If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

5239 Goliath overhaul at ESR

الموضوع في 'Steam Traction' بواسطة pwsw5054, بتاريخ ‏16 أوت 2017.

  1. Steve82H

    Steve82H New Member

    إنضم إلينا في:
    ‏11 سبتمبر 2014
    المشاركات:
    20
    عدد المعجبين:
    88
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    With our resident locos up together, contract jobs give us projects which we all find interesting, gives us opportunities to increase our experience, build our skill set and develop a strong team. At the end of the project we normally run the engine in or use it for a short period meaning that our crews and visitors get the chance to experience something new. And as you say, it is a direct way of turning our volunteer labour into funds for the railway which it needs in order to develop and grow.

    I can honestly say that the attitude of all our staff is very positive about these projects.
     
    jnc, RLinkinS, Matt78 و 7 آخرون معجبون بهذا.
  2. pwsw5054

    pwsw5054 Member

    إنضم إلينا في:
    ‏5 يناير 2016
    المشاركات:
    411
    عدد المعجبين:
    1,284
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    All go on 5239 at the moment, tanks, bunker and cabroof lifted on Saturday and boiler and frames lifted today. Pictures on ESR Fbook page.

    Sent from my SM-A310F using Tapatalk
     
    Rumpole, Kinghambranch, Bluenosejohn و 2 آخرون معجبون بهذا.
  3. 32110

    32110 Member

    إنضم إلينا في:
    ‏20 ماي 2006
    المشاركات:
    649
    عدد المعجبين:
    794
    الجنس:
    ذكر
    الوظيفة:
    Retired from full time paid work
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Today the wheelsets were loaded onto transport to take them to the South Devon Railway Engineering company.

    5239 Wheels on their way to South Devon Railway Engineering.jpg
     
    gwalkeriow و paulhitch معجبون بهذا.
  4. James Ipswich

    James Ipswich New Member

    إنضم إلينا في:
    ‏6 مارس 2009
    المشاركات:
    67
    عدد المعجبين:
    13
    Excuse my ignorance on this, but curious. Doesn’t it cost more to bring the locomotive to you by rail for the wheelsets to go back down the road where they have come from (20 miles or so difference).
    How easy/or not would it be for them to come off at churston & reunited later.

    I’m sure this is factored in when you take the job on. Enjoying the updates 5239 the first engine I remember from my holidays in Devon when younger so taking interest in the overhaul.

    Thanks


    Sent from my iPhone using Tapatalk
     
  5. 32110

    32110 Member

    إنضم إلينا في:
    ‏20 ماي 2006
    المشاركات:
    649
    عدد المعجبين:
    794
    الجنس:
    ذكر
    الوظيفة:
    Retired from full time paid work
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The complete locomotive was delivered to ESR, Cranmore by road mid October. Since then we have done all the preparatory work and lifted the boiler from the frames and the frames from the wheels. It is being overhauled at Cranmore as a contract task for the Dartmouth Steam Railway. If the wheelsets were removed at Churston it would have been a very difficult task to transport the rest to Cranmore. Also we need them to take measurements to refurbish and refit the axleboxes, coupling rods and connecting rods. A photographic log can be found by following the link below:

    http://www.eastsomersetrailway.com/gallery.php?gid=333
     
    paulhitch و Bluenosejohn معجبون بهذا.
  6. James Ipswich

    James Ipswich New Member

    إنضم إلينا في:
    ‏6 مارس 2009
    المشاركات:
    67
    عدد المعجبين:
    13
    Thanks for taking the time to reply, as I said I’m sure there was a floor to my plan!


    Sent from my iPhone using Tapatalk
     
  7. pwsw5054

    pwsw5054 Member

    إنضم إلينا في:
    ‏5 يناير 2016
    المشاركات:
    411
    عدد المعجبين:
    1,284
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The mostly stripped frames of 5239 in the workshop at Cranmore. A start has also been made on the removal of tubes as this photo of the boiler shows. Both pictures taken yesterday.[​IMG][​IMG]

    Sent from my SM-A310F using Tapatalk
     
    Bluenosejohn, 240P15, GWR4707 و 2 آخرون معجبون بهذا.
  8. Reading General

    Reading General Part of the furniture

    إنضم إلينا في:
    ‏18 ماي 2011
    المشاركات:
    6,081
    عدد المعجبين:
    2,217
    is there a reason behind putting the number on the wrong side of the bufferbeam?

