If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Railway Touring Company 2016

الموضوع في 'What's Going On' بواسطة mike1522, بتاريخ ‏10 سبتمبر 2015.

  1. Dobbs0054

    Dobbs0054 Member

    إنضم إلينا في:
    ‏23 سبتمبر 2014
    المشاركات:
    872
    عدد المعجبين:
    520
    الجنس:
    ذكر
    So you go to order a new car. You order, from the brochure, the 2,5 GT Petrol variant with the associated specification. You pay your money and wait for the car to be delivered. When it turns up and you go to collect, the car is a 2.0 diesel with a different specification. You are not happy but the salesman pulls out the brochure and says "it's here in the T&Cs - we will make every effort to provide the car you have ordered but for operational reasons we may substitute for an inferior model."

    Principle is the same - what is sold is what is described. Any variation, if not CLEARLY displayed will fall foul in the Courts. That is why RTC etc refund when challenged.
     
    أعجب بهذه المشاركة Harry Stanger
  2. Big Al

    Big Al Nat Pres stalwart Staff Member Moderator

    إنضم إلينا في:
    ‏30 ماي 2009
    المشاركات:
    22,738
    عدد المعجبين:
    22,894
    مكان الإقامة:
    1016
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Such a poor example and completely dismantles any sensible argument that your posts have been making up to now.
     
    RalphW و Bifur01 معجبون بهذا.
  3. Dobbs0054

    Dobbs0054 Member

    إنضم إلينا في:
    ‏23 سبتمبر 2014
    المشاركات:
    872
    عدد المعجبين:
    520
    الجنس:
    ذكر
    Was just using the principle in an exaggerated manner. Can use any product. What you order you expect to be provided unless conditions are clearly shown.
     
  4. Bulleid Pacific

    Bulleid Pacific Part of the furniture

    إنضم إلينا في:
    ‏14 إبريل 2007
    المشاركات:
    4,033
    عدد المعجبين:
    1,101
    الوظيفة:
    A Thingy...
    Yes, crude examples aside, at the end of the day, a car can still be ordered in; a particular steam locomotive can't- would have thought that was patently obvious.

    My understanding of the above perspective is that if a trip from X to Y is advertised, runs generally as planned save for different motive power with generally happy patrons, then evidently it should have been cancelled because it wasn't what was originally advertised.

    By following this logic to the nth degree, even if changes were clearly advertised, the tour company could still be challenged for these changes as they still represent a deviation from the original concept. At this rate, nothing will run. The point is they are selling a journey with certain perks, namely steam.
     
    BillyReopening, huochemi, Wilmslow1957 و 1 شخص آخر معجبون بهذا.
  5. BillyReopening

    BillyReopening Member

    إنضم إلينا في:
    ‏17 سبتمبر 2012
    المشاركات:
    830
    عدد المعجبين:
    581
    الجنس:
    ذكر
    الوظيفة:
    Freelance Trumpet Player // IT Engineer
    مكان الإقامة:
    South West
    Heritage Railway Volunteer:
    No I do not currently volunteer
    But they are shown, in the Ts and Cs....
     
  6. MellishR

    MellishR Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏16 إبريل 2009
    المشاركات:
    8,992
    عدد المعجبين:
    5,920
    We do seem to be going round in circles (again), and on a subject that is relevant to more than one tour operator, so might perhaps be better in a separate thread. The essential points are (a) that some tour operators are too good at continuing to advertise what they were originally hoping to provide, even after it is known that what will actually be provided will certainly be significantly different, and (b) that their T&C give them excessive scope for providing something different and offering their customers inadequate compensation, if any. They do need to give themselves some cover for developments that are foreseeable but not expected and entirely outside their control (e.g. loco fails FTR or breaks down on the day), but they do seem to take that too far.
     
    أعجب بهذه المشاركة 26D_M
  7. Bulleid Pacific

    Bulleid Pacific Part of the furniture

    إنضم إلينا في:
    ‏14 إبريل 2007
    المشاركات:
    4,033
    عدد المعجبين:
    1,101
    الوظيفة:
    A Thingy...
    I don't think it is excessive, as I believe there's no other feasible way of doing it. A dedicated team of staff could be employed to produce a bespoke package for each tour advertised, but I doubt any promoter is large enough to do this.

