Moorlands and City Railway

本贴由 Guest2009-10-14 发布. 版块名称: Heritage Railways & Centres in the UK

  1. p/wayman

    p/wayman Member

    注册日期:
    2005-11-29
    帖子:
    573
    支持:
    168
    性别:
    职业:
    voulunteer on pway
    所在地:
    newcastle-u-lyme
     
  2. p/wayman

    p/wayman Member

    注册日期:
    2005-11-29
    帖子:
    573
    支持:
    168
    性别:
    职业:
    voulunteer on pway
    所在地:
    newcastle-u-lyme
    Shambolic, There was a shareholders meeting in November where things were explained. If you think about it 90+ year lease with track seems good value to me. Of course we had already purchase the track, still good value.




     
  3. p/wayman

    p/wayman Member

    注册日期:
    2005-11-29
    帖子:
    573
    支持:
    168
    性别:
    职业:
    voulunteer on pway
    所在地:
    newcastle-u-lyme
    Reread your post of Dec.10th. I'm looking at the benefits that MCR bought to the railway. The clearing of the track after years of neglect on the Cauldon branch, I know what is was like could not get further than the railway cottages at Leek Brook. Loads of sleepers, chairs keys etc. that required replacement by at least 2 people full time. Roadrailers bought in to clear trees and drains. Then after all was ready came the grand re opening on the coldest weekend for years, those that went will remember the frozen engines at Cheddleton, fires lit under the engines, the frozen coaches and frozen volunteers. MCR has let the CVR run trains up the Cauldon line at least once a month and the volunteers work on the line keeping it in good order After the track buckled in the heat it was decided to abandon the line nortth of Ipstones. Its a wonder they carried on, but they did we started changing sleepers on the Endon line also cutting trees and track repairs thinking that we would be going there soon but now 7 years after, Network Rail are still dragging their feet. The local council will not lease the trackbed to Leek. The track to Oakamoor was in poor condition and we were limited as to how many trains we could run a year so the CVR lifted the track to buy the rails from MCR on the Cauldon line and has since bought the lease from MCR. The MCR is still trying to get the line from Stoke to Leek but everything they try seems to hit the buffers. I am not connected in any way with MCR but would like you to realise the problems they are up against.
     
    Last edited: 2017-01-30
    已获得lil Bear, jnc, 49010另外3人的支持.
  4. NeilL

    NeilL Well-Known Member

    注册日期:
    2012-03-30
    帖子:
    2,030
    支持:
    1,522
    职业:
    Retired & OAPWay & tree feller
    所在地:
    Staffordshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Yes. The CVR line up the Churnet Valley to Leekbrook is a pleasant river and canal-side line but combined with the section from Leekbrook to Ipstones it changes from just another section of heritage railway into something really interesting where the echoing blasts from an engine working hard up the bank can be ringing in the ears.
     
    已获得37026lil Bear49010的支持.
  5. 37026

    37026 New Member

    注册日期:
    2011-05-12
    帖子:
    14
    支持:
    2
    Gone very quiet on here has nothing happened in the last year?
     
    已获得jnc的支持.
  6. NeilL

    NeilL Well-Known Member

    注册日期:
    2012-03-30
    帖子:
    2,030
    支持:
    1,522
    职业:
    Retired & OAPWay & tree feller
    所在地:
    Staffordshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Focus now is on 'Reconnecting Leek'. The planning application for the reinstatement of track is with the council and we should hear the outcome before mid summer.
     
    已获得3702649010的支持.
  7. 49010

    49010 Well-Known Member

    注册日期:
    2012-04-23
    帖子:
    1,237
    支持:
    1,032
    性别:
    职业:
    Gentleman of Leisure
    所在地:
    Stockport
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I'd add to that that the council seem very supportive, the Tree, Bat and Reptile studies (yes, on one level they seem rather silly but those are the requirements) all came back pretty clean. One step at a time as they say.
     
    已获得37026Duty Druid的支持.
  8. oldmrheath

    oldmrheath Well-Known Member

    注册日期:
    2006-06-18
    帖子:
    2,334
    支持:
    2,563
    Is 'Reconnecting Leek' being driven as an MCR or CVR project?

    Thanks
    Jon
     
  9. 49010

    49010 Well-Known Member

    注册日期:
    2012-04-23
    帖子:
    1,237
    支持:
    1,032
    性别:
    职业:
    Gentleman of Leisure
    所在地:
    Stockport
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I must admit I've lost the thread a bit on this but I'm pretty sure that it is a CVR thing, because (if I remember right), the CVR has been granted a lease from the council (who own the trackbed). MCR would be either - Leekbrook Junction to Stoke, or Leekbrook through to Cauldon if/when freight from the quarry is to run by rail.
     
    已获得oldmrheath的支持.
  10. 37026

    37026 New Member

    注册日期:
    2011-05-12
    帖子:
    14
    支持:
    2
    That’s what’s I was thinking seems very quiet from MCR side was hopefull of some good news.
     
  11. lil Bear

    lil Bear Part of the furniture

    注册日期:
    2006-12-11
    帖子:
    6,136
    支持:
    1,700
    性别:
    职业:
    Railway Technician
    所在地:
    8C / 5D / 27C / 71B
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Reconnecting Leek is now solely CVR and the Council.

    MCR are leading the discussions for the Stoke line, which are as long winded as they always have been. When there's news to be told it will be online.
     
    已获得37026, 49010, oldmrheath另外3人的支持.