  1. AndyY

    AndyY Member

    إنضم إلينا في:
    ‏23 فبراير 2013
    المشاركات:
    433
    عدد المعجبين:
    480
    I would hope that planning permission is but a formality, given the £1 million contribution from the Leicester and Leicestershire Enterprise Partnership and then the purchase of shares by Leicestershire County Council.

    Yes, the update in Main Line will be first article I'll read as soon as it arrives!
     
  2. pmh_74

    pmh_74 Part of the furniture

    إنضم إلينا في:
    ‏28 يناير 2009
    المشاركات:
    2,467
    عدد المعجبين:
    1,773
    Main Line is reportedly delayed until mid September. Not sure why.

    (Maybe because I submitted my article late! Hope not!)
     
  3. David R

    David R Well-Known Member

    إنضم إلينا في:
    ‏30 جويلية 2013
    المشاركات:
    1,020
    عدد المعجبين:
    1,391
    الجنس:
    ذكر
    مكان الإقامة:
    Surrey
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    And in the picture looking South over the new Abutments doesn't the GCR engine shed look tantalisingly close

    David R
     
  4. oddsocks

    oddsocks Well-Known Member

    إنضم إلينا في:
    ‏22 نوفمبر 2009
    المشاركات:
    1,813
    عدد المعجبين:
    289
    الجنس:
    ذكر
    الوظيفة:
    Retired / Dodging a Coffin for as long as I can.
    مكان الإقامة:
    Half a mile east of Snells Nook Halt. (1883-1931)
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Waiting for photos of the Bridge Span being craned into place perhaps???????
     
    أعجب بهذه المشاركة Black Jim
  5. AndyY

    AndyY Member

    إنضم إلينا في:
    ‏23 فبراير 2013
    المشاركات:
    433
    عدد المعجبين:
    480
    I'd rather get it as soon as possible, I find it to be the best read of the magazines from the various preserved railways I am a member of.
     
    J Rob't Harrison و TommyD معجبون بهذا.
  6. GWR Man.

    GWR Man. Well-Known Member

    إنضم إلينا في:
    ‏8 اكتوبر 2014
    المشاركات:
    2,273
    عدد المعجبين:
    2,772
    الجنس:
    ذكر
    مكان الإقامة:
    Taunton
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The crane for putting the bridge section in place is arriving on site, and is been built ready for the lift most likely in September and will be done over night when the MR line can be shut. http://www.gcrailway.co.uk/unify/
     
    Black Jim و jnc معجبون بهذا.
  7. ilvaporista

    ilvaporista Part of the furniture

    إنضم إلينا في:
    ‏16 يناير 2006
    المشاركات:
    4,356
    عدد المعجبين:
    5,456
    الجنس:
    ذكر
    الوظيفة:
    C.Eng
    مكان الإقامة:
    On the 45th!
    The companies that hire out these cranes are not usually known for being charitable as each day is about the same cost as a large family car. So it's in their interest to get the job done quickly. Be prepared to be surprised.
     
    أعجب بهذه المشاركة Black Jim
  8. mogulb

    mogulb New Member

    إنضم إلينا في:
    ‏20 ديسمبر 2010
    المشاركات:
    133
    عدد المعجبين:
    95
    Main bridge bearer beams were craned into position earlier this morning during a MML possession. It will be interesting to see wether the crane stays or is dismantled and returns in September.
     
    J Rob't Harrison, AndyY و Martin Perry معجبون بهذا.
  9. AndyY

    AndyY Member

    إنضم إلينا في:
    ‏23 فبراير 2013
    المشاركات:
    433
    عدد المعجبين:
    480
    Moderators - isn't it about time those nay-sayers question marks were deleted from this thread title?

    Andy
     
    أعجب بهذه المشاركة J Rob't Harrison
  10. Raimondo

    Raimondo New Member

    إنضم إلينا في:
    ‏24 اكتوبر 2005
    المشاركات:
    135
    عدد المعجبين:
    116
    Hope it's OK to post an image taken from the GCR Facebook group this morning, showing the bearer beams being swung into place last night, during the MML possession. Credit to the original photographer for the excellent image. At the GCR AGM it was announced that the bridge span would be put in place weekend of 2/3 Sept ( ie next weekend) if all went well.
     

