Part of the furniture

    Înscris:
    17 Iul 2006
    Mesaje:
    6.094
    Aprecieri primite:
    4.466
    Sex:
    Masculin
    Locație:
    East Grinstead
    Locos in use 73082, 263 and 473 on 3 train service according to loco roster see http://www.bluebell-railway.co.uk/bluebell/loco_roster.html
    with Baxter as station pilot on the Sunday.
     
  8. David R

    David R Well-Known Member

    Înscris:
    30 Iul 2013
    Mesaje:
    1.019
    Aprecieri primite:
    1.390
    Sex:
    Masculin
    Locație:
    Surrey
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Some photos from earlier today of the Elephant Van including a picture of the more difficult to access east side. The van continues to make rapid progress.

    David R
     

    Fișiere atașate:

    Jamessquared și Extension3363 apreciază asta.
  9. andrewshimmin

    andrewshimmin Well-Known Member

    Înscris:
    18 Mar 2011
    Mesaje:
    1.770
    Aprecieri primite:
    2.170
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Looking really good! Where are you going to get an elephant...?
     
    CH 19, Jamessquared și David R apreciază asta.
  10. Hampshire Unit

    Hampshire Unit Well-Known Member Friend

    Înscris:
    16 Ian 2012
    Mesaje:
    1.598
    Aprecieri primite:
    3.417
    Sex:
    Masculin
    Ocupație:
    Carer, Gardener
    Locație:
    Alresford
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Is that our very own JamesSquared on the cover of the 2015 Report and accounts??

    I am visiting on Monday for some Camelot action! (Luckily, it's not "only a model")
     
  11. Jamessquared

    Jamessquared Nat Pres stalwart

    Înscris:
    8 Mar 2008
    Mesaje:
    27.793
    Aprecieri primite:
    64.460
    Locație:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Ah, 'tis indeed - fame at last!

    Tom
     
  12. David R

    David R Well-Known Member

    Înscris:
    30 Iul 2013
    Mesaje:
    1.019
    Aprecieri primite:
    1.390
    Sex:
    Masculin
    Locație:
    Surrey
    Heritage Railway Volunteer:
    Yes I am an active volunteer
  13. David R

    David R Well-Known Member

    Înscris:
    30 Iul 2013
    Mesaje:
    1.019
    Aprecieri primite:
    1.390
    Sex:
    Masculin
    Locație:
    Surrey
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Jamessquared apreciază asta.
  14. CH 19

    CH 19 Well-Known Member Friend

    Înscris:
    30 Dec 2013
    Mesaje:
    1.271
    Aprecieri primite:
    648
    Sex:
    Masculin
    Ocupație:
    Hospital Porter
    Locație:
    W14
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Seconded, well done LDC
     
    David R și Jamessquared apreciază asta.
  15. Jamessquared

    Jamessquared Nat Pres stalwart

    Înscris:
    8 Mar 2008
    Mesaje:
    27.793
    Aprecieri primite:
    64.460
    Locație:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    From the Bluebell e-Newsletter:

    OP4 PROJECT UPDATE

    Phase 1 of Operation Undercover 4 (OP4) has seen steady progress since the beginning of the year, although the extremely wet weather in January and February caused inevitable delays in the foundation construction works.

    Since the improvement in the weather conditions, progress has accelerated, and the frame and roof are in place over the majority of the maintenance road. This has already brought rain protection benefits to the C&W maintenance team. The framework for the carriage storage shed is also well under way, and once completed the contractor's roofing team will be on site to fit the roofing panels.

    The final stage of phase 1 construction will be the framework and roof for the Heritage Skills building that will be situated on the eastern side of the storage shed. Once fully completed, this building will provide much improved facilities for the C&W Department, as well as the Railway as a whole. In addition to providing new office and Trimming Shop facilities, it will also house large meeting and skills training rooms that will provide significant benefits for the training of volunteers and others in heritage skills.

    The benefits of achieving the framework and roof over the carriage storage area can be realised once phase 1 has been completed. Track can be installed in the building, and, with a temporary connection to the running line, carriages for restoration can then be transferred into the shed. The side and end walls/doors of the storage shed can then be completed at a later phase as funds permit.

    The "Cash for Cover"' fundraising campaign raised enough money to provide the framework and roof for the whole building, and this will complete phase 1. The focus of future funding initiatives will concentrate on providing side cladding for the south end of the maintenance road, to provide weather protection for the maintenance staff in the coming winter. In addition, funding priority will be given to the provision of side cladding, windows, etc. for the Heritage Skills building, to make this facility available at the earliest opportunity.

    By Stephen Bigg, OP4 Project Sponsor
     
    David R apreciază asta.
  16. johnofwessex

    johnofwessex Resident of Nat Pres

    Înscris:
    6 Apr 2015
    Mesaje:
    9.748
    Aprecieri primite:
    7.858
    Sex:
    Masculin
    Ocupație:
    Thorn in my managers side
    Locație:
    72
    Heritage Railway Volunteer:
    No I do not currently volunteer
    So who's bringing the elephant?? And has it been risk assessed?
     
    David R și CH 19 apreciază asta.
  17. mikechant

    mikechant Member

    Înscris:
    24 Oct 2012
    Mesaje:
    225
    Aprecieri primite:
    243
    Seriously, I bet there's a local school that would like to make a model elephant for an art project (in sections for easy transport!)
     
    David R apreciază asta.
  18. ady

    ady Well-Known Member

    Înscris:
    4 Iul 2006
    Mesaje:
    2.375
    Aprecieri primite:
    285
    Sex:
    Masculin
    Ocupație:
    Post office
    Locație:
    South
    Heritage Railway Volunteer:
    No I do not currently volunteer
    or you could get two people to turn up in a elephant costume
     
  19. ady

    ady Well-Known Member

    Înscris:
    4 Iul 2006
    Mesaje:
    2.375
    Aprecieri primite:
    285
    Sex:
    Masculin
    Ocupație:
    Post office
    Locație:
    South
    Heritage Railway Volunteer:
    No I do not currently volunteer
    one of them singing this....
     
  20. Jamessquared

    Jamessquared Nat Pres stalwart

    Înscris:
    8 Mar 2008
    Mesaje:
    27.793
    Aprecieri primite:
    64.460
    Locație:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Timetable for Southern at War event this weekend:

    http://www.bluebell-railway.co.uk/bluebell/pic2/wn/2016b/saw_tt16.gif

    Three train service to the slightly modified normal service 2 timings, but an extra service interpolated. AFAIK (subject to usual caveats), loco A is B473; loco B is 73082 and loco C is 263 (yay!), plus a pilot engine (which I suspect might be 592, though it is due its boiler test, so that might change).

    Edit: Loco roster suggests 592 on the C service and 263 as the Pilot.

    Further event details here - http://www.bluebell-railway.com/event/1-southern-at-war-2014/. Sunday there will be a Spitfire display at HK, weather permitting.

    Tom
     
    Last edited: 13 Mai 2016

Distribuie pagina asta