If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Bridge that Gap: Great Central Railway News

本贴由 Gav1062010-05-08 发布. 版块名称: Heritage Railways & Centres in the UK

  1. steamdream

    steamdream Member

    注册日期:
    2011-05-05
    帖子:
    285
    支持:
    15
    职业:
    Teacher
    所在地:
    Avranches(france)
    I hope the Gap will be closed circa 2050...:D
     
    已获得Black Jim的支持.
  2. AndyY

    AndyY Member

    注册日期:
    2013-02-23
    帖子:
    433
    支持:
    480
    I do sincerely hope well before then, I don't think I'll make it to 99 years old!
     
  3. J Rob't Harrison

    J Rob't Harrison Member

    注册日期:
    2016-11-06
    帖子:
    240
    支持:
    360
    性别:
    所在地:
    Stafford
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thanks for the info (I too rely on the Bridging the Gap website for updates.....) I'm surprised this wasn't in the issue of Mainline that landed on my doormat last week, I can't be alone in wondering what's next after the MML bridge is completed. Still, next Autumn- that gives them a bit of a breather I suppose to replenish the funds before pressing on.
     
  4. Johann Marsbar

    Johann Marsbar Well-Known Member

    注册日期:
    2016-02-21
    帖子:
    1,669
    支持:
    2,180
    性别:
    所在地:
    Suffolk
    Heritage Railway Volunteer:
    No I do not currently volunteer
    There's still a lot to do with the MML bridge - decking to be added + all the other things that will presumably be needed before it is deemed "finished" - like building the engineers blue brickwork "cladding" around the two concrete piers.
    There was some talk in a MainLine earlier this year regarding experimenting with possible embankment construction methods on the section between GCR(N) and the MML bridge, so they might still be thinking of doing that in the meantime.
    At least an identifiable structure to restore in the form of the canal bridge gives another target to achieve for a fundraising drive - and, at the end of the day, the whole link is only going to be completed when the money is to hand to complete the job. Would be interesting to know if there is likely to be any further funding from Public/Government bodies towards the whole scheme at some stage in the future.
     
    已获得Black Jimjnc的支持.
  5. Tuska

    Tuska New Member

    注册日期:
    2012-08-29
    帖子:
    191
    支持:
    96
    I will definitely have to make the effort to free myself from my job and manager's clutches for a day and visit when its completed. This is incredible work.
     
  6. AndyY

    AndyY Member

    注册日期:
    2013-02-23
    帖子:
    433
    支持:
    480
    Has anyone got any updates on whether the bridge decks are now in place? It's gone very quiet both here and on the various GCR Facebook pages
     
  7. tor-cyan

    tor-cyan Well-Known Member

    注册日期:
    2008-03-28
    帖子:
    1,269
    支持:
    1,658
    性别:
    traveled under the bridge a couple of times last week no decking fitted yet. work seems to be concentrating on the 2 support structures a cement mixer was in use on top of the north side concrete pillar on tuesday

    Colin
     
    已获得Kinghambranch的支持.
  8. J Rob't Harrison

    J Rob't Harrison Member

    注册日期:
    2016-11-06
    帖子:
    240
    支持:
    360
    性别:
    所在地:
    Stafford
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I caught a quick glance at it tarvelling to/ from Loughborough for the Gala this weekend. Looked as though there were three or four deck panels in place, working from the centre out. I also saw a post on facebook yesterday that two more deck panels were fitted on Saturday night.
     
    已获得Black Jim, The Dainton Banker, jnc另外2人的支持.
  9. Tuska

    Tuska New Member

    注册日期:
    2012-08-29
    帖子:
    191
    支持:
    96
    It does beg the question. For restoring railway routes and lost links, is it cheaper to reinstate existing bridge structures, or replace them with modern ones?
     
  10. tor-cyan

    tor-cyan Well-Known Member

    注册日期:
    2008-03-28
    帖子:
    1,269
    支持:
    1,658
    性别:
    not sure I understand the question? to reinstate existing bridge structures Not sure how you reinstate something already existing
    maybe refurbish or repair?