    The scope provided by the T&Cs is designed to allow for the fact that the promoter relies upon Third Parties who also have their own agendas to pursue, namely WCRC or DBC trying to limit delay minutes, locomotive societies trying to scrape together money for their next overhaul and suggesting future availability in good faith, and NR providing timings and route solutions to get the train from Y to Z. There is also the fact that support crews may not be forthcoming for a particular locomotive, or are only able to service the locomotive for a set number of hours. In such an environment, how can the T&Cs be tightened up, and why would the passenger booking it want to read all about this in the tour write-up?

    I agree compensation depends upon whether the customer in question is a) aggrieved and b) actually willing to pursue it, but if the thousands are really unhappy with what they have received, then all tour promoters will have gone under by now. People aren't stupid; if they want to pursue compensation, they will, and the promoter is usually able to accommodate this. The second point is essentially describing the current situation, which leads us back to your first point.
     
    Last edited: ‏25 أوت 2016
  8. 26D_M

    26D_M Part of the furniture

    إنضم إلينا في:
    ‏22 اكتوبر 2009
    المشاركات:
    4,416
    عدد المعجبين:
    1,681
    It is not so simple as believing because there have been insufficient compensation claims to drive a business under all must be well. The sensible thing would be to take a proactive approach to maintain customer satisfaction in the face of changing context ie an increasing incidence of DL usage. That is an inescapable fact as are the latest loading stipulations both of which need to be reflected simply in the information provided to customers. What was once an exception may become more the norm so advertising needs to be updated accordingly.
     
    أعجب بهذه المشاركة Dobbs0054
  9. Dobbs0054

    Dobbs0054 Member

    إنضم إلينا في:
    ‏23 سبتمبر 2014
    المشاركات:
    872
    عدد المعجبين:
    520
    الجنس:
    ذكر
    As 26D_M says, the new loading regulations need to be factored in. Overloading an engine which means a diesel is a must have is disingenuous. A tour should be sold with a loco and appropriate load for that loco and route. It should then be priced accordingly. If the tour fails to sell then a lesson is learned. But is price a big factor seeing that most of the consist is usually Premier or First. And yes, enthusiasts do sit there. Cost is a fact- price is a policy.
     
  10. Bulleid Pacific

    Bulleid Pacific Part of the furniture

    إنضم إلينا في:
    ‏14 إبريل 2007
    المشاركات:
    4,033
    عدد المعجبين:
    1,101
    الوظيفة:
    A Thingy...
    It is not really disingenuous as the loadings of recent trips were a legacy of the pre-ban situation when there was no enforced loadbook. Equally, if the originally advertised motive power had a last-minute glitch and was substituted for an underpowered alternative, then the problem is plain to see. Cancel and take a hit, or run and face the brickbats? We'd also need proof if a train is being overloaded on purpose, but as things generally stand, most arrangements seem to be done in 'good faith' that the right locomotive will be available at the right time.

    Flexibility is what's needed in this game, not lashing to a mast. In this respect, the pool system used to work quite well before the shortage of locomotives took its toll. However, even this must have cost someone money, as it meant keeping a locomotive on standby in one part of the country when it could have been earning in another. I think by retreading this ground ad nauseum, we are repeatedly demonstrating that quality of advertising aside, there are some fairly intractable problems associated with the model- the number of Third Parties being the most obvious.
     
  11. 1020 Shireman

    1020 Shireman Part of the furniture Friend

    إنضم إلينا في:
    ‏31 جويلية 2013
    المشاركات:
    2,858
    عدد المعجبين:
    2,749
    الجنس:
    ذكر
    الوظيفة:
    Relaxingly retired
    مكان الإقامة:
    Deep in the country
    It is what it is and will remain so until the fleet of mainline locomotives increases substantially in number, probably not until 2018. Using the lure of locomotives out of ticket or not even 'complete' is out of order. Subject to FTR or late failures surely the 'code' should be no mention of a specific locomotive until it has been contracted for the train.
     
  12. Enterprise

    Enterprise Part of the furniture

    إنضم إلينا في:
    ‏9 سبتمبر 2005
    المشاركات:
    5,486
    عدد المعجبين:
    3,320
    Their T&C are, as has already been stated, often unenforceable as they are unreasonable. They are designed to put off unhappy travellers. I would not object if tour companies were honest but I believe their advertising is deliberately obfuscating.
     
