44871 + 45407 Poole to Bristol. Thurs. 24th Nov, 2016

Discuție în 'What's Going On' creată de free2grice, 17 Noi 2016.

  1. free2grice

    free2grice Part of the furniture Friend

    Înscris:
    19 Sep 2005
    Mesaje:
    5.626
    Aprecieri primite:
    3.618
    Sex:
    Masculin
    Ocupație:
    Retired Rolls-Royce engineer
    Locație:
    Bath Green Park / Mangotsfield
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The electrification from Chippenham to Bristol has been delayed until at least 2024. Sydney Gardens is now safe for a while. <BJ>
     
  2. gwr4090

    gwr4090 Part of the furniture

    Înscris:
    8 Aug 2005
    Mesaje:
    2.847
    Aprecieri primite:
    222
    Sex:
    Masculin
    Ocupație:
    Scientist (Rtd)
    Locație:
    Dorset
    According to Network Rail, electrification of this section is now expected to be completed in control period 6 which starts in 2019 (not 2024 !). The completion date will be agreed in early 2018.
     
    John Stewart apreciază asta.
  3. free2grice

    free2grice Part of the furniture Friend

    Înscris:
    19 Sep 2005
    Mesaje:
    5.626
    Aprecieri primite:
    3.618
    Sex:
    Masculin
    Ocupație:
    Retired Rolls-Royce engineer
    Locație:
    Bath Green Park / Mangotsfield
    Heritage Railway Volunteer:
    No I do not currently volunteer
    RYTC appear confident enough to leave the 33 behind tomorrow. Soon after the train departs from Bristol Temple Meads the locos are straight into the arduous climb of Horfield bank. Then later after a stop at Abergavenny the locos are straight into the difficult climb to Llanvihangel. I'm sure that RYTC have weighed up the risks involved and are confident that the Riley '5's will perform well. <BJ>
     
  4. free2grice

    free2grice Part of the furniture Friend

    Înscris:
    19 Sep 2005
    Mesaje:
    5.626
    Aprecieri primite:
    3.618
    Sex:
    Masculin
    Ocupație:
    Retired Rolls-Royce engineer
    Locație:
    Bath Green Park / Mangotsfield
    Heritage Railway Volunteer:
    No I do not currently volunteer
    We've heard promises from Network Rail regarding the completion date and the cost of electrification for many years.

    From the Telegraph on 8th November, 2016 :
    ''Rail minister Paul Maynard said he had deferred electrification because newer trains with more capacity can bring in the benefits expected by passengers without requiring costly and disruptive electrification works".

    <BJ>
     
  5. free2grice

    free2grice Part of the furniture Friend

    Înscris:
    19 Sep 2005
    Mesaje:
    5.626
    Aprecieri primite:
    3.618
    Sex:
    Masculin
    Ocupație:
    Retired Rolls-Royce engineer
    Locație:
    Bath Green Park / Mangotsfield
    Heritage Railway Volunteer:
    No I do not currently volunteer
    44871 + 45407. Romsey RT at 08:46. Diesel at rear? <BJ>
     
  6. steamvideosnet

    steamvideosnet Well-Known Member

    Înscris:
    12 Apr 2011
    Mesaje:
    1.968
    Aprecieri primite:
    2.476
    Sex:
    Masculin
    Locație:
    Southampton, UK
    Yes, 47802 on the rear.

    James
     
    free2grice apreciază asta.
  7. Dobbs0054

    Dobbs0054 Member

    Înscris:
    23 Sep 2014
    Mesaje:
    872
    Aprecieri primite:
    520
    Sex:
    Masculin
    Real reason is new EU regulation on height of cables. They have gone up a few inches which means tunnels would need to be re-bored in places. That adds to the cost. Is the delay waiting for Brexit?
     
  8. HerstonHalt

    HerstonHalt Member

    Înscris:
    27 Apr 2009
    Mesaje:
    255
    Aprecieri primite:
    169
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Black 5s sounded great on the ECS climb out of Swanage this morning. Heard them for quite a distance. 47 sounded to be just idling.
     
  9. Bean-counter

    Bean-counter Part of the furniture

    Înscris:
    21 Iul 2007
    Mesaje:
    5.844
    Aprecieri primite:
    7.688
    Sex:
    Masculin
    Locație:
    Former NP Member
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The real reason is because costs are out of control and a very expensive factory train for installing the overhead wire masts isn't installing them at anything like the number per shift required, probably because ground conditions rather than the 'tools' being used for the installation are likely to have more say on speed of work!

