Peak Rail General Discussion

Rasprava u 'Heritage Railways & Centres in the UK' pokrenuta od kestreleyes, 22. Studeni 2009..

  1. kestreleyes

    kestreleyes Well-Known Member

    Pridružen(a):
    4. Listopad 2007.
    Poruka:
    1,313
    Lajkova:
    936
    Interesi:
    signal engineer
    As far as I know no trains, the signalling wouldn't be working anyhow with track out neither the signals or gates would work as the track circuiting over the crossing would show occupied and holds everything anyhow

    In other news

    S&t

    Maintenance at Rowsley and riverside as usual (lots of lovely oiling and greasing) and some.more tree cutting I'm sure I've seen foliage seed twice already this year the steelwork for Rowsley cabin is painted up and moved out the shed for space now and rods on with the upright legs.

    I noted while having a brew the tank waggons main tank is now repainted and there's.some.big bits of wood to remake the wooden supports up with in the shed, I didn't get to speak with anyone about the work on the gwr loco but thee is a saddle tank being rewelded and on its back in the shed.
     

    Privici:

    philw2 se sviđa ovo.
  2. Woodster21

    Woodster21 Member

    Pridružen(a):
    4. Veljača 2007.
    Poruka:
    461
    Lajkova:
    50
    Grad:
    Derbyshire
  3. John Webb

    John Webb Member

    Pridružen(a):
    2. Ožujak 2010.
    Poruka:
    501
    Lajkova:
    86
    Interesi:
    Retired
    Grad:
    St Albans, Herts
    Heritage Railway Volunteer:
    Yes I am an active volunteer
  4. kestreleyes

    kestreleyes Well-Known Member

    Pridružen(a):
    4. Listopad 2007.
    Poruka:
    1,313
    Lajkova:
    936
    Interesi:
    signal engineer
    image.jpeg Very small update this week as my main job was to go recover some flange lubricators with a colleague of another line, from down in deepest Midlands , a joint recovery effort, now comes the Fettling and bodging excersise of getting some up and running between us From all the bits we got, Hopefully some more update mid week when I get down again

    Last a parish notice for the upcoming 40s event.

    5th / 6th August – 1940’s Weekend



    This is a time when Peak Rail takes a journey down memory lane and turns the clock back to the days of ration books, blackouts, make do and mend, holidays at home to show the public an insight into how civilians and troops survived during wartime Britain.

    Our Rowsley Station site is transformed into a hive of activity that reflects the conditions of that era. Home Front displays with an original Anderson Shelter.

    Late afternoon on both days will see a battle between Allied and German forces, feel the tension and chaos of the battlefield when the Allies and the enemy forces meet using armoured vehicles and explosives.

    Live entertainment throughout the day including Paul and Natasha Harper, the Ashby Big Band, together with other guests. Saturday only: Display of Apulacian dancing by “Lahdidah” in the picnic area.

    Normal timetable and special fares .
     

    Privici:

    • image.jpeg
      image.jpeg
      Veličina datoteke:
      1.7 MB
      Pregleda:
      126
  5. kestreleyes

    kestreleyes Well-Known Member

    Pridružen(a):
    4. Listopad 2007.
    Poruka:
    1,313
    Lajkova:
    936
    Interesi:
    signal engineer
    image.jpeg image.jpeg image.jpeg image.jpeg Small update this week, managed to do more painting on church lane box and some tree lopping work for signal sighting but the pics this time are off Ben and the LMSCAs hard work on new poster boards ,benches and sign work at Darley Dale.
     
    Copper-capped and cct man like this.
  6. daveannjon

    daveannjon Well-Known Member

    Pridružen(a):
    31. Ožujak 2006.
    Poruka:
    1,114
    Lajkova:
    425
    Grad:
    Waiting for the Right Away
    Also the bracketed lamps on the building :)

    Dave
     
  7. Mick Bond

    Mick Bond New Member

    Pridružen(a):
    6. Veljača 2016.
    Poruka:
    17
    Lajkova:
    1
    Spol:
    Muškarac
    Grad:
    Sheffield
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I've received a query about the start of the extension from Darley Dale to Rowsley South. The share issue 'Northwards to Northwood' was launched on 17th October 1992. The crossing at Church Lane was put in place 3-6 March 1993 and by that stage clearance work at Rowsley was already well underway. Could anyone give me an 'official date' for the start of work to put into the chronology of events?

    Thanks

    Mick Bond
    Archivist
     
  8. Woodster21

    Woodster21 Member

    Pridružen(a):
    4. Veljača 2007.
    Poruka:
    461
    Lajkova:
    50
    Grad:
    Derbyshire
    What's happening to the Station Road Level Crossing?
     
  9. kestreleyes

    kestreleyes Well-Known Member

    Pridružen(a):
    4. Listopad 2007.
    Poruka:
    1,313
    Lajkova:
    936
    Interesi:
    signal engineer
    image.jpeg image.jpeg image.jpeg image.jpeg image.jpeg image.jpeg image.jpeg Woodster, the level crossing is in the process of having the up line relaid with new running rails,check rails,chairs and fittings, two new closure rails on the south side have also been fitted, a good turnout over the last few days with around fifteen folks involved in the works,even in the torrential downpours and sunshine of yesterday, the old concrete bed and timbers are in remarkably good condition protected by the Tarmac over the last twenty or so years and we've also fitted some drainage pipes too which weren't there originally, the old rails had wear on them where they met the chairs, the check rail bolts had also worn away under the road and some of the spacing blocks were different sizes and have been replaced with the correct ones.

