If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

P2 Locomotive Company and related matters

الموضوع في 'Steam Traction' بواسطة class8mikado, بتاريخ ‏13 سبتمبر 2013.

  1. Kylchap

    Kylchap Member

    إنضم إلينا في:
    ‏15 ديسمبر 2015
    المشاركات:
    492
    عدد المعجبين:
    935
    الجنس:
    ذكر
    مكان الإقامة:
    East Anglia
    Heritage Railway Volunteer:
    No I do not currently volunteer
    A perfect symbol of the point where engineering excellence and aesthetics meet.
     
  2. 60017

    60017 Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏6 جويلية 2008
    المشاركات:
    9,103
    عدد المعجبين:
    8,072
    الجنس:
    ذكر
    الوظيفة:
    Retired from corporate slavery :o)
    مكان الإقامة:
    Fylde Coast
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Wow...impressive from any viewpoint.
     
  3. Ploughman

    Ploughman Part of the furniture

    إنضم إلينا في:
    ‏1 إبريل 2008
    المشاركات:
    5,969
    عدد المعجبين:
    2,761
    الوظيفة:
    Ex a lot of things.
    مكان الإقامة:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Nah, Cannot be a V4 must be a V3 as its a Tank.
     
    Sheff, Gav106, The Green Howards و 1 شخص آخر معجبون بهذا.
  4. 30854

    30854 Resident of Nat Pres

    إنضم إلينا في:
    ‏8 مارس 2017
    المشاركات:
    12,172
    عدد المعجبين:
    11,496
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Isn't it just..... and think how good a two throw crank to those impressive standards will look if the folks at SP ever get their paws on SECR D class No.737! :)
     
  5. Kylchap

    Kylchap Member

    إنضم إلينا في:
    ‏15 ديسمبر 2015
    المشاركات:
    492
    عدد المعجبين:
    935
    الجنس:
    ذكر
    مكان الإقامة:
    East Anglia
    Heritage Railway Volunteer:
    No I do not currently volunteer
    On the subject of built-up crank axles on locomotives . . .
    Are the axle components held in place only by interference fit after the metal cools, or is there anything additional to secure them, such as a dowel through each joint? Can anyone enlighten a non-engineer please?
     
    jnc و 30854 معجبون بهذا.
  6. LMS2968

    LMS2968 Part of the furniture

    إنضم إلينا في:
    ‏1 سبتمبر 2006
    المشاركات:
    3,072
    عدد المعجبين:
    5,361
    الجنس:
    ذكر
    الوظيفة:
    Lecturer retired: Archivist of Stanier Mogul Fund
    مكان الإقامة:
    Wigan
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Apart from a key to ensure alignment, there is no fastening otherthan shrinkage and the force of the hydraulic press.
     
    andrewshimmin, Bluenosejohn و 30854 معجبون بهذا.
  7. 30854

    30854 Resident of Nat Pres

    إنضم إلينا في:
    ‏8 مارس 2017
    المشاركات:
    12,172
    عدد المعجبين:
    11,496
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Can I "like" post #1465 in the light of response #1466, which I also "like"?
     
  8. Dag Bonnedal

    Dag Bonnedal New Member

    إنضم إلينا في:
    ‏28 مارس 2012
    المشاركات:
    184
    عدد المعجبين:
    317
    الجنس:
    ذكر
    مكان الإقامة:
    Stockholm, Sweden
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Usually you have keys to align and quarter the components shrunk onto an axle. But groves for these keys also significantly weakens the axle parts. As the P2:s had problems with fatigue cracks in the original design, I think the new company tries to make the new design as strong as possible, thus avoiding the key grooves. But I am not sure about this.
    From the (unfortunately too small) pictures of assembling the axle, I can't see any keys. Instead they use a laser beam to align the cranks.
    https://www.p2steam.com/2017/06/08/cranking-it-up/
     
    Last edited: ‏4 نوفمبر 2017
  9. Victor

    Victor Nat Pres stalwart Friend

    إنضم إلينا في:
    ‏20 أوت 2006
    المشاركات:
    14,526
    عدد المعجبين:
    9,197
    الوظيفة:
    Retired
    مكان الإقامة:
    DEWSBURY West Yorkshire
    Seeing engineering pictures like these beats the hell out of arguing about livery. Keep the pictures coming. Skilled men doing a highly skilled job.
     
    Romsey, jtx, jnc و 10 آخرون معجبون بهذا.
  10. PC5020

    PC5020 New Member

    إنضم إلينا في:
    ‏10 اكتوبر 2016
    المشاركات:
    52
    عدد المعجبين:
    42
    مكان الإقامة:
    Exeter
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Best post is ages....
     
