    Yes is must pose quite a dilemma if capacity is finite. The operational business needs a healthy fleet so if workshop capacity is the rate determining aspect there must be a good case for contracting out one or two of the overhauls.
     
  2. martin1656

    martin1656 Nat Pres stalwart Friend

    إنضم إلينا في:
    ‏8 ديسمبر 2014
    المشاركات:
    19,265
    عدد المعجبين:
    12,517
    الجنس:
    ذكر
    مكان الإقامة:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Assuming that there is someone with the spare capacity to overhaul an engine, plus the cost to West Coast to hire in an engine for a railtour if they can't use an home based loco plus it depends on how much revenue they stand to make, for instance, lets say the next engine out is 35018, which is a reasonable assumption to make, the first tours with that engine, are likily to sell out more than if a black 5 takes it, plus an 8P can haul more coaches, so more operating profit, then, if thats followed by Bodmin, again, a rebuilt WC over the northern fells, would have rarity value, prior to a move down south, if West Coast still want to operate down in the south.
     
  3. Dan Hill

    Dan Hill Part of the furniture

    إنضم إلينا في:
    ‏1 أوت 2008
    المشاركات:
    2,752
    عدد المعجبين:
    837
    الجنس:
    ذكر
    الوظيفة:
    Brick Machine Operator
    مكان الإقامة:
    Haywards Heath
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Didn't WCRC say in Steam Railway that a possible date for a test run for 35018 was April 1st? Take what you want about the date but given how close she looks in the Heritage Railway pictures it could have been 35018.
     
    Last edited: ‏28 مارس 2017
  4. 26D_M

    26D_M Part of the furniture

    إنضم إلينا في:
    ‏22 اكتوبر 2009
    المشاركات:
    4,416
    عدد المعجبين:
    1,681
    WC needs to have a reliable fleet of suitable locos available to meet its needs and those of its customers or be at the mercy of other loco providers. Assuming a high degree of self-sufficiency is an aspiration, a strategy for achieving this would reasonably have to consider contracting out to third parties. This would also have sustaining effect for the ancillary suppliers which WC and others rely on.
     
  5. sgthompson

    sgthompson Part of the furniture Friend

    إنضم إلينا في:
    ‏12 جوان 2008
    المشاركات:
    4,010
    عدد المعجبين:
    9,837
    الجنس:
    ذكر
    الوظيفة:
    Tobacco manufacturing
    مكان الإقامة:
    Kendal
    April the 1st might not be a classic fools day after all !
     
  6. Steamage

    Steamage Part of the furniture

    إنضم إلينا في:
    ‏14 سبتمبر 2005
    المشاركات:
    4,748
    عدد المعجبين:
    1,121
    مكان الإقامة:
    Oxford
    Test runs seldom, if ever, happen on a Saturday. How many inspectors work weekends? As usual, though, the first we're likely to hear about a possible test run is when the Q-path to Hellifield is activated in RTT and our Carnforth regulars hear a low "E-flat" whistle
     
  7. 30567

    30567 Part of the furniture Friend

    إنضم إلينا في:
    ‏7 أوت 2012
    المشاركات:
    6,125
    عدد المعجبين:
    4,088
    Sorry, way behind the curve, but I think 34043 (along with 34055) was the subject of various experiments and never quite the same again. Certainly those two were among the first withdrawals. Did Bournemouth assign their weakest WCs to the S and D diagrams? I've never read that.
     
  8. 26D_M

    26D_M Part of the furniture

    إنضم إلينا في:
    ‏22 اكتوبر 2009
    المشاركات:
    4,416
    عدد المعجبين:
    1,681
    If it follows the pattern of previous launches there will be a number of runs to Hellifield and back over the course of many days followed by a loaded run or two around the full circuit. My understanding is that a certificate to carry out main line testing has to be gained prior to venturing onto the network but I do not know whether an inspector has to be on board each time a test run is undertaken. The fully loaded test is usually the sign off turn which gives full VAB acceptance and a final certificate of conformity. This is then provided to NR for entry onto its database. That is the gist of what has previously been explained to me by learned colleagues, if my interpretation is correct.
     
