If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

6201, her new lease of life.

Dieses Thema im Forum 'Steam Traction' wurde von Sidmouth gestartet, 7 Februar 2017.

  1. Johnb

    Johnb Nat Pres stalwart

    Registriert seit:
    3 Dezember 2014
    Beiträge:
    15.544
    Zustimmungen:
    18.419
    Geschlecht:
    männlich
    Beruf:
    Retired, best job I've ever had
    Ort:
    Buckinghamshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Not if it hadn't been steamed
     
    60017 gefällt dies.
  2. GWR4707

    GWR4707 Nat Pres stalwart

    Registriert seit:
    12 Mai 2006
    Beiträge:
    19.235
    Zustimmungen:
    17.567
    Geschlecht:
    männlich
    Ort:
    Cumbria
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Could the limited information in the public domain at this stage be down to discussions going on in the background regarding why this has occurred, for instance if contractors were involved in the boiler works these could be owner - contractor discussions regarding advice and warranty? or likewise with suppliers of the tubes if they were replaced and have failed this soon - ultimately it needs doing so they need the money but were they to wait with the appeal until all the i's we dotted and the t's crossed on causation she could be months of not years further into her ticket before the appeal even started?
     
  3. david1984

    david1984 Resident of Nat Pres

    Registriert seit:
    13 September 2005
    Beiträge:
    12.910
    Zustimmungen:
    1.387
    Geschlecht:
    männlich
    Ort:
    Birmingham
    That assumes normal use though, in the first 18 months or so it barely moved or even steamed being confined to Tyseley, No way would that inflict anything like 4 years of wear you'd expect from from a mainline loco racking up mileage and steaming cycles.

    I don't think it's unfair to suggest 6023 probably has more mileage and boiler cycles on it in this ticket than 6201 currently.
     
  4. 26D_M

    26D_M Part of the furniture

    Registriert seit:
    22 Oktober 2009
    Beiträge:
    4.416
    Zustimmungen:
    1.681
    In formal terms isn't the first witnessed hydraulic test when the clock starts ticking from or even the point of last full internal exam? You would expect an examiner to account for lack of use when setting the schedule though, I quite agree. Just observing that simply because it was recertified last year does not mean it has used less than12 months of boiler life.
     
  5. Spamcan81

    Spamcan81 Nat Pres stalwart

    Registriert seit:
    25 August 2007
    Beiträge:
    35.841
    Zustimmungen:
    22.291
    Beruf:
    Training moles
    Ort:
    The back of beyond
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    No.
     
  6. 26D_M

    26D_M Part of the furniture

    Registriert seit:
    22 Oktober 2009
    Beiträge:
    4.416
    Zustimmungen:
    1.681
    Fullsome reply much appreciated. Most informative and I stand utterly corrected.
     
    Spinner gefällt dies.
  7. Sidmouth

    Sidmouth Resident of Nat Pres Staff Member Moderator

    Registriert seit:
    12 September 2005
    Beiträge:
    10.148
    Zustimmungen:
    9.777
    Geschlecht:
    männlich
    Ort:
    Alderan !
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I think 6201 had a partial retube last ticket which ran to 10 years . It may have been deemed from examination those tubes were still satisfactory and did not need replacing

    I think we all have the idea that an overhaul is a last nut and bolt strip down , which is fine if you have abundant funds and labour . The reality is probably rather different with work done based on funds available to get the loco back in traffic , earning and then attend to the next work as and when it is needed

    all the above and thread is idle speculation and the harsh reality is that6201 now needs additional work to return to Main Line again . Without funds the risk is she sits in west shed alongside her sister (good company at least) . I also suspect this reality is also going to affect other main line locomotives in the care of small groups as we go forward

    I've put my hand in my pocket ... Will you
     
    Last edited: 9 Februar 2017
    mike1522 gefällt dies.
  8. Jamessquared

    Jamessquared Nat Pres stalwart

    Registriert seit:
    8 März 2008
    Beiträge:
    27.804
    Zustimmungen:
    64.507
    Ort:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    As I understand, there is no absolute prescription, but there is best practice guidance. The "Competent Person" (typically reporting on behalf of the insurance company) has to conduct a thorough examination of the boiler while cold, and then in steam. Once they have seen the boiler in steam to their satisfaction, they sign off operation until some date in the future - but there is no clock per se, just the date that they write on the inspection report beyond which operation of the boiler is prohibited. The "in steam" examination has to happen as soon as is reasonably practical after the cold examination, but again there is no explicit time scale. Those examinations would occur according to a written scheme of examination, typically annually.

    The "ten yearly" is also best practice, not statute. The precise wording is that "no part of the boiler should remain completely unexamined for longer than the time determined by the competent person" and goes on to clarify that best practice indicates that that would be ten years. But ultimately it is down to the judgement of the competent person; they may recommend less or, in some cases, allow a modest extension. Normally the Competent Person will have been consulted during any overhaul or repairs of the boiler, (and those repairs have to be documented) so they will form their judgement based both on what they see on the day and what they know about the previous history and operation of the boiler.

    Operation on the mainline may have additional regulations which I don't know about in any detail.

