If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Tyseley Single Wheeler.

الموضوع في 'Steam Traction' بواسطة j4141, بتاريخ ‏2 ديسمبر 2010.

  1. sir gilbert claughton

    sir gilbert claughton Well-Known Member

    إنضم إلينا في:
    ‏17 يناير 2017
    المشاركات:
    1,062
    عدد المعجبين:
    511
    الجنس:
    ذكر
    الوظيفة:
    retired
    مكان الإقامة:
    east sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    ......
     
    Last edited: ‏28 جويلية 2017
  2. LMS2968

    LMS2968 Part of the furniture

    إنضم إلينا في:
    ‏1 سبتمبر 2006
    المشاركات:
    3,072
    عدد المعجبين:
    5,361
    الجنس:
    ذكر
    الوظيفة:
    Lecturer retired: Archivist of Stanier Mogul Fund
    مكان الإقامة:
    Wigan
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It did, though. Much depended on the size of the receiver and the valve opening and duration, which in those days was not high, even in full gear.
     
  3. Mencken

    Mencken New Member

    إنضم إلينا في:
    ‏5 جوان 2012
    المشاركات:
    99
    عدد المعجبين:
    31
    As I understand it, from down among the detailed description of the fund for the Castle class Defiant on Tyseley's website, the Bloomer is owned by '7029 Clun Castle Ltd'.

    A series of articles - at least seven - about this project in the Railway World from 1988 to 1991, by Bob Meanley, Michael Whitehouse and myself, include the information that work began in 1986 with a contribution of £40,000 from Birmingham City. I have heard about other large donations and bequests since then, but have not seen the details.

    Perhaps we will learn some definite facts tomorrow. At last!

    Harry Jack.
     
  4. andrewshimmin

    andrewshimmin Well-Known Member

    إنضم إلينا في:
    ‏18 مارس 2011
    المشاركات:
    1,770
    عدد المعجبين:
    2,170
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I think there's more in that theory than is often credited!
    Webb's trainees were often excellent - Aspinall, Ivatt, Gresley, Park, W.Wordsell, R.F.Trevithick, Hughes....
     
    Black Jim, LMS2968 و Gav106 معجبون بهذا.
  5. paullad1984

    paullad1984 Member

    إنضم إلينا في:
    ‏16 اكتوبر 2007
    المشاركات:
    925
    عدد المعجبين:
    436
    Gresley did his best learning at the L&Y....
     
  6. andrewshimmin

    andrewshimmin Well-Known Member

    إنضم إلينا في:
    ‏18 مارس 2011
    المشاركات:
    1,770
    عدد المعجبين:
    2,170
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Didn't everyone? But they learned from men who trained at Crewe. Horwich became what Crewe could have been if it hadn't got a bit lost.
     
  7. J Rob't Harrison

    J Rob't Harrison Member

    إنضم إلينا في:
    ‏6 نوفمبر 2016
    المشاركات:
    240
    عدد المعجبين:
    360
    الجنس:
    ذكر
    مكان الإقامة:
    Stafford
    Heritage Railway Volunteer:
    No I do not currently volunteer
    What was the upshot of the talk on the Bloomer today? I couldn't attend myself sadly but I would rather like to know.
     
    أعجب بهذه المشاركة Gav106
  8. MellishR

    MellishR Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏16 إبريل 2009
    المشاركات:
    8,912
    عدد المعجبين:
    5,847
    I just came to this thread hoping someone might have posted a report. I didn't take notes so I hope someone will post something more definitive, but to be going on with here's what I remember: apologies for any inaccuracies.

    Michael Whitehouse described Tyseley's vision for the future: some sort of display/museum/exhibition at Curzon St when HS2 arrives there, and some arrangement for bringing people from the newest intercity railway there to a representation of the oldest (i.e. the London and Birmingham, discounting the Liverpool and Manchester), with a Bloomer running with some imitation early LNWR coaches (on modern underframes) from Moor St to Tyseley. Most of the distance would be on a line formerly (or presently?) used for LE movements, but 250 yards on the main line, for which the Bloomer will need to be main line registered. Finishing the Bloomer as originally designed would cost ~£150k but the existing tender wheels (which are from two original tenders which had been reduced to four wheels each) aren't good enough for NR, nor are the existing loco axles. Making new wheels and axles will add another ~£100k. Then there are the coaches and the electronic gubbins. Grand total still needed, on top of the money already spent over the years, around half a million. But they do seem to want to get it done.
     