  9. Reading General

    Reading General Part of the furniture

    إنضم إلينا في:
    ‏18 ماي 2011
    المشاركات:
    6,081
    عدد المعجبين:
    2,217
    I've certainly read that Bournemouth used to send it's lame ducks to the S&D...probably Pete Smith
     
  10. wcmlbls1846

    wcmlbls1846 Well-Known Member

    إنضم إلينا في:
    ‏24 إبريل 2009
    المشاركات:
    1,035
    عدد المعجبين:
    545
  11. wcmlbls1846

    wcmlbls1846 Well-Known Member

    إنضم إلينا في:
    ‏24 إبريل 2009
    المشاركات:
    1,035
    عدد المعجبين:
    545
    Still outside in steam tonight. AN
     
  12. RalphW

    RalphW Nat Pres stalwart Staff Member Administrator Friend

    إنضم إلينا في:
    ‏11 سبتمبر 2005
    المشاركات:
    36,449
    عدد المعجبين:
    9,909
    الجنس:
    ذكر
    الوظيفة:
    Retired-ish, Part time rail tour steward.
    مكان الإقامة:
    Northwich
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Say no more......
     
  13. Gav106

    Gav106 Well-Known Member

    إنضم إلينا في:
    ‏29 مارس 2010
    المشاركات:
    1,772
    عدد المعجبين:
    2,170
    مكان الإقامة:
    Nantwich, Cheshire
  14. Chris86

    Chris86 Well-Known Member

    إنضم إلينا في:
    ‏31 اكتوبر 2011
    المشاركات:
    1,577
    عدد المعجبين:
    1,786
    الوظيفة:
    Safety, technical and vehicle trainer
    مكان الإقامة:
    South Yorkshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Is that (4)5231 and (4)5690 in the foreground?

    Chris
     
  15. sgthompson

    sgthompson Part of the furniture Friend

    إنضم إلينا في:
    ‏12 جوان 2008
    المشاركات:
    4,010
    عدد المعجبين:
    9,837
    الجنس:
    ذكر
    الوظيفة:
    Tobacco manufacturing
    مكان الإقامة:
    Kendal
    48151 & 45231 in steam on Tuesday so perhaps them .
     
  16. Chris86

    Chris86 Well-Known Member

    إنضم إلينا في:
    ‏31 اكتوبر 2011
    المشاركات:
    1,577
    عدد المعجبين:
    1,786
    الوظيفة:
    Safety, technical and vehicle trainer
    مكان الإقامة:
    South Yorkshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thanks
    I thought (4)8151 was due its 7 yearly- must have been a quick turn around?!

    Chris
     
  17. MarkinDurham

    MarkinDurham Well-Known Member

    إنضم إلينا في:
    ‏4 ماي 2007
    المشاركات:
    2,229
    عدد المعجبين:
    999
    مكان الإقامة:
    Durham
    So there we go - thanks for the reports. "BI-Day" is getting closer, it would seem. Another Class 8 loco being available will be very welcome news to many.
     
  18. Matt37401

    Matt37401 Nat Pres stalwart

    إنضم إلينا في:
    ‏8 جوان 2014
    المشاركات:
    15,551
    عدد المعجبين:
    11,955
    مكان الإقامة:
    Wnxx
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Shush! Your on to them! I'd be wary of anyone carrying an umbrella approaching you tomorrow! ;);)
     
    أعجب بهذه المشاركة Gav106
  19. 26D_M

    26D_M Part of the furniture

    إنضم إلينا في:
    ‏22 اكتوبر 2009
    المشاركات:
    4,416
    عدد المعجبين:
    1,681
    It was reportedly inside the shed in bits only last week according to @RalphW. Rapid turnaround indeed!
     
  20. mike1522

    mike1522 Long Time Member Friend

    إنضم إلينا في:
    ‏9 اكتوبر 2010
    المشاركات:
    2,001
    عدد المعجبين:
    237
    مكان الإقامة:
    Fort Worth, Texas
    Going into overhaul 48151 was in pretty good condition in my opinion after the 14 Scarborough Spa Expresses last summer. Would a 6 month overhaul be too far fetched for a loco in good condition with not many issues to be sorted out?
     