If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

West Somerset Railway General Discussion

Discuție în 'Heritage Railways & Centres in the UK' creată de gwr4090, 15 Noi 2007.

  1. mvpeters

    mvpeters Member

    Înscris:
    23 Iun 2008
    Mesaje:
    716
    Aprecieri primite:
    838
    Sex:
    Masculin
    Ocupație:
    Retired
    Locație:
    Massachusetts, USA
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    For £850k, I would certainly hope so. Or is it £425,000 per additional barrier?
    But I can't help thinking that the SCC has better things to do with that kind of money.

    Edited - I stand somewhat corrected. It's worn out!
    Looks like it's staying single track, though.
    There's a better explanation here:

    http://democracy.somerset.gov.uk/documents/s5626/Appendix Bii.pdf
     
    Last edited: 12 Ian 2018
  2. Robin Moira White

    Robin Moira White Resident of Nat Pres

    Înscris:
    27 Apr 2014
    Mesaje:
    11.404
    Aprecieri primite:
    18.231
    Sex:
    Feminin
    Ocupație:
    Barrister
    Locație:
    Stogumber
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    This forum is not the place to discuss the safety history of Seaward Way.

    It’s probably enough to note the considerable increase in both vehicle and pedestrian traffic since the present crossing was installed in the open fields approaching 30 years ago and the safety benefits of having full barriers.

    Robin
     
    Wenlock apreciază asta.
  3. mvpeters

    mvpeters Member

    Înscris:
    23 Iun 2008
    Mesaje:
    716
    Aprecieri primite:
    838
    Sex:
    Masculin
    Ocupație:
    Retired
    Locație:
    Massachusetts, USA
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Noted - my post is edited.
     
  4. AnthonyTrains2017

    AnthonyTrains2017 Well-Known Member

    Înscris:
    28 Sep 2014
    Mesaje:
    2.237
    Aprecieri primite:
    918
    Heritage Railway Volunteer:
    No I do not currently volunteer
    WSR is great again. Loving the 1940s weekend.
     
  5. michaelh

    michaelh Part of the furniture

    Înscris:
    29 Apr 2006
    Mesaje:
    3.080
    Aprecieri primite:
    1.291
    Sex:
    Masculin
    Ocupație:
    Very comfortably early retired
    Locație:
    1029
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The SVR Fares page says:

    Reciprocal Travel Scheme

    On production of valid Staff Pass from a Railway in our Reciprocal Travel Scheme, you are are entitled to travel free of charge on days when normal fares apply only. On days where revised fares are in operation (Spring Steam Gala, Spring Diesel Festival, Step Back to the 1940s and Autumn Steam Gala only), you are entitled to travel at the SVR Child Rate.
     
  6. Mogul

    Mogul Member

    Înscris:
    2 Feb 2016
    Mesaje:
    324
    Aprecieri primite:
    687
    Sex:
    Masculin
    Locație:
    Dorset
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Interesting. Are these to be traditional style wooden gates that close across the track?
     
  7. See this SCC document for more details.

    Steve
     
    Yorkshireman apreciază asta.
  8. LC2

    LC2 Member

    Înscris:
    10 Iun 2012
    Mesaje:
    854
    Aprecieri primite:
    1.023
    Ocupație:
    IT
    Locație:
    70B
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Why not a bridge then? As NR are ripping out crossings as often as they can.
    (And no, I have no idea how expensive a bridge is).
     
  9. Miff

    Miff Part of the furniture Friend

    Înscris:
    17 Iun 2008
    Mesaje:
    3.004
    Aprecieri primite:
    3.024
    It would cost a lot more money; it would look awful; and you’d have to close the road for months to build it.
     
    Paul Kibbey și Yorkshireman apreciază asta.
  10. Mogul

    Mogul Member

    Înscris:
    2 Feb 2016
    Mesaje:
    324
    Aprecieri primite:
    687
    Sex:
    Masculin
    Locație:
    Dorset
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Its not specific but does refer to "The costs of the works are estimated at £850K, based on typical National Rail rates for a similar controlled crossing." and also to "...additional barriers (upgrading from two to four)..." and "One benefit of automatic crossings is short road closure period – typically less than 1.5 mins, and no necessity for any operation by railway staff."

    So this does appear to be a modern, new full barrier crossing. The new crossing for Norden on Swanage Railway had to meet the same new high standards. Similar figures were discussed. In the end we managed to bring the price down to just over £500K but that option is unlikely to be available to SCC.
    [​IMG]
     
    Sunnieboy și Yorkshireman apreciază asta.
  11. Bayard

    Bayard Well-Known Member

    Înscris:
    26 Apr 2015
    Mesaje:
    1.841
    Aprecieri primite:
    3.904
    Sex:
    Masculin
    Heritage Railway Volunteer:
    No I do not currently volunteer
    From that document:

    d. Controlled crossings on the other hand are much safer in virtually all environments, but they require full barriers to totally enclose the crossing, and have to be so closed before any train is signalled to pass over the crossing. Typical road closure times are 2-4 minutes.

    Then why not go for a traditional, controlled crossing, then?
     
  12. The Man of Kent

    The Man of Kent New Member

    Înscris:
    19 Noi 2017
    Mesaje:
    174
    Aprecieri primite:
    347
    Sex:
    Masculin
    Locație:
    West Somerset
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Does anyone know (rather than "Can anyone speculate on") what happens if the barriers come down and a tailback car or a pedestrian gets trapped between the barriers?
     
  13. Miff

    Miff Part of the furniture Friend

    Înscris:
    17 Iun 2008
    Mesaje:
    3.004
    Aprecieri primite:
    3.024
    I assume it will be a modern controlled crossing with full barriers, rather than the current automatic operation. However the SCC report does not say what the method of control will be.
     
  14. threelinkdave

    threelinkdave Well-Known Member

    Înscris:
    1 Aug 2013
    Mesaje:
    2.065
    Aprecieri primite:
    1.240
    Sex:
    Masculin
    Ocupație:
    Retired
    Locație:
    Stratford-upon-Avon or in a brake KD to BH
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The standard NR upgrade is radar to detect any obstruction
     
  15. gwilialan

    gwilialan Well-Known Member

    Înscris:
    8 Dec 2012
    Mesaje:
    1.706
    Aprecieri primite:
    3.988
    Sex:
    Masculin
    Locație:
    Out there somewhere
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It's just the same in aviation - a simple example:- A common, everyday transistor = £0.50p . An identical one (same part number, specification, even date of manufacture) with one extra bit of paper for the aviation industry = £4.50. Once an organisation starts insisting that anything to be used has their specific approval mark or documents it's like a license to print money for the manufacturer. :(
     
  16. Greenway

    Greenway Part of the furniture

    Înscris:
    16 Mar 2008
    Mesaje:
    4.019
    Aprecieri primite:
    3.804
    Sex:
    Masculin
    Locație:
    South Hams
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The SCC pdf states that there will be a 10 mph. rail clause allowing trains to stop if such a occasion occurs.
     
    Last edited: 13 Ian 2018
    Paul Kibbey apreciază asta.
  17. gwilialan

    gwilialan Well-Known Member

    Înscris:
    8 Dec 2012
    Mesaje:
    1.706
    Aprecieri primite:
    3.988
    Sex:
    Masculin
    Locație:
    Out there somewhere
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Any ideas of the costs of routine maintenance (will probably have to be done by 'approved' engineers) or service contracts for call-outs in case of breakdowns etc?
     
  18. Yorkshireman

    Yorkshireman Part of the furniture

    Înscris:
    6 Iul 2014
    Mesaje:
    4.486
    Aprecieri primite:
    5.045
    Sex:
    Masculin
    Ocupație:
    Comfy chair occupant!
    Locație:
    No moaners please!
    Heritage Railway Volunteer:
    No I do not currently volunteer
    That is SCC’s responsibility. I don’t see the relevance to this group as the WSR has no financial responsibility for it.
     
  19. The Man of Kent

    The Man of Kent New Member

    Înscris:
    19 Noi 2017
    Mesaje:
    174
    Aprecieri primite:
    347
    Sex:
    Masculin
    Locație:
    West Somerset
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Come to that then, why are we discussing the £850K?
     
    Paul Kibbey apreciază asta.
  20. Yorkshireman

    Yorkshireman Part of the furniture

    Înscris:
    6 Iul 2014
    Mesaje:
    4.486
    Aprecieri primite:
    5.045
    Sex:
    Masculin
    Ocupație:
    Comfy chair occupant!
    Locație:
    No moaners please!
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Exactly!
     
    West Somerset Wizard și Wenlock apreciază asta.

Distribuie pagina asta