If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

How many solar panels or wind turbines would it take to power an EMU?

Rasprava u 'Diesel & Electric Traction' pokrenuta od SilentHunter86, 17. Lipanj 2017..

  1. SilentHunter86

    SilentHunter86 Member

    Pridružen(a):
    31. Prosinac 2014.
    Poruka:
    306
    Lajkova:
    25
    Spol:
    Muškarac
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    That is, how, much wattage is needed to run one.
     
  2. goldfish

    goldfish Nat Pres stalwart

    Pridružen(a):
    13. Siječanj 2009.
    Poruka:
    16,159
    Lajkova:
    14,427
    I suspect clearance is going to be the bigger issue…
     
    Martin Perry se sviđa ovo.
  3. martin1656

    martin1656 Nat Pres stalwart Friend

    Pridružen(a):
    8. Prosinac 2014.
    Poruka:
    19,264
    Lajkova:
    12,517
    Spol:
    Muškarac
    Grad:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Especially with roof mounted windmills, :eek: still they could always try clockwork engines, wind up the key at each station stop, :)
     
  4. Jamessquared

    Jamessquared Nat Pres stalwart

    Pridružen(a):
    8. Ožujak 2008.
    Poruka:
    27,798
    Lajkova:
    64,476
    Grad:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    A 4VEP is about 750kw for a four car mainline unit, so that is an order of magnitude what you'd want.

    Tom
     
  5. martin1656

    martin1656 Nat Pres stalwart Friend

    Pridružen(a):
    8. Prosinac 2014.
    Poruka:
    19,264
    Lajkova:
    12,517
    Spol:
    Muškarac
    Grad:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    i think you would be talking having the entire unit made from solar energy absorbing material , and even then, some back up power would be needed, what sort of wattage could such a 4 car unit create , if every panel was made of energy absorbing material ?
     
  6. SilentHunter86

    SilentHunter86 Member

    Pridružen(a):
    31. Prosinac 2014.
    Poruka:
    306
    Lajkova:
    25
    Spol:
    Muškarac
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I was more specifically talking about energising a third rail.
     
  7. burmister

    burmister Member

    Pridružen(a):
    2. Kolovoz 2008.
    Poruka:
    284
    Lajkova:
    292
    You have to take into account starting inrush current so a considerably bigger power resource off grid is required over and above your steady state power consumption unless you have a battery/flywheel boost device embedded in your supply system.
    Easy way and I suggest a greener way to provide a power source for a single 4 car emu is to buy say a class 47 which will supply you with a suitable power and voltage around the required 700V DC , do some mods to the load regulator and connect it up with a suitable switch panel (and DC is a lot simpler and easier than AC) to a third rail.
    But thats not green power I hear some muttering. Well the 47 would not take any new energy to manufacture it (a point proponents of wind and solar often avoid talking about) and can run off sulphur free oil so I suspect if you did a life cycle carbon balance a 47 type power source would win hands down. Diesel fuel from waste plastic is not too far away either.
     
    The Green Howards se sviđa ovo.
  8. 45045

    45045 New Member

    Pridružen(a):
    28. Srpanj 2009.
    Poruka:
    117
    Lajkova:
    49
    And you would need it anyway on dull days and at night.........
     
  9. Martin Perry

    Martin Perry Nat Pres stalwart Staff Member Moderator Friend

    Pridružen(a):
    15. Travanj 2006.
    Poruka:
    16,551
    Lajkova:
    7,897
    Grad:
    1012 / 60158
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    And who ever had a dull day with a Class 47? :)
     
    ssk2400 and Copper-capped like this.
  10. martin1656

    martin1656 Nat Pres stalwart Friend

    Pridružen(a):
    8. Prosinac 2014.
    Poruka:
    19,264
    Lajkova:
    12,517
    Spol:
    Muškarac
    Grad:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    when you add in the need for multiple generation along the route of a line, i dont think any solar or renewable equiped power station would generate enough power to provide a reliable power source, prehaps more thought should go into reducing the amount of land tied power needed by having more on board generating potential, such as enhanced flywheel technology, so that the only time a unit draws power from a third rail is when accelorating, as in starting away then an on board generator provides the power and the draw on 3rd rail is reduced to a marginal amount, the power being generated by the unit using the momentum of the unit, axle hung generators, etc, flywheel technology, regenerative braking, so the unit its self becomes a generator .
     
