If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

West Somerset Railway General Discussion

Discuție în 'Heritage Railways & Centres in the UK' creată de gwr4090, 15 Noi 2007.

  1. Bean-counter

    Bean-counter Part of the furniture

    Înscris:
    21 Iul 2007
    Mesaje:
    5.844
    Aprecieri primite:
    7.688
    Sex:
    Masculin
    Locație:
    Former NP Member
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Many thanks - thought a second Manor was on the agenda!

    I suspect the peak season will be a little tense for the West Somerset with a fleet of 5 to cover is it 3 diagrams?

    Steven
     
    Yorkshireman apreciază asta.
  2. Robin Moira White

    Robin Moira White Resident of Nat Pres

    Înscris:
    27 Apr 2014
    Mesaje:
    11.416
    Aprecieri primite:
    18.298
    Sex:
    Feminin
    Ocupație:
    Barrister
    Locație:
    Stogumber
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    We already have a number of war time 45' rail lengths which came from the USA in the WSR main line.

    But they are welded up in fours to make 180' and so equivalent to 3 British standard 60' lengths.

    Robin
     
  3. Yorkshireman

    Yorkshireman Part of the furniture

    Înscris:
    6 Iul 2014
    Mesaje:
    4.486
    Aprecieri primite:
    5.045
    Sex:
    Masculin
    Ocupație:
    Comfy chair occupant!
    Locație:
    No moaners please!
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Oh no! Miss Type has struck again. Insert your choice of expletive *******************
     
    Dennis John Brooks apreciază asta.
  4. johnofwessex

    johnofwessex Resident of Nat Pres

    Înscris:
    6 Apr 2015
    Mesaje:
    9.851
    Aprecieri primite:
    8.029
    Sex:
    Masculin
    Ocupație:
    Thorn in my managers side
    Locație:
    72
    Heritage Railway Volunteer:
    No I do not currently volunteer
    FB or BH? Were they welded on installation or subsequently?
     
  5. Robin Moira White

    Robin Moira White Resident of Nat Pres

    Înscris:
    27 Apr 2014
    Mesaje:
    11.416
    Aprecieri primite:
    18.298
    Sex:
    Feminin
    Ocupație:
    Barrister
    Locație:
    Stogumber
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    On installation, shortly postwar. Bullhead.

    Robin
     
  6. 45076

    45076 Member

    Înscris:
    15 Sep 2011
    Mesaje:
    478
    Aprecieri primite:
    313
    Sex:
    Masculin
    Ocupație:
    Retired
    Locație:
    34004
    Heritage Railway Volunteer:
    No I do not currently volunteer

    Foxcote Manor Society social media accounts posted yesterday:

    "Speaking of which, 7822 is hopefully going to be back in steam in a few weeks and we are all looking forward to seeing her back".

    So that would mean the peak season would be over before it would be available. Although no official announcements have been made its now very unlikely to visit WSR this season.
     
  7. Ploughman

    Ploughman Part of the furniture

    Înscris:
    1 Apr 2008
    Mesaje:
    6.004
    Aprecieri primite:
    2.776
    Ocupație:
    Ex a lot of things.
    Locație:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    As has been stated, You can weld up any rails, but some are better than others.
    BH rail joints can be welded but they are slightly more awkward to set up than FB joints.
    It is best if you can cut off the bolt holes to remove any chance of rail flaws in the bolt hole areas, then weld up a series of joints into no more than 120fts and insert a closure rail to make up the difference in rail lengths.
    If welding up rails into 120fts consideration should be given to welding as a priority any non standard or junction plates due to the greater cost of new replacement plates.
     
  8. Paul Kibbey

    Paul Kibbey Well-Known Member

    Înscris:
    25 Iul 2014
    Mesaje:
    1.165
    Aprecieri primite:
    1.402
    Sex:
    Masculin
    Ocupație:
    Retired
    Locație:
    Land of Sodor
    Heritage Railway Volunteer:
    No I do not currently volunteer
    As I understand it the gaps in between rails are there to compensate for the expansion of the steel in hot weather , or is this an ' old wives tail '? On the big railway and the WSR so I'm told on this forum some of the rails are welded . My question is if expansion is involved how is it dealt with ? Thank you .
     
  9. Robin Moira White

    Robin Moira White Resident of Nat Pres

    Înscris:
    27 Apr 2014
    Mesaje:
    11.416
    Aprecieri primite:
    18.298
    Sex:
    Feminin
    Ocupație:
    Barrister
    Locație:
    Stogumber
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    OK, here comes the science bit.

    The coefficient of expansion of steel is around 0.000012. So a 60' rail at 10 degrees C will expand by a little under one fifth of an inch at 30 degrees C (and contract by the same amount at minus 10 degrees C). Three such lengths welded together (or 4 x 45') will change by just over half an inch with the same temperature changes. This is about how much expansion conventional bolted rail joints can deal with.

    Long lengths of continuously welded rail will try to expand and contract even more but modern track fittings will hold that back a bit. However, CWR is provided with long expansion joints to cope with a diagonal slice between the rails see photo below).

    Hope that helps

    Robin

    IMG_6673.JPG
     
    Last edited: 20 Iul 2017
    lowca63, Sunnieboy, TommyD și alți 6 apreciază asta.
  10. Maverick

    Maverick New Member

    Înscris:
    21 Iul 2014
    Mesaje:
    103
    Aprecieri primite:
    468
    Sex:
    Masculin
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Relating this to the WSR, Next time you go round watchet curves, keep an eye out for a joint like this. Its quite close to mineral line bridge.
     
