If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Plans for the 225s?

Тема в разделе 'Diesel & Electric Traction', создана пользователем SilentHunter86, 8 май 2016.

  1. Adam-Box

    Adam-Box Member

    Дата регистрации:
    1 ноя 2015
    Сообщения:
    405
    Симпатии:
    84
    Пол:
    Мужской
    Адрес:
    South West
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Could a 225 set be used for charters? They're quick, reversible, comfortable and you could get say 12 mk4's and change the consist as necessary. They also comply with the door regulations so they don't need stewards in every single coach.
     
  2. Phil-d259

    Phil-d259 Member

    Дата регистрации:
    2 апр 2015
    Сообщения:
    703
    Симпатии:
    736
    Пол:
    Мужской
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    While such an approach looks atractive in monetary terms, it rather ignores the role of public opinion and their campaign groups. Just look at the fuss over the D stock conversion, with lots of hostility to them from certain sections of the public even though the end product is quite likely to be a step up from the much hated 'Pacers' ministers are very much awere of such sentiments and reflect that in the current process for letting franchises which encourages applicants to put forward new build stock.

    In the case of the GEML, it has not had 'new' stock since the 1960s - everything else has been cascaded in over the years a factor not lost on the various passenger campaign groups. As such new stock will score highly in future franchise bids compared to yet more cascades, particularly as an EMU frees up space occupied by a loco (and the DVT unless it is rebuilt to creature passenger accommodation) for passengers.
     
  3. 9A.

    9A. New Member

    Дата регистрации:
    21 дек 2014
    Сообщения:
    27
    Симпатии:
    11
    Пол:
    Мужской
    What about some of the coaches and a DVT for the North wales coast instead of full voyagers ? The only downside is a loco change at Crewe unless a 68 can do 110 ? I haven't checked . One of the pluses is power doors on the stock. The arriva DVT set works well but some passengers leaving doors open costs time.
     
  4. Christopher125

    Christopher125 Part of the furniture

    Дата регистрации:
    30 ноя 2005
    Сообщения:
    2.846
    Симпатии:
    581
    Адрес:
    Isle of Wight
    To be strictly accurate the 380s are 23m units using the latest bodyshell design - an intercity variant should be perfectly possible for Norwich services, perhaps based on their new 125mph 'Verve' platform.

    North Wales services to Euston requires 125mph tilting stock, hence the current use of Super Voyagers and previously Pendolino's dragged beyond Crewe.
     
  5. Phil-d259

    Phil-d259 Member

    Дата регистрации:
    2 апр 2015
    Сообщения:
    703
    Симпатии:
    736
    Пол:
    Мужской
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    EU rules on enhanced crash protection for 'high speed trains' kicks in beyond 110mph so unless there are definite plans to go beyond this on the GEML it may be more cost effective to keep below the 110mph celling.
     
  6. D1039

    D1039 Guest

    Changed to 118mph IIRC (190 kph). Hitachi (and others) were talking about seeking a derogation for 125mph but I don't know what happened.

    Other builders were modelling 115mph emus against SETs on the Oxford runs and reckoned they would keep to the timetable

    (All recovered memory from Modern Railways about three years back)

    Patrick
     
  7. 9A.

    9A. New Member

    Дата регистрации:
    21 дек 2014
    Сообщения:
    27
    Симпатии:
    11
    Пол:
    Мужской
    That's a shame as 110,125- with the recovery time there's really not a lot in it and as a passenger is rather be seated than stood.
     
  8. damianrhysmoore

    damianrhysmoore Part of the furniture

    Дата регистрации:
    31 май 2008
    Сообщения:
    2.615
    Симпатии:
    3.002
    Род занятий:
    Osteopath
    Адрес:
    London SW8
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I don't think the issue is, lets keep below the EU speed ceiling so we can buy cheaper and less complex units, there are lots of constraints which would make it very expensive to run at 125. First there are the capacity constraints on the southern section where it would share space with slower stoppers, 4 tracks only make it to Shenfield! Second there are a phenomenal number of level crossings betweeen Ipswich and Norwich, which become more dangerous as linespeeds increase and 3rd I don't think the knitting is up to it. I think that even the new wiring at the southern end was only specced up to 110mph as there was very little chance of going above that for the reasons above.
     
  9. SilentHunter86

    SilentHunter86 Member

    Дата регистрации:
    31 дек 2014
    Сообщения:
    306
    Симпатии:
    25
    Пол:
    Мужской
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Bombardier are also offering intercity versions of the Aventra that can do up to 125mph.
     
  10. D1039

    D1039 Guest

    Slightly O/T but what is the art of the possible on the GE? Pairs of gangwayed 5/6 car 110 mph emus, an hourly 90 minute fast and an hourly semi-fast to Norwich? Are there some 'easy win' route enhancements?

    Patrick
     
  11. Phil-d259

    Phil-d259 Member

    Дата регистрации:
    2 апр 2015
    Сообщения:
    703
    Симпатии:
    736
    Пол:
    Мужской
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I don't think there are any easy wins as such but getting rid of some more level crossings would probably help remove some risk / reliability / pathing issues.

    A couple of dynmic loops south of Ipswich would be handy to allow more overtaking moves, IIRC there was talk of putting in a couple north of Chelmsford (along with a new Parkway station) a few years ago.

    A rebuilding of Trowse swing bridge to provide two tracks again on the Norwich approaches has also been suggested
     
  12. SilentHunter86

    SilentHunter86 Member

    Дата регистрации:
    31 дек 2014
    Сообщения:
    306
    Симпатии:
    25
    Пол:
    Мужской
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I believe these are all still planned for the next few years.
     

Поделиться этой страницей