  9. MellishR

    MellishR Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏16 إبريل 2009
    المشاركات:
    8,912
    عدد المعجبين:
    5,847
    A few additions to what I said above.

    Michael Whitehouse said that they are at present not asking for money for the Bloomer, though they won't refuse any that is offered. What they are asking for is feedback on their vision.

    He pointed out that they have done several "impossible" things over the years, starting with his father's role in overcoming BR's steam ban and continuing with regular operation of the Shakespeare Express (which was initially refused), restoration of the Earl, etc. Building the Bloomer and running it on NR will be just one more.

    The concept of bringing tourists from HS2 somehow involves both the Bloomer on the short run from Moor St to Tyseley and the Shakespeare Express to Stratford, but either he didn't explain or I missed how those two would fit together.
     
    أعجب بهذه المشاركة Black Jim
  10. J Rob't Harrison

    J Rob't Harrison Member

    إنضم إلينا في:
    ‏6 نوفمبر 2016
    المشاركات:
    240
    عدد المعجبين:
    360
    الجنس:
    ذكر
    مكان الإقامة:
    Stafford
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thanks. I think the notion of running a shuttle service from Moor Street to Tyseley with the Bloomer and some replica stock is quite an exciting one.
     
    أعجب بهذه المشاركة Black Jim
  11. Spamcan81

    Spamcan81 Nat Pres stalwart

    إنضم إلينا في:
    ‏25 أوت 2007
    المشاركات:
    35,831
    عدد المعجبين:
    22,270
    الوظيفة:
    Training moles
    مكان الإقامة:
    The back of beyond
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Maybe so but the cynic in me says we won't be seeing the Bloomer completed any time soon.
     
    Kinghambranch, Mencken و Gav106 معجبون بهذا.
  12. Jimc

    Jimc Part of the furniture

    إنضم إلينا في:
    ‏8 سبتمبر 2005
    المشاركات:
    4,117
    عدد المعجبين:
    4,821
    الوظيفة:
    Once computers, now part time writer I suppose.
    مكان الإقامة:
    SE England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thing is though, if you're going to run a shuttle service as a permanent feature, don't you need at the barest minimum two locomotives , one to be running and one under overhaul?

    I suppose, though, any service which could be run by the Bloomer would be easily within the capabilities of one of their main line registered pannier tanks.
     
  13. FairlieSquarelie

    FairlieSquarelie New Member

    إنضم إلينا في:
    ‏31 اكتوبر 2013
    المشاركات:
    66
    عدد المعجبين:
    54
    الوظيفة:
    Losing slowly
    مكان الإقامة:
    1,500 miles from home
    The concept would give the locomotive an intriguing context and purpose, but that additional 350k does seem to put the whole thing just out of reach, again...
    Yet it does sound extremely cheap to bring the Bloomer up to mainline standard, AND create a rake of NR-compatible, replica carriage stock ~ even if the underframes are to hand, ready to run.
    The juxtaposition of LNWR and HS2 could be a masterstroke; the cost per yard to traverse NR might rise uncomfortably high ~ much like the cost per yard of HS2 itself...
     
    أعجب بهذه المشاركة Black Jim
  14. Kinghambranch

    Kinghambranch Well-Known Member

    إنضم إلينا في:
    ‏20 ديسمبر 2006
    المشاركات:
    1,879
    عدد المعجبين:
    1,612
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    White Rose County
    Heritage Railway Volunteer:
    No I do not currently volunteer
    What about the proposed steam centre at Stratford upon Avon? Has that now been shelved? A (quick) search revealed this planning application from 2008:

    http://democracy.stratford.gov.uk/mgConvert2PDF.aspx?ID=3217

    It's one thing to fund raise for £150K approximately to complete a locomotive that is not that far off from completion but quite another to go for a half-million pound package. Given the current financial uncertainties of Brexit/inflation etc. I'd go for the smaller sum myself and hire the Bloomer out to heritage lines.
     