    Oh wait, that's the rear end I guess...
     
  9. Steve

    Steve Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏7 اكتوبر 2006
    المشاركات:
    12,729
    عدد المعجبين:
    11,847
    الوظيفة:
    Gentleman of leisure, nowadays
    مكان الإقامة:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    That seems a tad tight space to be undertaking an overhaul in!
     
  10. Steve82H

    Steve82H New Member

    إنضم إلينا في:
    ‏11 سبتمبر 2014
    المشاركات:
    20
    عدد المعجبين:
    88
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The frames and boiler will swap places soon. As you say, you can’t do much on the frames with that wall there but boiler work in that position is fine. The frames are that end ready for steam cleaning and shot blasting outside.
     
  11. pwsw5054

    pwsw5054 Member

    إنضم إلينا في:
    ‏5 يناير 2016
    المشاركات:
    411
    عدد المعجبين:
    1,284
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    4000sq ft according to the website

    Sent from my SM-A310F using Tapatalk
     
    أعجب بهذه المشاركة Southern Gricer
  12. pwsw5054

    pwsw5054 Member

    إنضم إلينا في:
    ‏5 يناير 2016
    المشاركات:
    411
    عدد المعجبين:
    1,284
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    More progress on 5239, a start has been made on the shotblasting of the frames. The rear bufferbeam and the dragbox have been completed so far and painted in primer. First picture shows the bufferbeam after being shot and the 2nd and 3rd show the painted sections.[​IMG][​IMG][​IMG]

    Sent from my SM-A310F using Tapatalk
     
    أعجب بهذه المشاركة Bluenosejohn
  13. pwsw5054

    pwsw5054 Member

    إنضم إلينا في:
    ‏5 يناير 2016
    المشاركات:
    411
    عدد المعجبين:
    1,284
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Please note the link provided earlier for photos no longer works due to a new ESR website. The new website can be found here https://eastsomersetrailway.com/

    Sent from my SM-A310F using Tapatalk
     
  14. cav1975

    cav1975 Member

    إنضم إلينا في:
    ‏24 سبتمبر 2009
    المشاركات:
    526
    عدد المعجبين:
    649
    Does this mean that the very nice archive of photographs of many ESR locos, etc., has been lost?
     
  15. pwsw5054

    pwsw5054 Member

    إنضم إلينا في:
    ‏5 يناير 2016
    المشاركات:
    411
    عدد المعجبين:
    1,284
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The gallery is being "reorganised", I'm not sure which photos will remain publicly available and which will no longer be.

    Sent from my SM-A310F using Tapatalk
     
  16. 32110

    32110 Member

    إنضم إلينا في:
    ‏20 ماي 2006
    المشاركات:
    649
    عدد المعجبين:
    794
    الجنس:
    ذكر
    الوظيفة:
    Retired from full time paid work
    Heritage Railway Volunteer:
    Yes I am an active volunteer
  17. Steve82H

    Steve82H New Member

    إنضم إلينا في:
    ‏11 سبتمبر 2014
    المشاركات:
    20
    عدد المعجبين:
    88
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    jnc, Greenway, pwsw5054 و 3 آخرون معجبون بهذا.
  18. pwsw5054

    pwsw5054 Member

    إنضم إلينا في:
    ‏5 يناير 2016
    المشاركات:
    411
    عدد المعجبين:
    1,284
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The wheelsets returned back from the South Devon Railway this week. 2 sets have been shotblasted and primed this weekend.[​IMG]

    Sent from my SM-A310F using Tapatalk
     
    banburysaint, Kinghambranch, Johnme101 و 2 آخرون معجبون بهذا.
  19. 5944

    5944 Resident of Nat Pres

    إنضم إلينا في:
    ‏14 يناير 2006
    المشاركات:
    8,863
    عدد المعجبين:
    9,265
    الجنس:
    ذكر
    الوظيفة:
    Train Maintainer for GTR at Hornsey
    مكان الإقامة:
    Letchworth
    Heritage Railway Volunteer:
    No I do not currently volunteer
  20. pwsw5054

    pwsw5054 Member

    إنضم إلينا في:
    ‏5 يناير 2016
    المشاركات:
    411
    عدد المعجبين:
    1,284
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Yep the 60007 support coach is at Cranmore for contract work in CTMS. Being kept at the shed until work starts later this year.

    Sent from my SM-A310F using Tapatalk
     

مشاركة هذه الصفحة