    Contractors removed the old Tarmac on Thursday evening with some of the gang and will relay the Tarmac on Monday, a road management company have dealt with signage and such as that's beyond our jurisdiction outside the crossing gates.

    Tommorow is finishing off work,boxing in and removing the old rails and timbers from the signalbox base while the crane is on site.
     
    Copper-capped, Woodster21 i philw2 se sviđa ovo.
  10. Woodster21

    Woodster21 Member

    Pridružen(a):
    4. Veljača 2007.
    Poruka:
    461
    Lajkova:
    50
    Grad:
    Derbyshire
    I helped put the crossing in all those years ago! When it was installed we did all the signage - how times have changed

    Thanks
     
  11. Nick Gough

    Nick Gough Well-Known Member

    Pridružen(a):
    4. Veljača 2006.
    Poruka:
    1,435
    Lajkova:
    344
    Grad:
    Northamptonshire
    Strange to be doing this on a peak summer weekend rather than in autumn or winter?

    We were booked to travel yesterday morning as part of a long weekend break, however arrived at our hotel on Thursday to find out the railway is closed. That was forty fares lost to the line.:(
     
  12. GWR Man.

    GWR Man. Well-Known Member

    Pridružen(a):
    8. Listopad 2014.
    Poruka:
    2,259
    Lajkova:
    2,695
    Spol:
    Muškarac
    Grad:
    Taunton
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    See http://www.orr.gov.uk/rail/publicat.../improvement-notices/improvement-notices-2017 With a compliance date set for form 27 May to August 31 2017 so it had to be done by August 31 otherwise the railway will be in bigger problems from ORR.
     
    tilling se sviđa ovo.
  13. kestreleyes

    kestreleyes Well-Known Member

    Pridružen(a):
    4. Listopad 2007.
    Poruka:
    1,313
    Lajkova:
    936
    Interesi:
    signal engineer

    Sorry about that but as stated the work had to be done, there's always the item that any venue anywhere in the country could be closed upon arrival, though it would have been nice to accommodate your visit.

    Out of curiosity do you mean forty pounds or forty fares? Great difference between the two, the latter being a large party which should have been prior notified of the works?
     
  14. Nick Gough

    Nick Gough Well-Known Member

    Pridružen(a):
    4. Veljača 2006.
    Poruka:
    1,435
    Lajkova:
    344
    Grad:
    Northamptonshire
    Thanks for the info.
    It is a tour group of forty.
    I don't know when the tour company were informed but we received a detailed itinerary from them the previous week, still including Peak Rail, and weren't told otherwise until we arrived. We were given the impression that they had only just found out.
    We'll just have to make a visit sometime in the future.
     
  15. Woodster21

    Woodster21 Member

    Pridružen(a):
    4. Veljača 2007.
    Poruka:
    461
    Lajkova:
    50
    Grad:
    Derbyshire
    Why couldn't single line working be undertaken through Darley Dale Station?
     
  16. kestreleyes

    kestreleyes Well-Known Member

    Pridružen(a):
    4. Listopad 2007.
    Poruka:
    1,313
    Lajkova:
    936
    Interesi:
    signal engineer

    Many thanks for the reply, indeed a large tour, il check with the office but word went out to the volunteers involved about three weeks ago,at least the first I heard, so it could be in the chain of things between the railway and the tour company the word didn't get round quick enough, that said it would be nice to see your party in the future, the work to replace the crossing was completed today, albeit the tarmaccing to be completed tommorow by the contractors, Stuart Graves has taken some pictures for the update attached, at some point the down side of the crossing will be renewed but at least now we know what needs doing having seen how the up side works went ahead.

    image.jpeg image.jpeg
     
    Nick Gough and ilvaporista like this.
  17. kestreleyes

    kestreleyes Well-Known Member

    Pridružen(a):
    4. Listopad 2007.
    Poruka:
    1,313
    Lajkova:
    936
    Interesi:
    signal engineer
    Final shot of the crossing having been retarmacced and the white line guys doing their thing ,thanks to Rob Sanders for the pics
     

    Privici:

    • image.jpeg
      image.jpeg
      Veličina datoteke:
      783.9 KB
      Pregleda:
      90
    • image.jpeg
      image.jpeg
      Veličina datoteke:
      914 KB
      Pregleda:
      88
    ilvaporista and Copper-capped like this.
  18. Steve

    Steve Resident of Nat Pres Friend

    Pridružen(a):
    7. Listopad 2006.
    Poruka:
    12,729
    Lajkova:
    11,847
    Interesi:
    Gentleman of leisure, nowadays
    Grad:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I'm not a civil engineer but is tarmac-ing over sleepered and ballasted track a sensible idea in the long term?
     
  19. Richard Pike

    Richard Pike New Member

    Pridružen(a):
    17. Svibanj 2014.
    Poruka:
    111
    Lajkova:
    33
    Spol:
    Muškarac
    Interesi:
    Electronics Engineer
    Grad:
    Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I would have thought that concrete sleepers would have been better than timber long term. But I'm not a civil engineer either.
     
  20. Steve

    Steve Resident of Nat Pres Friend

    Pridružen(a):
    7. Listopad 2006.
    Poruka:
    12,729
    Lajkova:
    11,847
    Interesi:
    Gentleman of leisure, nowadays
    Grad:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I was thinking more along the lines (sorry!) that sleepers on ballast is a resilient road and will move slightly under load.
     