    I would hope that planning permission is but a formality, given the £1 million contribution from the Leicester and Leicestershire Enterprise Partnership and then the purchase of shares by Leicestershire County Council.

    Yes, the update in Main Line will be first article I'll read as soon as it arrives!
     
  2. pmh_74

    pmh_74 Part of the furniture

    注册日期:
    2009-01-28
    帖子:
    2,423
    支持:
    1,707
    Main Line is reportedly delayed until mid September. Not sure why.

    (Maybe because I submitted my article late! Hope not!)
     
  3. David R

    David R Well-Known Member

    注册日期:
    2013-07-30
    帖子:
    1,019
    支持:
    1,390
    性别:
    所在地:
    Surrey
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    And in the picture looking South over the new Abutments doesn't the GCR engine shed look tantalisingly close

    David R
     
  4. oddsocks

    oddsocks Well-Known Member

    注册日期:
    2009-11-22
    帖子:
    1,813
    支持:
    289
    性别:
    职业:
    Retired / Dodging a Coffin for as long as I can.
    所在地:
    Half a mile east of Snells Nook Halt. (1883-1931)
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Waiting for photos of the Bridge Span being craned into place perhaps???????
     
    已获得Black Jim的支持.
  5. AndyY

    AndyY Member

    注册日期:
    2013-02-23
    帖子:
    433
    支持:
    480
    I'd rather get it as soon as possible, I find it to be the best read of the magazines from the various preserved railways I am a member of.
     
    已获得J Rob't HarrisonTommyD的支持.
  6. GWR Man.

    GWR Man. Well-Known Member

    注册日期:
    2014-10-08
    帖子:
    2,259
    支持:
    2,695
    性别:
    所在地:
    Taunton
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The crane for putting the bridge section in place is arriving on site, and is been built ready for the lift most likely in September and will be done over night when the MR line can be shut. http://www.gcrailway.co.uk/unify/
     
    已获得Black Jimjnc的支持.
  7. ilvaporista

    ilvaporista Part of the furniture

    注册日期:
    2006-01-16
    帖子:
    4,356
    支持:
    5,455
    性别:
    职业:
    C.Eng
    所在地:
    On the 45th!
    The companies that hire out these cranes are not usually known for being charitable as each day is about the same cost as a large family car. So it's in their interest to get the job done quickly. Be prepared to be surprised.
     
    已获得Black Jim的支持.
  8. mogulb

    mogulb New Member

    注册日期:
    2010-12-20
    帖子:
    133
    支持:
    95
    Main bridge bearer beams were craned into position earlier this morning during a MML possession. It will be interesting to see wether the crane stays or is dismantled and returns in September.
     
    已获得J Rob't HarrisonAndyYMartin Perry的支持.
  9. AndyY

    AndyY Member

    注册日期:
    2013-02-23
    帖子:
    433
    支持:
    480
    Moderators - isn't it about time those nay-sayers question marks were deleted from this thread title?

    Andy
     
    已获得J Rob't Harrison的支持.
  10. Raimondo

    Raimondo New Member

    注册日期:
    2005-10-24
    帖子:
    135
    支持:
    116
    Hope it's OK to post an image taken from the GCR Facebook group this morning, showing the bearer beams being swung into place last night, during the MML possession. Credit to the original photographer for the excellent image. At the GCR AGM it was announced that the bridge span would be put in place weekend of 2/3 Sept ( ie next weekend) if all went well.
     

    附件文件:

    已获得Black Jim, toplight, frazoulaswak另外5人的支持.
  11. Pete Thornhill

    Pete Thornhill Resident of Nat Pres Staff Member Administrator Moderator Friend

    注册日期:
    2008-07-24
    帖子:
    7,763
    支持:
    5,890
    Have done it as I noticed this post by chance as the Moderators don't have chance to read every post on the forum. If you use the report button then that will give us an alert meaning we won't possibly missing any requests.
     
  12. J Rob't Harrison

    J Rob't Harrison Member

    注册日期:
    2016-11-06
    帖子:
    240
    支持:
    360
    性别:
    所在地:
    Stafford
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Beautiful shot. I'd heard rumours about when the bridge span was going in, but nothing official. Thanks for the report that it should (fingers crossed!) go in next weekend.... it's only been six weeks since the first concrete blocks turned up on site! Never expected it to go up that quickly.
     
    已获得Black Jim的支持.
  13. AndyY

    AndyY Member

    注册日期:
    2013-02-23
    帖子:
    433
    支持:
    480
    It's going really well. (Thanks for removing the question marks, no-one can question that it will happen!)

    Andy
     
  14. J Rob't Harrison

    J Rob't Harrison Member

    注册日期:
    2016-11-06
    帖子:
    240
    支持:
    360
    性别:
    所在地:
    Stafford
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Well, we've gone a bit beyond the point of turning back now, the bridge going in (a magnificent achievement in itself) is surely going to give added impetus to the rest of the project.
     
    已获得David RThe Dainton Bankerjnc的支持.
  15. Johann Marsbar

    Johann Marsbar Well-Known Member

    注册日期:
    2016-02-21
    帖子:
    1,669
    支持:
    2,180
    性别:
    所在地:
    Suffolk
    Heritage Railway Volunteer:
    No I do not currently volunteer
    They do appear to have dropped the proposal of giving advance publicity to when the installation will take place though, which was mentioned in various editions of Main Line - i.e. - "it will be quite a spectacle and there will be opportunities to come and watch".
    Will be interesting to see if they do get round to quoting a date on their website before it happens.......
     
  16. seawright

    seawright New Member

    注册日期:
    2012-09-30
    帖子:
    169
    支持:
    26
    What is the state of the bridge over the canal? Is it just a case of re-laying the track or is there other work required?
     
  17. mogulb

    mogulb New Member

    注册日期:
    2010-12-20
    帖子:
    133
    支持:
    95
    The canal bridge is in place but needs a fair amount of work, but considering it has had little or no maintenance for 50 odd years is not in bad condition.

    The date for the bridge over the MML installation has still not officially been announced, there is a lot of speculation that it will be next a Sunday morning early. Still need the bridge components to be delivered.
     
    已获得seawright的支持.
  18. John Webb

    John Webb Member

    注册日期:
    2010-03-02
    帖子:
    501
    支持:
    86
    职业:
    Retired
    所在地:
    St Albans, Herts
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    已获得Black JimJ Rob't Harrisonjnc的支持.
  19. mogulb

    mogulb New Member

    注册日期:
    2010-12-20
    帖子:
    133
    支持:
    95
    Press release by the GCR advises that the bridge deck will be craned into place on the night of Sat 02 Sept and early Sun 03 Sept!
     
    已获得jnc, Kinghambranch, toplight另外1人的支持.
  20. class8mikado

    class8mikado Part of the furniture

    注册日期:
    2009-06-01
    帖子:
    3,840
    支持:
    1,644
    职业:
    Print Estimator/ Repository of Useless Informatio.
    所在地:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Once the connection is made is there ' a plan' for the northern end either terms of infrastructure or operation to receive trains from the GCR south /?>
     