    Tom
     
  9. The Green Howards

    The Green Howards Nat Pres stalwart

    Registriert seit:
    20 Februar 2016
    Beiträge:
    15.110
    Zustimmungen:
    8.635
    Beruf:
    Layabout
    Ort:
    My settee, mostly.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Done :)
     
  10. Spamcan81

    Spamcan81 Nat Pres stalwart

    Registriert seit:
    25 August 2007
    Beiträge:
    35.841
    Zustimmungen:
    22.291
    Beruf:
    Training moles
    Ort:
    The back of beyond
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Sorry I wasn't more specific. There's an awful lot of misconception about boiler tickets and I know I don't understand all of the nuances involved.
     
  11. 46236

    46236 Well-Known Member

    Registriert seit:
    19 September 2005
    Beiträge:
    1.408
    Zustimmungen:
    250
    Geschlecht:
    männlich
    Beruf:
    lord of the manor
    Ort:
    city of gold
    Heritage Railway Volunteer:
    No I do not currently volunteer
    6201 could be placed alongside 46235 at Think Tank in Brum as an example of development, then the hordes would be clamouring for her release......battens down the hatches
     
  12. Steve

    Steve Resident of Nat Pres Friend

    Registriert seit:
    7 Oktober 2006
    Beiträge:
    12.734
    Zustimmungen:
    11.852
    Beruf:
    Gentleman of leisure, nowadays
    Ort:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    In my experience it comes down to a sensible discussion between the Owner and the Competent Person. For main line registered locos, I've quoted MT276 and the seven year requirement but this document is a BR one and dates from 1984 and precedes both the Pressure Systems Regulations 2000 and its 1988 predecessor. I think that it is really down to the VAB, who may use MT276 as a basis for assessment in the absence of anything else.
     
    26D_M gefällt dies.
  13. NSWGR 3827

    NSWGR 3827 New Member

    Registriert seit:
    18 Januar 2009
    Beiträge:
    93
    Zustimmungen:
    40
    Geschlecht:
    männlich
    Beruf:
    Fitter & Machineist
    Ort:
    Down Under
    After reading many comments with regard to inspections and tube life, I am posting this link which I have posted before and if you haven't already seen it, it is well worth watching and gives examples of just how long tubes can last.

     
    242A1 gefällt dies.
  14. 242A1

    242A1 Well-Known Member

    Registriert seit:
    3 Dezember 2006
    Beiträge:
    1.561
    Zustimmungen:
    1.304
    I must have missed this the first time around. Have you trialed Tross stays as yet? Martyn Bane, who used to post on this forum, tried to interest people in water treatment based on TIA/Porta type thinking but with negligible result. In the U.K. people generally adhere to the view that nothing is an advance on what was done in the past, particularly when it comes to steam. But they sure bleat about the cost of running the machines. But, hey ho, nothing new will ever work.
     
  15. Steve

    Steve Resident of Nat Pres Friend

    Registriert seit:
    7 Oktober 2006
    Beiträge:
    12.734
    Zustimmungen:
    11.852
    Beruf:
    Gentleman of leisure, nowadays
    Ort:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I've watched it twice now and don't think there is too much to learn
    The big thing about the Porta treatment regime is the length of operation without draining the water. In the UK, any suggestion of running more than 30 days without an internal examination is really a non-starter. This is easily achieved with present water treatment regimes, so why change?
     
  16. 242A1

    242A1 Well-Known Member

    Registriert seit:
    3 Dezember 2006
    Beiträge:
    1.561
    Zustimmungen:
    1.304
    So our boilers have stays that don't suffer from corrosion etc. etc. Face it people would rather spend money, frequently not their own, rather than change from what they know.
     
    NSWGR 3827 gefällt dies.
  17. Steve

    Steve Resident of Nat Pres Friend

    Registriert seit:
    7 Oktober 2006
    Beiträge:
    12.734
    Zustimmungen:
    11.852
    Beruf:
    Gentleman of leisure, nowadays
    Ort:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Did I say anything about not using water treatment? Read what I said before jumping in. Porta treatment is just one method of treating boilers. There are plenty of others.
     
    S.A.C. Martin und LMS2968 gefällt dies.
  18. Argus

    Argus New Member

    Registriert seit:
    14 Juli 2010
    Beiträge:
    75
    Zustimmungen:
    30
    Geschlecht:
    männlich
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    From what ive heard from people close to the engine, the first statement in this post seems to pretty much summarise the situation.....
     
  19. Argus

    Argus New Member

    Registriert seit:
    14 Juli 2010
    Beiträge:
    75
    Zustimmungen:
    30
    Geschlecht:
    männlich
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Apparently as part of an agreed ongoing plan with the boiler competent person / insurance company, the small tubes were always going to be changed at this point in time as they are just severn years old now! Having first been used in the loco in 2010....
    At the overhaul all the flues were removed along with sufficient small tubes to enable the boiler inspector to gain access through the dome to undertake a thorough internal exam of the boiler, the rest of the small tubes were still in place and had only had three years service at that point in time......
    The hydraulic test was undertaken in 2014.
    Unfortunately it took rather longer than hoped to raise the funds required to complete the overhaul and the loco basically stood for the next two years other than the odd Tys open day.
    Sadly it seems now that the loco didnt manage to raise enough money through its operations to fund its upkeep, and is now stood again awaiting funding.....
     
  20. NSWGR 3827

    NSWGR 3827 New Member

    Registriert seit:
    18 Januar 2009
    Beiträge:
    93
    Zustimmungen:
    40
    Geschlecht:
    männlich
    Beruf:
    Fitter & Machineist
    Ort:
    Down Under
    I would suggest if Tubes are having to be replaced so frequently there is a substantial amount to learn.
     

Die Seite empfehlen