If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

West Somerset Railway General Discussion

Тема в разделе 'Heritage Railways & Centres in the UK', создана пользователем gwr4090, 15 ноя 2007.

  1. Robin Moira White

    Robin Moira White Resident of Nat Pres

    Дата регистрации:
    27 апр 2014
    Сообщения:
    11.404
    Симпатии:
    18.231
    Пол:
    Женский
    Род занятий:
    Barrister
    Адрес:
    Stogumber
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The method of working I have set out assumes that the box has been moved adjacent to the crossing to deal with a new full barrier crossing.

    As at the moment, the single line starts / ends at an advanced starter / outer home a long way east of the crossing.

    The incoming loco would be carrying the token, so the signalman would have only a short walk to retrieve it.

    The outgoing train would collect the token just after passing over the crossing.

    Robin
     
  2. Robin Moira White

    Robin Moira White Resident of Nat Pres

    Дата регистрации:
    27 апр 2014
    Сообщения:
    11.404
    Симпатии:
    18.231
    Пол:
    Женский
    Род занятий:
    Barrister
    Адрес:
    Stogumber
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Better, IMHO, to invest the trackwork and signalling involved in the 'arrival loop' alternative.

    Robin
     
  3. Maunsell907

    Maunsell907 Member

    Дата регистрации:
    4 ноя 2013
    Сообщения:
    915
    Симпатии:
    2.078
    Пол:
    Мужской
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Whilst I can see the advantages of such a loop I think at the moment it should be placed in the "nice to have category"

    For the Mid Hants running into a single platform at Alton I perceive their loop to be an operational imperative.

    The current imperative for the WSR is to spend whatever financial/manpower resources are available on, 'wisely and thoughtfully', improving/replacing the existing route track work.

    Michael Rowe
     
    1472, burmister, Spud и ещё 1-му нравится это.
  4. Paul Kibbey

    Paul Kibbey Well-Known Member

    Дата регистрации:
    25 июл 2014
    Сообщения:
    1.165
    Симпатии:
    1.402
    Пол:
    Мужской
    Род занятий:
    Retired
    Адрес:
    Land of Sodor
    Heritage Railway Volunteer:
    No I do not currently volunteer
  5. Steve

    Steve Resident of Nat Pres Friend

    Дата регистрации:
    7 окт 2006
    Сообщения:
    12.732
    Симпатии:
    11.848
    Род занятий:
    Gentleman of leisure, nowadays
    Адрес:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Unless the loco plus tender come in at less than about 30 tons, you can't put them both on the same trailer (and the only loco I know that fits that category is FR No.20); It's illegal. look closely and you'll se it is two trailers, back to back.
     
    Paul Kibbey и Wenlock нравится это.
  6. Robin Moira White

    Robin Moira White Resident of Nat Pres

    Дата регистрации:
    27 апр 2014
    Сообщения:
    11.404
    Симпатии:
    18.231
    Пол:
    Женский
    Род занятий:
    Barrister
    Адрес:
    Stogumber
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It is important to understand which improvements would add in useful extra line capacity (Leigh and Kentsford Loops, MD arrival loop, BL platform 3) and which will not (double track Dunster to Minehead) so that when developments occur, they can be built in, or at least not precluded by work done.

    I expect (hope!) to be associated with the WSR for the next 20 years or so and if we are still only carrying a little under 200,000 visitors per year then, we will not have made the best of what we have nor arranged a suitable legacy for the third century of the WSR.

    I also remember exactly this being said when it was proposed to resignal Crowcombe ('that loop capacity will never be needed') and Bishops Lydeard ('all we need to do there is run round and come back'). And I remember Chris van den Arend having to work hard to justify the signalling we now have at Minehead at a time when a normal WSR train was 4 coaches and 6 was exceptional.

    Time will tell.;)

    Robin
     
    Last edited: 4 май 2017
    Paul Kibbey, jnc, Bean-counter и ещё 1-му нравится это.
  7. daveb

    daveb Member

    Дата регистрации:
    5 сен 2005
    Сообщения:
    945
    Симпатии:
    484
    Пол:
    Мужской
    Адрес:
    Wimborne, Dorset
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I can see the advantage of being able to shunt an incoming excursion out of the way whilst its passengers are enjoying the delights of Minehead. However, the use of such a loop in Gala timetables would need to be considered with care. There would be nothing more frustrating than to arrive in the loop at Minehead, watch the up train running past, and then have to wait for an hour until the next up train leaves. You would find a lot of people would swap services at Dunster instead. Would Dunster be able to comfortably handle the numbers?

    The situation I've described occurs frequently during SVR Galas, and is one of the reasons why I keep clear of the Kidderminster to Bewdley section during such events.