    Steven
     
  10. Dobbs0054

    Dobbs0054 Member

    Înscris:
    23 Sep 2014
    Mesaje:
    872
    Aprecieri primite:
    520
    Sex:
    Masculin
    does not detract from change in EU regulations that mean tunnel floors cannot be dropped enough to accommodate clearances. Tunnels will be re-bored. Some bridges raised. Rather a costly and time consuming exercise.
     
  11. Bean-counter

    Bean-counter Part of the furniture

    Înscris:
    21 Iul 2007
    Mesaje:
    5.844
    Aprecieri primite:
    7.688
    Sex:
    Masculin
    Locație:
    Former NP Member
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Can you post a link to the regulation in question - I am amazed that Network Rail aren't shouting this from the roof tops as being their perfect 'get out of jail' card on this, which the are currently receiving all the blame for.

    Thanks

    Steven
     
  12. Steven

    Steven New Member

    Înscris:
    31 Dec 2013
    Mesaje:
    16
    Aprecieri primite:
    38
    Sex:
    Masculin
    Taken earlier as they stormed through Oldfield Park running 6 minutes early
     

    Fișiere atașate:

  13. GWR4707

    GWR4707 Nat Pres stalwart

    Înscris:
    12 Mai 2006
    Mesaje:
    19.235
    Aprecieri primite:
    17.567
    Sex:
    Masculin
    Locație:
    Cumbria
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Unless NR overlooked that it was coming in when planning and designing the scheme and thus would end up with eggy faces if they raised the issue publicly, EU regulations do not just appear overnight and there has been no mention of these problems on the schemes being completed (painfully slowly) in the NW?
     
  14. gricerdon

    gricerdon Guest

    Getting back to the subject, 44871+45407 were 14 late Poole but right time storming past us on Horseshoe Bridge, St Denys in beautiful light with the 47 just idling on the back. The Riley 5s never fail to impress.
     
  15. Big Al

    Big Al Nat Pres stalwart Staff Member Moderator

    Înscris:
    30 Mai 2009
    Mesaje:
    22.595
    Aprecieri primite:
    22.730
    Locație:
    1016
    Heritage Railway Volunteer:
    No I do not currently volunteer
    So 11 plus a diesel was within the scope of the 5s today. Let's hope the same applies on Sunday.
     
    Springs Branch apreciază asta.
  16. pwsw5054

    pwsw5054 Member

    Înscris:
    5 Ian 2016
    Mesaje:
    411
    Aprecieri primite:
    1.284
    Sex:
    Masculin
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Sounded good up Upton Scudamore although only one loco seemed to be working hard and the diesel was shoving, still sounded nice though. Video to come.
     
  17. pwsw5054

    pwsw5054 Member

    Înscris:
    5 Ian 2016
    Mesaje:
    411
    Aprecieri primite:
    1.284
    Sex:
    Masculin
    Heritage Railway Volunteer:
    Yes I am an active volunteer


    At the summit of Upton Scudamore
     
  18. free2grice

    free2grice Part of the furniture Friend

    Înscris:
    19 Sep 2005
    Mesaje:
    5.626
    Aprecieri primite:
    3.618
    Sex:
    Masculin
    Ocupație:
    Retired Rolls-Royce engineer
    Locație:
    Bath Green Park / Mangotsfield
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It was good to see the Black 5s powering through Oldfield Park this morning en route to Bristol. I took it for granted that the diesel on the back was giving an almighty shove considering the speed that the train was accelerating but I'm pleased to report that the diesel was just idling. Well done to the West Coast crews. <BJ>
     
  19. steamvideosnet

    steamvideosnet Well-Known Member

    Înscris:
    12 Apr 2011
    Mesaje:
    1.968
    Aprecieri primite:
    2.476
    Sex:
    Masculin
    Locație:
    Southampton, UK
    44871 and 45407 approaching Eastleigh this morning, just as 444030 rolled in on a delayed Portsmouth-London service.

    44871 45407 Eastleigh.001.jpg

    James
     
    lord stamp apreciază asta.
  20. dublo6231

    dublo6231 Member

    Înscris:
    22 Aug 2011
    Mesaje:
    577
    Aprecieri primite:
    474
    Sex:
    Masculin
    Ocupație:
    IT
    Locație:
    Sat at home
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I bet you said a few choice words!
     