    الملفات المرفقة:

    Black Jim, toplight, frazoulaswak و 5 آخرون معجبون بهذا.
  11. Pete Thornhill

    Pete Thornhill Resident of Nat Pres Staff Member Administrator Moderator Friend

    إنضم إلينا في:
    ‏24 جويلية 2008
    المشاركات:
    7,850
    عدد المعجبين:
    6,095
    Have done it as I noticed this post by chance as the Moderators don't have chance to read every post on the forum. If you use the report button then that will give us an alert meaning we won't possibly missing any requests.
     
  12. J Rob't Harrison

    J Rob't Harrison Member

    إنضم إلينا في:
    ‏6 نوفمبر 2016
    المشاركات:
    245
    عدد المعجبين:
    375
    الجنس:
    ذكر
    مكان الإقامة:
    Stafford
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Beautiful shot. I'd heard rumours about when the bridge span was going in, but nothing official. Thanks for the report that it should (fingers crossed!) go in next weekend.... it's only been six weeks since the first concrete blocks turned up on site! Never expected it to go up that quickly.
     
    أعجب بهذه المشاركة Black Jim
  13. AndyY

    AndyY Member

    إنضم إلينا في:
    ‏23 فبراير 2013
    المشاركات:
    433
    عدد المعجبين:
    480
    It's going really well. (Thanks for removing the question marks, no-one can question that it will happen!)

    Andy
     
  14. J Rob't Harrison

    J Rob't Harrison Member

    إنضم إلينا في:
    ‏6 نوفمبر 2016
    المشاركات:
    245
    عدد المعجبين:
    375
    الجنس:
    ذكر
    مكان الإقامة:
    Stafford
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Well, we've gone a bit beyond the point of turning back now, the bridge going in (a magnificent achievement in itself) is surely going to give added impetus to the rest of the project.
     
    David R, The Dainton Banker و jnc معجبون بهذا.
  15. Johann Marsbar

    Johann Marsbar Well-Known Member

    إنضم إلينا في:
    ‏21 فبراير 2016
    المشاركات:
    1,676
    عدد المعجبين:
    2,211
    الجنس:
    ذكر
    مكان الإقامة:
    Suffolk
    Heritage Railway Volunteer:
    No I do not currently volunteer
    They do appear to have dropped the proposal of giving advance publicity to when the installation will take place though, which was mentioned in various editions of Main Line - i.e. - "it will be quite a spectacle and there will be opportunities to come and watch".
    Will be interesting to see if they do get round to quoting a date on their website before it happens.......
     
  16. seawright

    seawright New Member

    إنضم إلينا في:
    ‏30 سبتمبر 2012
    المشاركات:
    169
    عدد المعجبين:
    26
    What is the state of the bridge over the canal? Is it just a case of re-laying the track or is there other work required?
     
  17. mogulb

    mogulb New Member

    إنضم إلينا في:
    ‏20 ديسمبر 2010
    المشاركات:
    133
    عدد المعجبين:
    95
    The canal bridge is in place but needs a fair amount of work, but considering it has had little or no maintenance for 50 odd years is not in bad condition.

    The date for the bridge over the MML installation has still not officially been announced, there is a lot of speculation that it will be next a Sunday morning early. Still need the bridge components to be delivered.
     
    أعجب بهذه المشاركة seawright
  18. John Webb

    John Webb Member

    إنضم إلينا في:
    ‏2 مارس 2010
    المشاركات:
    501
    عدد المعجبين:
    86
    الوظيفة:
    Retired
    مكان الإقامة:
    St Albans, Herts
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Black Jim, J Rob't Harrison و jnc معجبون بهذا.
  19. mogulb

    mogulb New Member

    إنضم إلينا في:
    ‏20 ديسمبر 2010
    المشاركات:
    133
    عدد المعجبين:
    95
    Press release by the GCR advises that the bridge deck will be craned into place on the night of Sat 02 Sept and early Sun 03 Sept!
     
    jnc, Kinghambranch, toplight و 1 شخص آخر معجبون بهذا.
  20. class8mikado

    class8mikado Part of the furniture

    إنضم إلينا في:
    ‏1 جوان 2009
    المشاركات:
    3,881
    عدد المعجبين:
    1,667
    الوظيفة:
    Print Estimator/ Repository of Useless Informatio.
    مكان الإقامة:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Once the connection is made is there ' a plan' for the northern end either terms of infrastructure or operation to receive trains from the GCR south /?>
     