    Whilst I can understand the advantages of reinstating Kentsford Loop, I've always thought that Leigh Loop was too near the Crowcombe Heathfield end of the section to make a real difference.

    DaveB
     
    Yorkshireman нравится это.
  8. Robin Moira White

    Robin Moira White Resident of Nat Pres

    Дата регистрации:
    27 апр 2014
    Сообщения:
    11.404
    Симпатии:
    18.231
    Пол:
    Женский
    Род занятий:
    Barrister
    Адрес:
    Stogumber
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Easily - a nice wide 8 coach platform.

    It works OK at Leigh. But whisper it quietly - my preferred option for splitting the WN - CE section would be a loop at the south end of Stogumber platform. A bit more central in the section, a location with power, road access and the like already sorted, and only 100 yards from home to the box!

    Robin
     
    Paul Kibbey, oddsocks, Paul42 и 2 другим нравится это.
  9. burmister

    burmister Member

    Дата регистрации:
    2 авг 2008
    Сообщения:
    284
    Симпатии:
    292
    And all the extra traffic these improvements will allow at the same time reduce what is left of the life expectancy in the track. I seem to recall all the angst over the track grinding a few years back was that the then Civil Engineer was trying to eek out what life was left in the rails and not much has been renewed since then.
    So by all means invest in new capacity but make sure the main line gets investment at the same level as the NYMR have been and doing. ie renew completely Formation, Sleepers and put in CWR. I do not read anywhere that the WSR is doing this.

    Brian
    Shareholder and Ex WSRA member
     
    jnc нравится это.
  10. Robin Moira White

    Robin Moira White Resident of Nat Pres

    Дата регистрации:
    27 апр 2014
    Сообщения:
    11.404
    Симпатии:
    18.231
    Пол:
    Женский
    Род занятий:
    Barrister
    Адрес:
    Stogumber
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I quite agree.

    But it all has to go together. We need the turnover to pay for the renewals.

    The trackbed at Minehead station throat was very significantly renewed this winter, in an area of very poor ground conditions,

    Robin
     
    Wenlock и Yorkshireman нравится это.
  11. Snifter

    Snifter Well-Known Member

    Дата регистрации:
    26 авг 2014
    Сообщения:
    1.692
    Симпатии:
    4.298
    Пол:
    Мужской
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The Minehead trackbed used to be the highest point in the surrounding area. With all of the development, it is now one of the lowest and as a result, the groundwater has risen. I'm not a civil engineer, nor even an uncivil one however I wonder if a long sump and a pump installed either side of the trackbed would help solve the problems.
     
    Yorkshireman нравится это.
  12. Robin Moira White

    Robin Moira White Resident of Nat Pres

    Дата регистрации:
    27 апр 2014
    Сообщения:
    11.404
    Симпатии:
    18.231
    Пол:
    Женский
    Род занятий:
    Barrister
    Адрес:
    Stogumber
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I prefer to see them being OFF loaded!:)

    (Good clear photo, BTW.)

    Robin
     
    Yorkshireman нравится это.
  13. Bean-counter

    Bean-counter Part of the furniture

    Дата регистрации:
    21 июл 2007
    Сообщения:
    5.844
    Симпатии:
    7.688
    Пол:
    Мужской
    Адрес:
    Former NP Member
    Heritage Railway Volunteer:
    No I do not currently volunteer
    That was my initial thought when looking at the first picture, which I don't think would be permitted for a 'special types' trailer/tractor unit. In fact, there are two trailers, parked back to back allowing the use of a single ramp as @Ploughman realised and referred to - ver nifty!

    Steven
     
    Paul Kibbey и Yorkshireman нравится это.
  14. Maunsell907

    Maunsell907 Member

    Дата регистрации:
    4 ноя 2013
    Сообщения:
    915
    Симпатии:
    2.078
    Пол:
    Мужской
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    To be quite brutal, if we do not deal with some of the current infrastructure concerns there will not be a Railway as we know it in 20 years. Similarly if we do not grow our pax beyond 200,000 then Line expansion becomes an unproductive luxury.
    These two issues are the strategic imperatives for the next five years.

    Regarding Crossing loops: Kentsford was manned by the GWR and BR(W) throughout the year. Leigh on peak Saturdays only. I have always thought, apart from the fact there was HMG money available for line improvements in the 30s, that the key benefit of Leigh, was that non stopping TN-MD services could pass at Leigh rather than risk them being stopped at CE or WN leading to inevitable passenger confusion.

    I am not sure that the WN-CE section represents number 2 bottleneck after WN-BA. Whilst running times are typically WN-CE 20mins vs BA-MD 14, simultaneous train entry is now feasible at both WN and CE. The BA-MD section at BA has the LC challenge plus the slow entry to MD (road crossing), token exchange at SB and the inevitable delays inherent in dispatching trains at 'open' Terminal stations feeding to a single track routeq.