  11. PC5020

    PC5020 New Member

    إنضم إلينا في:
    ‏10 اكتوبر 2016
    المشاركات:
    52
    عدد المعجبين:
    42
    مكان الإقامة:
    Exeter
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Pardon, that should be:
    Best post IN ages! :)
     
  12. S.A.C. Martin

    S.A.C. Martin Part of the furniture

    إنضم إلينا في:
    ‏31 أوت 2010
    المشاركات:
    5,615
    عدد المعجبين:
    9,418
    الجنس:
    ذكر
    الوظيفة:
    Asset Engineer (Signalling), MNLPS Treasurer
    مكان الإقامة:
    London
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The P2s crank design was shared with the A1s and A3s. Andrew Hardy did an excellent analysis in his book on the P2s. The problem was starting the trains, not running them. The mikado design put more weight and pressure on the crank axle, designed nominally for a Pacific.

    This was one of several problems the P2s had during the second world war, and was one of the reasons given for their rebuilding.
     
    أعجب بهذه المشاركة Kinghambranch
  13. Hermod

    Hermod Well-Known Member

    إنضم إلينا في:
    ‏6 ماي 2017
    المشاركات:
    1,109
    عدد المعجبين:
    317
    الجنس:
    ذكر
    مكان الإقامة:
    Klitmoeller,Denmark
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Bulleid must have been involved with P2 crank and did otherwise going south

     
    jnc و Bluenosejohn معجبون بهذا.
  14. W.Williams

    W.Williams Well-Known Member

    إنضم إلينا في:
    ‏20 ديسمبر 2015
    المشاركات:
    1,650
    عدد المعجبين:
    1,559
    الوظيفة:
    Mechanical Engineer
    مكان الإقامة:
    Aberdeenshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    You dont NEED a keyway, it just makes life easier for assembly.

    Eliminating it, parred with thickening and smoothing geometry, is the de rigeur way to improve the stress profile.

    Is the crank axle diameter the same as the old one? And the big end diameter?
     
  15. std tank

    std tank Part of the furniture

    إنضم إلينا في:
    ‏20 سبتمبر 2005
    المشاركات:
    3,927
    عدد المعجبين:
    1,070
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Liverpool
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Yes, but this P2 is fitted with roller bearings. Is the design the same as that on A1s 60153-57?
     
  16. Foxhunter

    Foxhunter Member

    إنضم إلينا في:
    ‏9 جوان 2011
    المشاركات:
    590
    عدد المعجبين:
    709
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Check the 'Design Study'page on the P2 WS for answers, the crank axle is at the bottom of the page https://www.p2steam.com/design-study/ - the crank axle has been increased in diameter and has a stress relief groove rolled into it, hopefully to avoid this:

    [​IMG]

    Foxy
     
    Haighie, W.Williams, Bluenosejohn و 2 آخرون معجبون بهذا.
  17. class8mikado

    class8mikado Part of the furniture

    إنضم إلينا في:
    ‏1 جوان 2009
    المشاركات:
    3,840
    عدد المعجبين:
    1,644
    الوظيفة:
    Print Estimator/ Repository of Useless Informatio.
    مكان الإقامة:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Seem to remember that the part of the axle into the roller bearing on 2007 (is that a journal)is a larger diameter than on Tornado ( which was presumably the same as the original A1) and is as large as the roller bearing company could allow without increasing the dimensions of the axlebox itself ( which would have required a change to frames, horns keeps etc).
     
  18. Kylchap

    Kylchap Member

    إنضم إلينا في:
    ‏15 ديسمبر 2015
    المشاركات:
    492
    عدد المعجبين:
    935
    الجنس:
    ذكر
    مكان الإقامة:
    East Anglia
    Heritage Railway Volunteer:
    No I do not currently volunteer
    If I remember correctly, David Elliott told me the stubs of the redesigned crank axle are 3/8" thicker where they pass through the roller bearings, compared to the original P2. As stated above, this is as large as they could go within the existing frame design.

    An extra 3/8" diameter must build in a lot more strength in this part of the axle. Can anybody calculate this?

    I also wanted to ask David the following question but never got the chance . . .

    Is a stronger crank axle likely to mean that a different component, such as little or big ends, will become the weakest link in the power train and therefore more prone to failure under high torque loads when starting?

    I'm sure A1SLT will have considered this, but I don't know if they've felt the need to upgrade other components. Any ideas?
     
    أعجب بهذه المشاركة jnc
  19. 8126

    8126 Member

    إنضم إلينا في:
    ‏17 مارس 2014
    المشاركات:
    831
    عدد المعجبين:
    976
    الجنس:
    ذكر
    I can calculate it if you know the original diameter. But basically, for a given allowed peak stress the load capacity of an axle in bending or in torsion is proportional to the diameter cubed.
     
  20. Kylchap

    Kylchap Member

    إنضم إلينا في:
    ‏15 ديسمبر 2015
    المشاركات:
    492
    عدد المعجبين:
    935
    الجنس:
    ذكر
    مكان الإقامة:
    East Anglia
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I understand that the original diameter was 9 5/8" and the new design is 10".
     

مشاركة هذه الصفحة