  11. staffordian

    staffordian Well-Known Member

    Pridružen(a):
    27. Ožujak 2012.
    Poruka:
    1,524
    Lajkova:
    2,172
    Spol:
    Muškarac
    Interesi:
    Retired
    Grad:
    The Potteries
    Heritage Railway Volunteer:
    No I do not currently volunteer
    This perpetual motion business is easy peasy.

    All you have to do is mount a big wind turbine/generator on the front of each unit. Use the third rail current to start the unit then as soon as the fan starts to go round and generate the juice, swap to that. The faster it goes, the faster the turbine rotates and the more electricity it generates.

    The problem would be trying to stop it.

    Sorted :D;)
     
    maddog, brmp201, 2392 i 3 ostalih se sviđa ovo.
  12. Jamessquared

    Jamessquared Nat Pres stalwart

    Pridružen(a):
    8. Ožujak 2008.
    Poruka:
    27,798
    Lajkova:
    64,476
    Grad:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    No problem - you stick the stations on the top of hills. Then the train scrubs off speed arriving and, when ready to go, you have a nice downhill start to get going and ramp the wind turbine up to speed ...

    Tom
     
    oddsocks, oldmrheath i staffordian se sviđa ovo.
  13. staffordian

    staffordian Well-Known Member

    Pridružen(a):
    27. Ožujak 2012.
    Poruka:
    1,524
    Lajkova:
    2,172
    Spol:
    Muškarac
    Interesi:
    Retired
    Grad:
    The Potteries
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I reckon between us we've got this railway lark cracked :)
     
  14. Johnb

    Johnb Nat Pres stalwart

    Pridružen(a):
    3. Prosinac 2014.
    Poruka:
    15,538
    Lajkova:
    18,386
    Spol:
    Muškarac
    Interesi:
    Retired, best job I've ever had
    Grad:
    Buckinghamshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Exactly what happened whe they designed the deep level London tube. Where they have extended the platforms for eight car trains on the Central Line you can see the change in gradient
     
  15. Steve B

    Steve B Well-Known Member

    Pridružen(a):
    20. Lipanj 2008.
    Poruka:
    2,167
    Lajkova:
    1,579
    Grad:
    Shropshire
    Which is how some of the tube lines are laid out, and of course, being in a tube, one train moving sucks/blows the trains behind or in front along as well, thereby powering more than one train at a time. At this rate you could sell spare electricity back into the grid!

    I might have missed something there...

    Steve B
     
    staffordian and Jamessquared like this.
  16. seawright

    seawright New Member

    Pridružen(a):
    30. Rujan 2012.
    Poruka:
    169
    Lajkova:
    26
    Don't know about 25Kv stock but the locos that ran on the Woodhead line made good use of the gradient and regenerative breaking to reduce energy costs.
    If you really want to go green you could always learn something from the cliff lift between Lynton and Lynmouth.
     
  17. Steve B

    Steve B Well-Known Member

    Pridružen(a):
    20. Lipanj 2008.
    Poruka:
    2,167
    Lajkova:
    1,579
    Grad:
    Shropshire
    Turn parts of the Settle to Carlisle into a water balance funicular?:)

    Ok, I'll go and sit quietly in the corner for a bit...

    Steve B
     
  18. martin1656

    martin1656 Nat Pres stalwart Friend

    Pridružen(a):
    8. Prosinac 2014.
    Poruka:
    19,264
    Lajkova:
    12,517
    Spol:
    Muškarac
    Grad:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    thats easy, ducted air to start and control the turbine speed, direct the air from the turbines to the brakes, slows the turbine down, cooling air helps the braking by reducing fade, then again as the speed increases, air ducted to spin the turbine, maintains a steady speed.
     
    oldmrheath and staffordian like this.
  19. Eightpot

    Eightpot Resident of Nat Pres Friend

    Pridružen(a):
    10. Kolovoz 2006.
    Poruka:
    8,340
    Lajkova:
    2,506
    Spol:
    Muškarac
    Interesi:
    Engineer Emeritus
    Grad:
    Aylesbury
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Do I detect some wishful thinking here?
     
  20. staffordian

    staffordian Well-Known Member

    Pridružen(a):
    27. Ožujak 2012.
    Poruka:
    1,524
    Lajkova:
    2,172
    Spol:
    Muškarac
    Interesi:
    Retired
    Grad:
    The Potteries
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I blame the heat :)
     
    MellishR se sviđa ovo.

Podijelite ovu stranicu