If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

West Somerset Railway General Discussion

本贴由 gwr40902007-11-15 发布. 版块名称: Heritage Railways & Centres in the UK

  1. Jamessquared

    Jamessquared Nat Pres stalwart

    注册日期:
    2008-03-08
    帖子:
    27,811
    支持:
    64,528
    所在地:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Robin - what are the duties of Line Controller (presumably somewhat similar to the duty Operating Supervisor that we have every day?). Feels to me that being both Line Controller and Signalman is a big job - is it normal that they are combined, or would the preference be that they are separate roles and it was an out-of-course situation that you ended up doing both on one day?

    Tom
     
  2. Yorkshireman

    Yorkshireman Part of the furniture

    注册日期:
    2014-07-06
    帖子:
    4,486
    支持:
    5,045
    性别:
    职业:
    Comfy chair occupant!
    所在地:
    No moaners please!
    Heritage Railway Volunteer:
    No I do not currently volunteer
    If a loop is being considered the Dunster side of the crossing it would be false economy not to provide the extra road at the crossing as the extra cost would be relatively small and could provide even more flexibility. Time to think outside the box for a change.
     
  3. Robin Moira White

    Robin Moira White Resident of Nat Pres

    注册日期:
    2014-04-27
    帖子:
    11,404
    支持:
    18,231
    性别:
    职业:
    Barrister
    所在地:
    Stogumber
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    As you know, there was a time when I used to be on the Bluebell's daily 'Responsible Officer' roster, took the same role for the K&ESR some years ago and was first line operating response for British Railways when I worked for them. On quieter days there is no problem with combining Minehead signalman and Line Controller but you can be a bit stretched on busier days. We do always have an on-call 'Duty Officer' as well. How / when the Controller / Minehead signalman might be split is something 'on the list' for the new 'Head of Operating' to consider when he starts in June.

    Robin
     
    已获得Bean-counterJamessquared的支持.
  4. Robin Moira White

    Robin Moira White Resident of Nat Pres

    注册日期:
    2014-04-27
    帖子:
    11,404
    支持:
    18,231
    性别:
    职业:
    Barrister
    所在地:
    Stogumber
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I disagree.

    Robin
     
  5. Pete Thornhill

    Pete Thornhill Resident of Nat Pres Staff Member Administrator Moderator Friend

    注册日期:
    2008-07-24
    帖子:
    7,781
    支持:
    5,932
    But would there be any use for it given the increase in capacity a loop would provide as it would give plenty of additional flexibility?

    The layout wouldn't be a million miles from the SVR at Kidderminster which has two platforms along with a loop outside the station. It's certainly put to good use and a gala will usually see the flexibility put to good use.
     
    已获得Yorkshireman的支持.
  6. Yorkshireman

    Yorkshireman Part of the furniture

    注册日期:
    2014-07-06
    帖子:
    4,486
    支持:
    5,045
    性别:
    职业:
    Comfy chair occupant!
    所在地:
    No moaners please!
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Would you be kind enough to explain your reasons? Doing it when the crossing is being revamped anyway would cost very little extra whereas adding a road later would be many times more costly. The "spare" road need not be connected beyond the crossing limits until required.
     
  7. GWR Man.

    GWR Man. Well-Known Member

    注册日期:
    2014-10-08
    帖子:
    2,259
    支持:
    2,695
    性别:
    所在地:
    Taunton
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    已获得Yorkshireman的支持.
  8. Jamessquared

    Jamessquared Nat Pres stalwart

    注册日期:
    2008-03-08
    帖子:
    27,811
    支持:
    64,528
    所在地:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    So is it currently that the two roles (Line Controller and Minehead Signalman) are always combined?

    I can see advantages both ways - certainly combining them cuts out one link in any communications chain - though also I can imagine that if you had an untoward issue that required some complex resolution, liaison with outside stakeholders and maybe replanning of the service, you wouldn't necessarily wish to be dealing with that while also carrying out signalling duties. (Or would those kind of things be taken up by the Duty Officer?) Always interesting to see what operating practices other lines use, in any case.

    (As an aside - I was Loco Running Foreman on the second day of the Flying Scotsman gala at the Bluebell, and even though my responsibility and authority essentially began and ended at the loco yard exit signal, I don't think I would have wanted anything else to deal with on top, certainly not for the first four hours of the day!)