    Paul Kibbey apreciază asta.
  11. NSWGR 3827

    NSWGR 3827 New Member

    Înscris:
    18 Ian 2009
    Mesaje:
    93
    Aprecieri primite:
    40
    Sex:
    Masculin
    Ocupație:
    Fitter & Machineist
    Locație:
    Down Under
    CWR is also generally under allot more tension than bolted rails.
     
    Aberdare apreciază asta.
  12. Paul Kibbey

    Paul Kibbey Well-Known Member

    Înscris:
    25 Iul 2014
    Mesaje:
    1.165
    Aprecieri primite:
    1.402
    Sex:
    Masculin
    Ocupație:
    Retired
    Locație:
    Land of Sodor
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thank you for that Robin , I've never seen an expansion joint before but I saw your picture before I read your text and knew exactly what it was . I haven't even thought about coefficient of expansion since 'O' level physics but do understand it . Once again thanks .
     
  13. Ploughman

    Ploughman Part of the furniture

    Înscris:
    1 Apr 2008
    Mesaje:
    6.004
    Aprecieri primite:
    2.776
    Ocupație:
    Ex a lot of things.
    Locație:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The calculation for Stressing CWR is
    e = extension in mm
    L length of free rail in metres.
    X = coefficient of expansion of steel 0.0000115
    t = difference between actual average rail temp and required Stress Free Temp 27C

    So for example T = 11, L = 300
    From this we can find e the extension required.

    27 - 11 = 16
    16 x 300m = 4800
    0.0000115 x 1000 = 0.0115
    4800 x 0.0115 = 55.2mm = e
     
    Paul Kibbey și Yorkshireman apreciază asta.
  14. Breva

    Breva Part of the furniture

    Înscris:
    11 Oct 2010
    Mesaje:
    2.420
    Aprecieri primite:
    4.191
    Locație:
    Gloucestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    We've been stressing CWR on the GWSR, and you can see a video of rail stressing here:
     
    Chris86, Paul Kibbey și Yorkshireman apreciază asta.
  15. Ploughman

    Ploughman Part of the furniture

    Înscris:
    1 Apr 2008
    Mesaje:
    6.004
    Aprecieri primite:
    2.776
    Ocupație:
    Ex a lot of things.
    Locație:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I should add that there are limits as to the length possible to pull due to curveature.
    On a straight the max possible is 900m each way in one pull.
    Add a curve in and the length drops quickly .
    For example from a straight down to a radius of 4000m 900m each way is possible.
    4000 - 2001m = 600m each way
    600m - 401m = 150m ew
    below 400 = 100m

    A further limit is imposed by a maximum pull force of 58 tonnes on the stressing gear.
     
    Paul Kibbey, jnc și Yorkshireman apreciază asta.
  16. 1472

    1472 Well-Known Member

    Înscris:
    26 Aug 2008
    Mesaje:
    1.971
    Aprecieri primite:
    2.676
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Having been on the WSR today 7822 was still expected - if a little late!
     
    Yorkshireman apreciază asta.
  17. Paul Kibbey

    Paul Kibbey Well-Known Member

    Înscris:
    25 Iul 2014
    Mesaje:
    1.165
    Aprecieri primite:
    1.402
    Sex:
    Masculin
    Ocupație:
    Retired
    Locație:
    Land of Sodor
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I feel like an expert now , lol . I do miss the clickity clack however .
     
    railrover apreciază asta.
  18. Robin Moira White

    Robin Moira White Resident of Nat Pres

    Înscris:
    27 Apr 2014
    Mesaje:
    11.416
    Aprecieri primite:
    18.298
    Sex:
    Feminin
    Ocupație:
    Barrister
    Locație:
    Stogumber
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Lots of nonsense is talked about track, often by those who should know better. The physics and the maths are relatively simple.

    Robin
     
  19. Herald

    Herald Member

    Înscris:
    30 Mar 2015
    Mesaje:
    311
    Aprecieri primite:
    581
    Sex:
    Masculin
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Lots of nonsense talked about many topics on here. Track is not, however, simple when considering life time costs, optimum alignment, noise transmission etc. etc. and could be why the long standing Permanent Way Institute exists.
     
    jnc, Jamie Glover și Aberdare apreciază asta.
  20. Robin Moira White

    Robin Moira White Resident of Nat Pres

    Înscris:
    27 Apr 2014
    Mesaje:
    11.416
    Aprecieri primite:
    18.298
    Sex:
    Feminin
    Ocupație:
    Barrister
    Locație:
    Stogumber
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Agreed.

    As a mere operator (but a scientist by degree) I started to learn about the physics and mathematics of track when I went on the Derailment investigation course Run at Derby Techical Centre some years ago. My railway bookshelves have several editions of 'British Railway Track.'

    You are right to mention the professional body. These are not expensive to join and can be a valuable source of access to experience for heritage railway employees and volunteers. I would heartily teccomrnd the Institute of Railway Operators to heritage railway operational staff, for example. The Institute of Railway Signal Engineers has a very active 'minor railways' section.

    Robin
     
    Wenlock și Yorkshireman apreciază asta.

Distribuie pagina asta