    Colin
     
  11. AndyY

    AndyY Member

    注册日期:
    2013-02-23
    帖子:
    433
    支持:
    480
    I don't see that there can be a general answer - it all depends on what is there and its condition. Every example will be different and must be assessed accordingly.

    Andy
     
    已获得Black JimMark ThompsonJ Rob't Harrison的支持.
  12. Sawdust

    Sawdust Member

    注册日期:
    2015-07-18
    帖子:
    508
    支持:
    884
    性别:
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    In this example the bridge over the MML is missing so has to be new but the bridge over the canal is there and going to be refurbished. But as has already been stated every case will be unique.

    Sawdust.
     
  13. AndyY

    AndyY Member

    注册日期:
    2013-02-23
    帖子:
    433
    支持:
    480
    I'm not a bridge engineer, so maybe speaking out of turn, but I'm surprised that putting the decks in seems to be difficult. I would have thought the bridge would have been trial-assembled at the builders, so once the beams were craned it would have been quick and simple to assemble the rest. Any thoughts?

    Andy
     
  14. ilvaporista

    ilvaporista Part of the furniture

    注册日期:
    2006-01-16
    帖子:
    4,356
    支持:
    5,455
    性别:
    职业:
    C.Eng
    所在地:
    On the 45th!
    It's not the actual time to put in the deck it's what it goes over. I am assuming that this can only be done during a possession of the MML which means limited working hours and usually in the middle of the night.
     
  15. AndyY

    AndyY Member

    注册日期:
    2013-02-23
    帖子:
    433
    支持:
    480
    According to one of the GCR Facebook groups, they been 'offering up' a section, finding it doesn't fit, and then trying it somewhere else! Maybe they simply forgot to paint numbers 1 to 7 on the decks so it was obvious what order they fit in...............
     
    已获得Black Jim的支持.
  16. pmh_74

    pmh_74 Part of the furniture

    注册日期:
    2009-01-28
    帖子:
    2,423
    支持:
    1,707
    That's a FB post from someone who was thrown out of one of the other GC FB groups so how informed is that comment? (Note, I have no idea, by the way.)


    Sent from my iPhone using Tapatalk
     
    已获得Black Jim的支持.
  17. AndyY

    AndyY Member

    注册日期:
    2013-02-23
    帖子:
    433
    支持:
    480
    No idea how informed, although I assume he must have been watching to get the photos!
     
  18. Tuska

    Tuska New Member

    注册日期:
    2012-08-29
    帖子:
    191
    支持:
    96
    Bridges are ridiculously expensive, from what I can gather to refurbish than to replace. It set the Blaenavon boys and the council back between £162K and £323K just to get a mile in distance while retaining as much of the original structures as possible. The site's link the the development pages, explaining this in more detail, are all regrettably gone, but I think for one of them over a disused road to Big Pit... it still has the original deck, aesthetically speaking, but a massive girder was installed underneath, effectively meaning the bridge now has no clearance.

    (Baffles me as to why the Inspector thought it needed a 10mph speed restriction - that's as modern as you can get!)

    As I say, I think in this day and age, its cheaper to get contractors to just install a new construct... I wonder if GCR had the original bridges, not demolished, but were all derelict from no maintenance, if the project would have cost a million more or so...
     
  19. Bill Drewett

    Bill Drewett Member

    注册日期:
    2015-12-08
    帖子:
    277
    支持:
    845
    性别:
    所在地:
    Bristol
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    As people have said up thread, surely each case is different? I'm fairly sure repairing the viaduct at East Grinstead cost the Bluebell a lot less than replacement with a new one would have done.
     
  20. Tuska

    Tuska New Member

    注册日期:
    2012-08-29
    帖子:
    191
    支持:
    96
    No, I'm talking bridges, not full blown viaducts, god no.
     

分享此页面