    Tom
     
    Last edited: 2017-05-03
  9. Yorkshireman

    Yorkshireman Part of the furniture

    注册日期:
    2014-07-06
    帖子:
    4,486
    支持:
    5,045
    性别:
    职业:
    Comfy chair occupant!
    所在地:
    No moaners please!
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thanks but it seems to me that a few thousand spent when the crossing is revamped would allow extra flexibility in future at much less cost than if a second road had to be constructed later. It is certainly worth considering costing it rather than rejecting it out of hand as some seem to be doing.
     
    Last edited: 2017-05-03
  10. Yes and make it dual gauge too ;)

    Steve
    (one day the WSR will recreate the SCR :) )
     
    已获得Yorkshireman的支持.
  11. Robin Moira White

    Robin Moira White Resident of Nat Pres

    注册日期:
    2014-04-27
    帖子:
    11,404
    支持:
    18,231
    性别:
    职业:
    Barrister
    所在地:
    Stogumber
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Yes, that is the present arrangement.

    The extent to which the Duty Officer gets involved with any incident is a matter of discussion between the Controller and the Duty Officer.

    Robin
     
  12. Robin Moira White

    Robin Moira White Resident of Nat Pres

    注册日期:
    2014-04-27
    帖子:
    11,404
    支持:
    18,231
    性别:
    职业:
    Barrister
    所在地:
    Stogumber
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Yes.

    The WSR is at capacity at Galas with an hourly service. This is determined by the long BA to WN and WN to CE sections.

    Greater capacity, the ability to run a Goods train during the passenger service and the opportunity to have some recovery time in a stretched timetable requires those long sections to be divided.

    Some additional terminal capacity at both BL and MD would not go amiss, in time.

    Robin
     
  13. AnthonyTrains2017

    AnthonyTrains2017 Well-Known Member

    注册日期:
    2014-09-28
    帖子:
    2,237
    支持:
    918
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Always wanted to see a loco being loaded on to lorry, delighted to watch this afternoon
     
  14. AnthonyTrains2017

    AnthonyTrains2017 Well-Known Member

    注册日期:
    2014-09-28
    帖子:
    2,237
    支持:
    918
    Heritage Railway Volunteer:
    No I do not currently volunteer
    IMG_8538.JPG IMG_2301.JPG
     
    已获得Paul KibbeyYorkshireman的支持.
  15. Ploughman

    Ploughman Part of the furniture

    注册日期:
    2008-04-01
    帖子:
    5,969
    支持:
    2,761
    职业:
    Ex a lot of things.
    所在地:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Looks like it is a different method from the norm.
    Saves building 2 ramps though, just need enough space to get 2 trailers positioned back to back.
     
  16. Bayard

    Bayard Well-Known Member

    注册日期:
    2015-04-26
    帖子:
    1,841
    支持:
    3,904
    性别:
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Please explain how, if we are not talking about a physical third platform?
     
  17. AnthonyTrains2017

    AnthonyTrains2017 Well-Known Member

    注册日期:
    2014-09-28
    帖子:
    2,237
    支持:
    918
    Heritage Railway Volunteer:
    No I do not currently volunteer
  18. Robin Moira White

    Robin Moira White Resident of Nat Pres

    注册日期:
    2014-04-27
    帖子:
    11,404
    支持:
    18,231
    性别:
    职业:
    Barrister
    所在地:
    Stogumber
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Both platforms occupied.

    Arriving train 'arrives' in loop Dunster side of Level crossing and so clears single line to Dunster.

    Train departs either main or bay platform.

    Train in loop enters now free platform.

    And for my next trick.....:)

    Robin
     
    已获得Paul Kibbeytoplink的支持.
  19. Fred Kerr

    Fred Kerr Resident of Nat Pres Friend

    注册日期:
    2006-03-24
    帖子:
    8,383
    支持:
    5,368
    性别:
    职业:
    Freelance photo - journalist
    所在地:
    Southport
    Having been impressed with the length of Minehead's platform I have often wondered if there is any value in "splitting" the platform with a mid-way point to allow two trains to operate from the platform; the one nearest the buffers being able to depart via said point then leaving the top half of the platform to either act as a loop (whereby trains set back before passengers entrain) or simply stand until ready for departure.
     
  20. Jeff Price

    Jeff Price Member

    注册日期:
    2013-08-25
    帖子:
    715
    支持:
    1,409
    Heritage Railway Volunteer:
    Yes I am an active volunteer

    How would this train in the loop give up the single line token to allow it to be given to the departing train.

    then

    How would the train in the loop then be allowed to leave the loop to enter the platform.

    Would the signal box have to be moved the other side of the crossing ???

    Jeff Price
     

分享此页面