    For £850k, I would certainly hope so. Or is it £425,000 per additional barrier?
    But I can't help thinking that the SCC has better things to do with that kind of money.

    Edited - I stand somewhat corrected. It's worn out!
    Looks like it's staying single track, though.
    There's a better explanation here:

    http://democracy.somerset.gov.uk/documents/s5626/Appendix Bii.pdf
     
    Last edited: 12 jan 2018
  2. Robin Moira White

    Robin Moira White Resident of Nat Pres

    Lid geworden:
    27 apr 2014
    Berichten:
    11.411
    Leuk Bevonden:
    18.282
    Geslacht:
    Vrouw
    Beroep:
    Barrister
    Locatie:
    Stogumber
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    This forum is not the place to discuss the safety history of Seaward Way.

    It’s probably enough to note the considerable increase in both vehicle and pedestrian traffic since the present crossing was installed in the open fields approaching 30 years ago and the safety benefits of having full barriers.

    Robin
     
    Wenlock vindt dit leuk.
  3. mvpeters

    mvpeters Member

    Lid geworden:
    23 jun 2008
    Berichten:
    716
    Leuk Bevonden:
    838
    Geslacht:
    Man
    Beroep:
    Retired
    Locatie:
    Massachusetts, USA
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Noted - my post is edited.
     
  4. AnthonyTrains2017

    AnthonyTrains2017 Well-Known Member

    Lid geworden:
    28 sep 2014
    Berichten:
    2.237
    Leuk Bevonden:
    918
    Heritage Railway Volunteer:
    No I do not currently volunteer
    WSR is great again. Loving the 1940s weekend.
     
  5. michaelh

    michaelh Part of the furniture

    Lid geworden:
    29 apr 2006
    Berichten:
    3.080
    Leuk Bevonden:
    1.291
    Geslacht:
    Man
    Beroep:
    Very comfortably early retired
    Locatie:
    1029
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The SVR Fares page says:

    Reciprocal Travel Scheme

    On production of valid Staff Pass from a Railway in our Reciprocal Travel Scheme, you are are entitled to travel free of charge on days when normal fares apply only. On days where revised fares are in operation (Spring Steam Gala, Spring Diesel Festival, Step Back to the 1940s and Autumn Steam Gala only), you are entitled to travel at the SVR Child Rate.
     
  6. Mogul

    Mogul Member

    Lid geworden:
    2 feb 2016
    Berichten:
    324
    Leuk Bevonden:
    687
    Geslacht:
    Man
    Locatie:
    Dorset
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Interesting. Are these to be traditional style wooden gates that close across the track?
     
  7. See this SCC document for more details.

    Steve
     
    Yorkshireman vindt dit leuk.
  8. LC2

    LC2 Member

    Lid geworden:
    10 jun 2012
    Berichten:
    854
    Leuk Bevonden:
    1.023
    Beroep:
    IT
    Locatie:
    70B
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Why not a bridge then? As NR are ripping out crossings as often as they can.
    (And no, I have no idea how expensive a bridge is).
     
  9. Miff

    Miff Part of the furniture Friend

    Lid geworden:
    17 jun 2008
    Berichten:
    3.040
    Leuk Bevonden:
    3.119
    It would cost a lot more money; it would look awful; and you’d have to close the road for months to build it.
     
    Paul Kibbey en Yorkshireman vinden dit leuk.
  10. Mogul

    Mogul Member

    Lid geworden:
    2 feb 2016
    Berichten:
    324
    Leuk Bevonden:
    687
    Geslacht:
    Man
    Locatie:
    Dorset
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Its not specific but does refer to "The costs of the works are estimated at £850K, based on typical National Rail rates for a similar controlled crossing." and also to "...additional barriers (upgrading from two to four)..." and "One benefit of automatic crossings is short road closure period – typically less than 1.5 mins, and no necessity for any operation by railway staff."