    Black Jim و flying scotsman123 معجبون بهذا.
  15. 30854

    30854 Resident of Nat Pres

    إنضم إلينا في:
    ‏8 مارس 2017
    المشاركات:
    12,172
    عدد المعجبين:
    11,496
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Two locomotives? Mmmmm..... Wonder how much a mainline certified Crampton would come in at? If for no other reason than it'd certainly give the Vehicle Acceptance wallahs something different to chew on, though perhaps it'd be best to get the single wheeler up and running first!
     
    أعجب بهذه المشاركة The Dainton Banker
  16. Christopher125

    Christopher125 Part of the furniture

    إنضم إلينا في:
    ‏30 نوفمبر 2005
    المشاركات:
    2,846
    عدد المعجبين:
    581
    مكان الإقامة:
    Isle of Wight
    I'm rather surprised by this, is Michael not aware of the 'Midlands Rail Hub'? Running services via new 'Bordesley Chords' into four bays at Moor St must make this all but impractical. It's not confirmed yet but funding for an evaluation study was provided last year and is being championed by the new Mayor.

    The changes proposed at Moor St can be seen on page 60 of the Chiltern Route Study.
     
  17. S.A.C. Martin

    S.A.C. Martin Part of the furniture

    إنضم إلينا في:
    ‏31 أوت 2010
    المشاركات:
    5,615
    عدد المعجبين:
    9,418
    الجنس:
    ذكر
    الوظيفة:
    Asset Engineer (Signalling), MNLPS Treasurer
    مكان الإقامة:
    London
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The optimist in me says the idea has legs and could be a great way of getting people to the visitor's centre. The cynic in me questions if the additional cost will kill the Bloomer project once and for all.

    I'd like to see more details on it, to be fair. If the whole scheme was available to study online, that would be the best way of providing the best quality feedback we can all muster.

    More information required?
     
    أعجب بهذه المشاركة Kinghambranch
  18. Spamcan81

    Spamcan81 Nat Pres stalwart

    إنضم إلينا في:
    ‏25 أوت 2007
    المشاركات:
    35,831
    عدد المعجبين:
    22,270
    الوظيفة:
    Training moles
    مكان الإقامة:
    The back of beyond
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    For once I think we are both singing from the same song sheet.
     
  19. Copper-capped

    Copper-capped Part of the furniture

    إنضم إلينا في:
    ‏19 إبريل 2017
    المشاركات:
    3,350
    عدد المعجبين:
    4,071
    الجنس:
    ذكر
    مكان الإقامة:
    Stanthorpe, QLD, Australia
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Was there any timeline set out in this latest update from Tyseley? I admit I have hardly delved further than this thread for information about the Bloomer new build. Assuming that with the new plan, and the associated extra funds required to be raised to enable completion to mainline compliant standards, has the build again stretched time-wise? (Not that it appeared to be progressing at any great pace!). Bearing in mind that there must be people in the position of having contributed and been following this project from the get-go with an eye to seeing it completed in their lifetime, they may see this latest news, whilst positive in its vibe, however with the extra complexities required has just put such aspirations again out of reach.

    Whilst Tornado is by all accounts a new build success story, and I'm sure their will be others soon enough, I don't think {new build = automatic success} just yet. I think the planets have to align, (or be kicked into alignment!), on such a project for it to come to fruition without struggle. If there was enough public appetite for the Bloomer project it would be further along already. I'm sure a concerted campaign towards funding could see a heritage ready bloomer soon enough, but adding more six figure numbers on top of that???

    Whilst the completed Bloomer would undoubtedly be a very elegant machine will that be enough to sell the concept and fill the project coffers like say the Tornado project did?
     
  20. Jamessquared

    Jamessquared Nat Pres stalwart

    إنضم إلينا في:
    ‏8 مارس 2008
    المشاركات:
    27,793
    عدد المعجبين:
    64,456
    مكان الإقامة:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Actually, The Planet new build was a notable success :)

    Tom (here all week, folks...)
     
    MarkinDurham, oddsocks, stuarttrains و 7 آخرون معجبون بهذا.

مشاركة هذه الصفحة