Diesel Brake Tender

الموضوع في 'Heritage Rolling Stock' بواسطة bhallett, بتاريخ ‏1 إبريل 2012.

  1. Wenlock

    Wenlock Well-Known Member Friend

    إنضم إلينا في:
    ‏26 اكتوبر 2008
    المشاركات:
    2,115
    عدد المعجبين:
    1,373
    الجنس:
    ذكر
    الوظيفة:
    Bus Driver
    مكان الإقامة:
    Loughton Essex
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    That sounds right. Was that 27 tonnes or tons? I seem to recall 25 tons old money?
     
  2. pmh_74

    pmh_74 Part of the furniture

    إنضم إلينا في:
    ‏28 يناير 2009
    المشاركات:
    2,426
    عدد المعجبين:
    1,712
    That I am not sure of, my wagon books are still in storage from our house move nearly 2 years ago...!
     
  3. johnofwessex

    johnofwessex Resident of Nat Pres

    إنضم إلينا في:
    ‏6 إبريل 2015
    المشاركات:
    9,748
    عدد المعجبين:
    7,861
    الجنس:
    ذكر
    الوظيفة:
    Thorn in my managers side
    مكان الإقامة:
    72
    Heritage Railway Volunteer:
    No I do not currently volunteer
    How did they manage abroad? It has been said on NP that even if wagons were fitted the hoses were often not connected due to the time it took - hence the UK tendency to run unfitted but it seems that Europeans & the US ran fully fitted freights from the adoption of the continuous brake
     
  4. Railboy

    Railboy New Member

    إنضم إلينا في:
    ‏10 ديسمبر 2016
    المشاركات:
    166
    عدد المعجبين:
    238
    الجنس:
    ذكر
    مكان الإقامة:
    Hamburg
    Heritage Railway Volunteer:
    No I do not currently volunteer
    paullad1984 و Kinghambranch معجبون بهذا.
  5. M59137

    M59137 Well-Known Member

    إنضم إلينا في:
    ‏23 سبتمبر 2009
    المشاركات:
    1,389
    عدد المعجبين:
    2,358
    الجنس:
    ذكر
    الوظيفة:
    Carriage & Wagon
    مكان الإقامة:
    Sheringham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I'm very pleased to see this project succeed, and those responsible should take a bow.

    It was always one of those projects that when hypothetically suggested in the past, some amongst us sniffed at it as being "pointless", a siding space stealer, waste of money/parts and a commercial non starter.

    Whilst I accept that some of these opinions can still be aired now that it is built, the enthusiast in me celebrates the fact it made it from sketch to reality, after a super injection of hard graft! Well done guys!

    Sent from my HTC Desire 620 using Tapatalk
     
    Bluenosejohn, 35B و Jamessquared معجبون بهذا.
  6. 35B

    35B Nat Pres stalwart

    إنضم إلينا في:
    ‏18 جوان 2011
    المشاركات:
    28,751
    عدد المعجبين:
    28,699
    الجنس:
    ذكر
    مكان الإقامة:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I agree; truly a case of WIBN combining with vision and resources to produce a fuller recreation of an era.


    Sent from my iPad using Tapatalk
     
    أعجب بهذه المشاركة M59137
  7. Spinner

    Spinner Member

    إنضم إلينا في:
    ‏29 جويلية 2006
    المشاركات:
    222
    عدد المعجبين:
    238
    الوظيفة:
    Public Servant
    مكان الإقامة:
    Australia
    If NSW practice is anything to go by, the train simply will not depart until it is all connected and working throughout the train. That is, of course, on continuous brake fitted trains. The last non-air trains ran circa 1978, from about 1920 they were geographically limited to the Newcastle area coal lines. The few vehicles that were not air-braked after 1920 had a through pipe which had to be connected.
     