    So this does appear to be a modern, new full barrier crossing. The new crossing for Norden on Swanage Railway had to meet the same new high standards. Similar figures were discussed. In the end we managed to bring the price down to just over £500K but that option is unlikely to be available to SCC.
    [​IMG]
     
    Sunnieboy en Yorkshireman vinden dit leuk.
  11. Bayard

    Bayard Well-Known Member

    Lid geworden:
    26 apr 2015
    Berichten:
    1.842
    Leuk Bevonden:
    3.904
    Geslacht:
    Man
    Heritage Railway Volunteer:
    No I do not currently volunteer
    From that document:

    d. Controlled crossings on the other hand are much safer in virtually all environments, but they require full barriers to totally enclose the crossing, and have to be so closed before any train is signalled to pass over the crossing. Typical road closure times are 2-4 minutes.

    Then why not go for a traditional, controlled crossing, then?
     
  12. The Man of Kent

    The Man of Kent New Member

    Lid geworden:
    19 nov 2017
    Berichten:
    174
    Leuk Bevonden:
    347
    Geslacht:
    Man
    Locatie:
    West Somerset
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Does anyone know (rather than "Can anyone speculate on") what happens if the barriers come down and a tailback car or a pedestrian gets trapped between the barriers?
     
  13. Miff

    Miff Part of the furniture Friend

    Lid geworden:
    17 jun 2008
    Berichten:
    3.040
    Leuk Bevonden:
    3.119
    I assume it will be a modern controlled crossing with full barriers, rather than the current automatic operation. However the SCC report does not say what the method of control will be.
     
  14. threelinkdave

    threelinkdave Well-Known Member

    Lid geworden:
    1 aug 2013
    Berichten:
    2.065
    Leuk Bevonden:
    1.240
    Geslacht:
    Man
    Beroep:
    Retired
    Locatie:
    Stratford-upon-Avon or in a brake KD to BH
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The standard NR upgrade is radar to detect any obstruction
     
  15. gwilialan

    gwilialan Well-Known Member

    Lid geworden:
    8 dec 2012
    Berichten:
    1.715
    Leuk Bevonden:
    4.010
    Geslacht:
    Man
    Locatie:
    Out there somewhere
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It's just the same in aviation - a simple example:- A common, everyday transistor = £0.50p . An identical one (same part number, specification, even date of manufacture) with one extra bit of paper for the aviation industry = £4.50. Once an organisation starts insisting that anything to be used has their specific approval mark or documents it's like a license to print money for the manufacturer. :(
     
  16. Greenway

    Greenway Part of the furniture

    Lid geworden:
    16 mrt 2008
    Berichten:
    4.021
    Leuk Bevonden:
    3.808
    Geslacht:
    Man
    Locatie:
    South Hams
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The SCC pdf states that there will be a 10 mph. rail clause allowing trains to stop if such a occasion occurs.
     
    Last edited: 13 jan 2018
    Paul Kibbey vindt dit leuk.
  17. gwilialan

    gwilialan Well-Known Member

    Lid geworden:
    8 dec 2012
    Berichten:
    1.715
    Leuk Bevonden:
    4.010
    Geslacht:
    Man
    Locatie:
    Out there somewhere
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Any ideas of the costs of routine maintenance (will probably have to be done by 'approved' engineers) or service contracts for call-outs in case of breakdowns etc?
     
  18. Yorkshireman

    Yorkshireman Part of the furniture

    Lid geworden:
    6 jul 2014
    Berichten:
    4.486
    Leuk Bevonden:
    5.045
    Geslacht:
    Man
    Beroep:
    Comfy chair occupant!
    Locatie:
    No moaners please!
    Heritage Railway Volunteer:
    No I do not currently volunteer
    That is SCC’s responsibility. I don’t see the relevance to this group as the WSR has no financial responsibility for it.
     
  19. The Man of Kent

    The Man of Kent New Member

    Lid geworden:
    19 nov 2017
    Berichten:
    174
    Leuk Bevonden:
    347
    Geslacht:
    Man
    Locatie:
    West Somerset
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Come to that then, why are we discussing the £850K?
     
    Paul Kibbey vindt dit leuk.
  20. Yorkshireman

    Yorkshireman Part of the furniture

    Lid geworden:
    6 jul 2014
    Berichten:
    4.486
    Leuk Bevonden:
    5.045
    Geslacht:
    Man
    Beroep:
    Comfy chair occupant!
    Locatie:
    No moaners please!
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Exactly!
     