  13. Dobbs0054

    Dobbs0054 Member

    إنضم إلينا في:
    ‏23 سبتمبر 2014
    المشاركات:
    872
    عدد المعجبين:
    520
    الجنس:
    ذكر
    I wasn't referring to the current situation but looking prospectively as to how RTC and others could start to behave. As 1020 Shireman says, we are here we are at this moment in time. It has been a fairly frustrating year with so few class 7 and 8 locos available. What others are available that could double head are also well spread out.

    I accept totally that nothing can be done in the event of a FTR failure on the day. That can happen to any service, heritage or scheduled. Indeed here in the North with our standard Heritage DMU service pretending to be a 21st Century railway, failures are all too common.

    It is how the future is managed by the tour operators that matters. It is only a matter of time that Trading Standards will be approached by a less than gruntled customer and the wheels will come off.
     
    أعجب بهذه المشاركة Harry Stanger
  14. Bulleid Pacific

    Bulleid Pacific Part of the furniture

    إنضم إلينا في:
    ‏14 إبريل 2007
    المشاركات:
    4,033
    عدد المعجبين:
    1,101
    الوظيفة:
    A Thingy...
    I wish Trading Standards luck picking over the whole thing if they do. They'll probably end up wondering why people bother with the uncertainty, and I'm talking passengers and promoter alike. Anyway, as a new thread should have been started on this a while back, this is the last I'll say on the subject until this little lot has been shuffled over.
     
    أعجب بهذه المشاركة sycamore
  15. JDTTRAINS

    JDTTRAINS Member

    إنضم إلينا في:
    ‏27 اكتوبر 2013
    المشاركات:
    582
    عدد المعجبين:
    545
    الجنس:
    ذكر
    الوظيفة:
    Trainee Driver
    مكان الإقامة:
    Bedfordshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The 10/09 Norwich - Chester 'Cheshireman' has disappeared off the website.
     
  16. Bulleid Pacific

    Bulleid Pacific Part of the furniture

    إنضم إلينا في:
    ‏14 إبريل 2007
    المشاركات:
    4,033
    عدد المعجبين:
    1,101
    الوظيفة:
    A Thingy...
    Presumably no engine available.
     
  17. JDTTRAINS

    JDTTRAINS Member

    إنضم إلينا في:
    ‏27 اكتوبر 2013
    المشاركات:
    582
    عدد المعجبين:
    545
    الجنس:
    ذكر
    الوظيفة:
    Trainee Driver
    مكان الإقامة:
    Bedfordshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It wont be more than a few weeks before 'Cromwell' moves back to Southall. Tender springs were reprofiled I believe last week and was having a boiler washout carried out yesterday while I was cleaning Lamiel.
     
  18. 61994

    61994 Member

    إنضم إلينا في:
    ‏19 فبراير 2014
    المشاركات:
    328
    عدد المعجبين:
    522
    الجنس:
    ذكر
    NWCE on Sunday now showing on the website as 46115 Chester - Holyhead - Chester due to 45699 failing
     
  19. 1020 Shireman

    1020 Shireman Part of the furniture Friend

    إنضم إلينا في:
    ‏31 جويلية 2013
    المشاركات:
    2,858
    عدد المعجبين:
    2,749
    الجنس:
    ذكر
    الوظيفة:
    Relaxingly retired
    مكان الإقامة:
    Deep in the country
    WCRC fleet seem to be setting new standards of failures - in the wrong direction. Poor old 45699 hardly gets to run unassisted either so hasn't been a great year for her.
     
    أعجب بهذه المشاركة Harry Stanger
  20. RalphW

    RalphW Nat Pres stalwart Staff Member Administrator Friend

    إنضم إلينا في:
    ‏11 سبتمبر 2005
    المشاركات:
    36,565
    عدد المعجبين:
    9,984
    الجنس:
    ذكر
    الوظيفة:
    Retired-ish, Part time rail tour steward.
    مكان الإقامة:
    Northwich
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Has Galatea actually got a problem or is it just operationally simpler/cheaper to have one loco in steam to do both runs?
     

مشاركة هذه الصفحة