If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Swanage Railway General Discussion

الموضوع في 'Heritage Railways & Centres in the UK' بواسطة Rumpole, بتاريخ ‏10 اكتوبر 2012.

  1. Monkey Magic

    Monkey Magic Part of the furniture

    إنضم إلينا في:
    ‏6 يناير 2018
    المشاركات:
    3,498
    عدد المعجبين:
    6,845
    مكان الإقامة:
    Here, there, everywhere
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Would it be very naughty to suggest asking XC if they want to extend their services from Bournemouth to Swanage?

    On the subject of FGW - they do run Sprinters down to Weymouth... and don’t SWR use 158s on the Lymington branch
     
  2. twr12

    twr12 Well-Known Member

    إنضم إلينا في:
    ‏2 سبتمبر 2007
    المشاركات:
    1,658
    عدد المعجبين:
    820
    Monkey Magic!

    You’re a child of the early 1980’s!
     
  3. johnofwessex

    johnofwessex Resident of Nat Pres

    إنضم إلينا في:
    ‏6 إبريل 2015
    المشاركات:
    9,748
    عدد المعجبين:
    7,858
    الجنس:
    ذكر
    الوظيفة:
    Thorn in my managers side
    مكان الإقامة:
    72
    Heritage Railway Volunteer:
    No I do not currently volunteer
    But when are you in favour of the Nuclear Option??

    Dubious call centres are the obvious candidate
     
    أعجب بهذه المشاركة Wenlock
  4. Jamessquared

    Jamessquared Nat Pres stalwart

    إنضم إلينا في:
    ‏8 مارس 2008
    المشاركات:
    27,790
    عدد المعجبين:
    64,453
    مكان الإقامة:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Sometimes my view changes when crossing the Wiltshire border and heading towards the general direction of Taunton (and points west) ...

    Tom
     
    Wenlock, Daddsie71b و flying scotsman123 معجبون بهذا.
  5. Jamessquared

    Jamessquared Nat Pres stalwart

    إنضم إلينا في:
    ‏8 مارس 2008
    المشاركات:
    27,790
    عدد المعجبين:
    64,453
    مكان الإقامة:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Hmmm - Bournemouth to Wareham is 25 minutes one way; Wareham to Swanage probably 45 minutes. So you add getting on for 2.5 hours just to run Bournemouth - Swanage - Bournemouth, relative to a cross country unit just being serviced and turned straight back at Bournemouth to do the next north-bound run. No doubt it is technically feasible, but only if extra units (and drivers) were available - i.e. at a cost that is far more than just the marginal cost of a small extra mileage.

    Tom
     
    Wenlock, Shaggy و Mogul معجبون بهذا.
  6. 4950

    4950 New Member

    إنضم إلينا في:
    ‏21 ديسمبر 2017
    المشاركات:
    26
    عدد المعجبين:
    32
    الجنس:
    ذكر
    مكان الإقامة:
    Patshull Hall
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Fare abstraction may not be as much of an issue if a mechanism was put into place whereby the track access charge for a third party operator had some link to the usage of the service. After all, as a trial service surely the SR is obtaining data on passenger usage (eg: type of ticket, destination, discount etc) on which such a mechanism could be based?
     
  7. Mogul

    Mogul Member

    إنضم إلينا في:
    ‏2 فبراير 2016
    المشاركات:
    324
    عدد المعجبين:
    687
    الجنس:
    ذكر
    مكان الإقامة:
    Dorset
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    You are making an assumption that SR would be free to negotiate the track access charge on its own terms. Even if SR was able to implement such a mechanism, what would be left in it for the third party operator to make it worth their while? This is particularly a problem when there is a large disparity between SR fairs and the third party operator fairs. Mile for mile SR heritage fairs are several times a main line fair. How could you afford to compensate for the loss of the larger fair? IMHO it just doesn't stack up and without a subsidy one party or the other will end up the loser.

    Fare abstraction aside there are the other issues with third party operation covered on this linked post that track access charges will never compensate for.
     
    Last edited: ‏2 فبراير 2018
    أعجب بهذه المشاركة Daddsie71b
  8. 4950

    4950 New Member

    إنضم إلينا في:
    ‏21 ديسمبر 2017
    المشاركات:
    26
    عدد المعجبين:
    32
    الجنس:
    ذكر
    مكان الإقامة:
    Patshull Hall
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The SR is effectively the infrastructure provider; why should it not negotiate the track access charge on their own terms? Is that not what happens when railtours work in?
     
  9. Henry the Green Engine

    Henry the Green Engine New Member

    إنضم إلينا في:
    ‏4 ديسمبر 2016
    المشاركات:
    74
    عدد المعجبين:
    58
    الجنس:
    ذكر
    مكان الإقامة:
    Hants
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Does the Hastings unit use the same supply chain for wheelsets? That one seems to run main line without wheelset problems. Main line Mk1's, who does their bogies?
     
  10. threelinkdave

    threelinkdave Well-Known Member

    إنضم إلينا في:
    ‏1 أوت 2013
    المشاركات:
    2,065
    عدد المعجبين:
    1,240
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Stratford-upon-Avon or in a brake KD to BH
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I think you will find the problem stems from the axles not meeting the required standards for crack testing and to an extent being unique to lightweight DMUs If memory serves the hastings units run on bogies similar to Mk1 and we must assume that the axles pass the required ultrasound tests and dont need replacing
     
    Mogul و Wenlock معجبون بهذا.
  11. twr12

    twr12 Well-Known Member

    إنضم إلينا في:
    ‏2 سبتمبر 2007
    المشاركات:
    1,658
    عدد المعجبين:
    820
    On the whole, B4 wheelsets are still supported by wheelset overhaulers.
    All B4 type wheelsets (many Mk1s and all Mk2s) have SKF axleboxes and bearings.
    For Commonwealth bogie wheelsets, there is a general change to standardise on SKF bearings, axleboxes and axles; because SKF lead times are much shorter and the bearings much cheaper than Timken bearings.
    The main problem with Timken imperial bearings as used on some Commonwealth, many 1st gen DMUs, English Electric diesels (not 73s, they are SKF) is the minimum 6 month lead time and eye watering prices.

    Compared with either on the shelf or a few weeks for SKF bearings for a few £100 per bearing.
     
    burmister, joe_issitt, desperado و 1 شخص آخر معجبون بهذا.
  12. Daddsie71b

    Daddsie71b Member Friend

    إنضم إلينا في:
    ‏4 إبريل 2013
    المشاركات:
    941
    عدد المعجبين:
    803
    الجنس:
    ذكر
    مكان الإقامة:
    34091
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    So does pose the question, why not re-engineer for SKF bearings?
     
  13. Mogul

    Mogul Member

    إنضم إلينا في:
    ‏2 فبراير 2016
    المشاركات:
    324
    عدد المعجبين:
    687
    الجنس:
    ذكر
    مكان الإقامة:
    Dorset
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    If you think bearing lead time is a problem you are going to love the process for qualifying a new design to main line standards.
     
    Bean-counter, Daddsie71b, Shaggy و 2 آخرون معجبون بهذا.
  14. