West Somerset Railway General Discussion

Тема в разделе 'Heritage Railways & Centres in the UK', создана пользователем gwr4090, 15 ноя 2007.

  1. The Man of Kent

    The Man of Kent New Member

    Дата регистрации:
    19 ноя 2017
    Сообщения:
    174
    Симпатии:
    347
    Пол:
    Мужской
    Адрес:
    West Somerset
    Heritage Railway Volunteer:
    No I do not currently volunteer
    If the existing flashing red light (or a proper advanced starter) was manually operated from the box once the gates were down and the crossing seen to be clear then perhaps nothing else would need to change? Current rules allow trains to approach the crossing before the barriers are down. You would probably need a pole on which to hang the token hoop for collection by the outgoing crew so that the signalman doesn't have to be in two places at once. This would also allow shunters to return to the loco yard from the main platform and also perhaps from the bay without bringing the crossing into play. However as you can see from the webcam the signalman's view of the crossing is not perfect especially in poor visibility ..... CCTV? Maybe move the webcam to the back of the signal?
    This is pure speculation, interesting to see what actually happens.
     
  2. Dave Stapleton

    Dave Stapleton Member

    Дата регистрации:
    14 июл 2014
    Сообщения:
    388
    Симпатии:
    678
    Адрес:
    UK
    Heritage Railway Volunteer:
    No I do not currently volunteer
    A person opening and closing a set of traditional (Heritage?) crossing gates, as and when needed, seems such a simple and so much cheaper solutuion to all this technical stuff. Why has it all got so complicated?

    I'll get my coat... :rolleyes: :)
     
    tracker и Mogul нравится это.
  3. Forestpines

    Forestpines Well-Known Member

    Дата регистрации:
    5 июн 2009
    Сообщения:
    1.681
    Симпатии:
    2.438
    Пол:
    Женский
    Адрес:
    Somewhere in the UK
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Just build a gate box by the crossing! Until the 1960s there was one place on BR that had two level crossings about 60 yards apart, both with their own signalbox, so people can hardly claim there isn't a precedent! :)
     
    Dave Stapleton нравится это.
  4. Bayard

    Bayard Well-Known Member

    Дата регистрации:
    26 апр 2015
    Сообщения:
    1.841
    Симпатии:
    3.904
    Пол:
    Мужской
    Heritage Railway Volunteer:
    No I do not currently volunteer
    But here we are comparing controlled full barriers to gates, and, if "it's all about £££££s", then surely the WSR could erect a set of traditional gates for a lot less than £850,000, even allowing for the geological survey and whatnot.
    It seems that we are the victims of history here: I can remember when this crossing went in and the same questions were asked: why not have a traditional crossing? why can't we have a bridge, it would be so handy for photographers? ISTR that, in the end it came down to £££££s as usual, so we ended up with an AHB crossing. Now that the AHB is to be upgraded to a fully controlled crossing, the original arguments in favour of an AHB no longer hold water, but no-one seems prepared to go back and revisit them. The decision to go down the "modern" route has become set in stone and despite nearly every parameter having changed since then, it is taken as an unchangeable starting point. Added to which the taxpayers of Somerset are having to fork out for a NR-compliant crossing and all the gold-plating that goes with it, in a location that is over twenty miles away from the nearest NR track and on a railway that already has a set of traditional gates and a speed limit of 25 miles an hour.
     
    tracker, jnc и The Dainton Banker нравится это.
  5. Greenway

    Greenway Part of the furniture

    Дата регистрации:
    16 мар 2008
    Сообщения:
    4.019
    Симпатии:
    3.804
    Пол:
    Мужской
    Адрес:
    South Hams
    Heritage Railway Volunteer:
    No I do not currently volunteer
    A good read of the link provided by WS Wizard would explain why it is going to be this way.
     
    Last edited: 13 янв 2018
  6. Matt78

    Matt78 Well-Known Member

    Дата регистрации:
    27 июн 2007
    Сообщения:
    1.729
    Симпатии:
    3.862
    Род занятий:
    Solicitor
    Адрес:
    South Wales
    AIUI the responsibility for approving requirements at level crossings still rests with ORR/HMRI. Presumably it’s up to the operator to put forward the proposals to be approved. I can’t think of a situation where a new crossing has received gates as opposed to barriers unless anyone else can confirm?

    Regards

    Matt
     
  7. Ploughman

    Ploughman Part of the furniture

    Дата регистрации:
    1 апр 2008
    Сообщения:
    5.969
    Симпатии:
    2.761
    Род занятий:
    Ex a lot of things.
    Адрес:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    One consideration that I don't think has been made is that another signal box needs another signaller.
    Can this be feasible for this situation? Thinking of additional permanent staff or volunteer cover?
    Or is it more practical and economic to get the existing signaller to cover the additional crossing by an approved and up to date method?
     
  8. 35B

    35B Nat Pres stalwart

    Дата регистрации:
    18 июн 2011
    Сообщения:
    28.735
    Симпатии:
    28.667
    Пол:
    Мужской
    Адрес:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The late, great, Bernard Levin used to refer to “the fallacy of the altered perspective”. Given the way that the site has developed, I sense that this is set in concrete.


    Sent from my iPhone using Tapatalk
     
    jnc нравится это.
  9. gwilialan

    gwilialan Well-Known Member

    Дата регистрации:
    8 дек 2012
    Сообщения:
    1.706
    Симпатии:
    3.988
    Пол:
    Мужской
    Адрес:
    Out there somewhere
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Just catching up...

    A couple of interesting comments, giving SCC's viewpoint, in document #2:-

    "The West Somerset Railway is a key attraction in Somerset’s tourism sector and wider economy." and,

    "WSR carries over 200,000 passengers a year making it one of the largest attractions in Somerset and the South West England."

    Seems a shame (and slightly skewed) that others interested in tourism don't agree. ;)
     
    jnc нравится это.
  10. Bayard

    Bayard Well-Known Member

    Дата регистрации:
    26 апр 2015
    Сообщения:
    1.841
    Симпатии:
    3.904
    Пол:
    Мужской
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Sadly, Google is unable to find any reference to this. A pity, as it sounds an interesting concept.
     
  11. 35B

    35B Nat Pres stalwart

    Дата регистрации:
    18 июн 2011
    Сообщения:
    28.735
    Симпатии:
    28.667
    Пол:
    Мужской
    Адрес:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I’d need to look up his essays. He used it to describe how as one idea becomes acceptable, it makes previously completely unacceptable ideas appear reasonable and a natural progression.


    Sent from my iPad using Tapatalk
     
    Yorkshireman нравится это.
  12. aldfort

    aldfort Well-Known Member

    Дата регистрации:
    4 мар 2009
    Сообщения:
    1.933
    Симпатии:
    4.252
    Пол:
    Мужской
    Род занятий:
    Retired
    Адрес:
    Cardiff
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I have heard stories of steam locomotives crashing through manually controlled crossing gates, some from recent history . Perhaps those with a better knowledge of the history of the line can give exact examples as they relate to the WSR.
    Sadly I don't think it's always possible to prevent the 21st century intruding on heritage rail, in particular where it comes into contact with modern road infrastructure.
     
    Greenway, Dennis John Brooks и paulhitch нравится это.
  13. Some of this discussion begs the question "what do we mean by 'heritage'"? The existing Seaward Way crossing was built for a brand new road in the early 1990s and clearly suits that era. There was no crossing at that location and therefore nothing to 'preserve'. The upgrade will not significantly change the 1990s look and feel of it, at least not to the average guy. So maybe we should embrace the 20th century heritage that is evident at Seaward Way?

    Steve
    (one of those who believe in a wider definition of 'heritage')
     
  14. The MRLG state that their plan must not affect the heritage operation. Trouble is they don't say how that would be achieved.

    I'm more concerned that one part of SCC seems to agree with MRLG's aims whilst another part of SCC can write fine and very valid words as quoted above. Time SCC was quied on this, methinks. Transparency and all that.

    Steve
     
    Another Yorkshireman и Yorkshireman нравится это.
  15. The Man of Kent

    The Man of Kent New Member

    Дата регистрации:
    19 ноя 2017
    Сообщения:
    174
    Симпатии:
    347
    Пол:
    Мужской
    Адрес:
    West Somerset
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I see this as part of the trouble. The reason that we are having to respond to "their plan" is because we have no plan of our own. It would seem to me to be relatively simple to run the service without affecting the heritage operation.
    Taking the 2018 yellow timetable, the most intensive outside galas, you run an additional dmu service from Minehead before the 10.15 to run through to Taunton. The existing dmu paths are extended from and to Taunton and an additional down service runs after the 16.15 from Bishops Lydeard.
    Obviously it would require additional units that could run on the main line and longer shifts for signalmen but in the realm of preservation and heritage lines and the wonders that are regularly being achieved throughout our great movement is this really a problem, especially if those organisations that are pushing for it are invited to assist with the provision?
     
  16. Robin Moira White

    Robin Moira White Resident of Nat Pres

    Дата регистрации:
    27 апр 2014
    Сообщения:
    11.404
    Симпатии:
    18.231
    Пол:
    Женский
    Род занятий:
    Barrister
    Адрес:
    Stogumber
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Nowhere near that simple. Best to read the Railnews assessment.

    Robin
     
  17. Yorkshireman

    Yorkshireman Part of the furniture

    Дата регистрации:
    6 июл 2014
    Сообщения:
    4.486
    Симпатии:
    5.045
    Пол:
    Мужской
    Род занятий:
    Comfy chair occupant!
    Адрес:
    No moaners please!
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I suggest you read this nthread from start to finish to understand why the proposals are ludicrous.

    https://www.national-preservation.c...ability-of-extending-to-taunton.541153/page-1
     
    paulhitch, Another Yorkshireman и granmaree нравится это.
  18. Yorkshireman

    Yorkshireman Part of the furniture

    Дата регистрации:
    6 июл 2014
    Сообщения:
    4.486
    Симпатии:
    5.045
    Пол:
    Мужской
    Род занятий:
    Comfy chair occupant!
    Адрес:
    No moaners please!
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Deleted
     
  19. The Man of Kent

    The Man of Kent New Member

    Дата регистрации:
    19 ноя 2017
    Сообщения:
    174
    Симпатии:
    347
    Пол:
    Мужской
    Адрес:
    West Somerset
    Heritage Railway Volunteer:
    No I do not currently volunteer
    do you have a link?
     
  20. Miff

    Miff Part of the furniture Friend

    Дата регистрации:
    17 июн 2008
    Сообщения:
    3.001
    Симпатии:
    3.023
    As stated in the SCC reports increased levels of traffic in Seaward Way have contributed to safety concerns at this location. Converting from AHB to a controlled crossing will improve safety but increase the road closure time and add to traffic queues at busy times. Traditional gates would delay traffic even more; and would require a crossing keeper (unless there is ORR approved technology for remote control of newly installed traditional gates - which I doubt). Since SCC are paying, and they’re the highway authority .......
     
    Last edited: 14 янв 2018