    However these are all luxuries. More passengers, maximum spend on upgrading existing infrastructure first please.

    Michael Rowe
     
    Last edited: 4 май 2017
    Bean-counter, 1472, Spud и 4 другим нравится это.
  15. MellishR

    MellishR Resident of Nat Pres Friend

    Дата регистрации:
    16 апр 2009
    Сообщения:
    8.912
    Симпатии:
    5.849
    That post (2772) addressed the possibility of having a second track over the crossing and connected to the rest of the railway, with all the necessary crossing controls and signalling for both tracks, which evidently is not justified at present. But the suggestion was just to lay two tracks over the crossing, without connecting the second one to anything, as a bit of future-proofing. Depending on what else needs to be done when the crossing is being rebuilt, might that be cheap enough to be worth doing?
     
    tracker, jnc, railrover и 2 другим нравится это.
  16. Captain Fantastic

    Captain Fantastic Member

    Дата регистрации:
    14 апр 2016
    Сообщения:
    461
    Симпатии:
    184
    Пол:
    Мужской
    Род занятий:
    Guido Killer Pimp
    Адрес:
    47603
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    TBF I agree just putting the second track over the crossing itself just in case etc seams like a sensible move, if it never gets done the the extra amount wouldn't break the bank, whereas if you lay singly then decide down the road you do need it, that's many pounds
     
    tracker, railrover и echap нравится это.
  17. Yorkshireman

    Yorkshireman Part of the furniture

    Дата регистрации:
    6 июл 2014
    Сообщения:
    4.486
    Симпатии:
    5.045
    Пол:
    Мужской
    Род занятий:
    Comfy chair occupant!
    Адрес:
    No moaners please!
    Heritage Railway Volunteer:
    No I do not currently volunteer
    That is exactly my point. The expensive part of adding an extra road is all the work on the road carriageway. Just adding the track and provision for any signal rods or cables and leaving the ends extending a few feet out from the edge of the tarmac would cost very little if done at the time the road is replaced. That way if an extra road across the crossing is needed then it is simple to connect it all up without any disruption to the crossing. Simples!;)
     
    Paul Kibbey, tracker и echap нравится это.
  18. aldfort

    aldfort Well-Known Member

    Дата регистрации:
    4 мар 2009
    Сообщения:
    1.933
    Симпатии:
    4.252
    Пол:
    Мужской
    Род занятий:
    Retired
    Адрес:
    Cardiff
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I have to say in the great scheme of all things WSR Michael has this exactly right IMHO. I would also venture that there would be very few loco-men, train-crew or P-Way who would disagree with his assessment.
     
    1472, Hugh Perrett, Spud и ещё 1-му нравится это.
  19. Robin Moira White

    Robin Moira White Resident of Nat Pres

    Дата регистрации:
    27 апр 2014
    Сообщения:
    11.404
    Симпатии:
    18.231
    Пол:
    Женский
    Род занятий:
    Barrister
    Адрес:
    Stogumber
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    When the allies began to run out of steam in France in late summer 1944 there were two schools of thought about what to do next. 'Monty' wanted a monopoly of resources for a decisive thrust towards the heart of Germany. He was given his head and we all know how Operation 'Market Garden' ended. (Grandfather White was waiting with the main body of XXX Corps on the Dutch frontier for the follow-up strike that was never required.). Progress then settled into the less spectacular approach favoured by Eisenhower of 'bulling forward on all fronts'. It was an approach with difficulties such as when the Axis forces were able to concentrate their forces as in the Ardennes (Grandfather White awarded his MM there for an action on Xmas Day 1944.). But it got the allies to both sides of the river Elbe (and Grandfather to Lubeck) by May 1945....

    Development of the Railway has, inevitably, to be more 'Eisenhower' than 'Monty'. It is, for example, no use leaping forward in motive power provision without carriages for them to pull or sections to allow trains to run or p.Way up to the demands placed on it.

    We must all move forward together. No one area is the key.

    Time for a quick Taylor Woodrow symbol.....

    Robin

    IMG_5304.GIF
     
    Last edited: 4 май 2017
    nick813 нравится это.
  20. Ploughman

    Ploughman Part of the furniture

    Дата регистрации:
    1 апр 2008
    Сообщения:
    5.969
    Симпатии:
    2.761
    Род занятий:
    Ex a lot of things.
    Адрес:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Could I make a plea.
    Would it be possible to educate those of us not familiar with the WSR into what the Initials stand for.
    I assume WN - BA Means something other than Willesden to Bishop Auckland.
    The post 2 above has a fair collection of these sets of Initials some can be worked out MD I take it is Minehead but some of the rest mean nowt to me.
     

Поделиться этой страницей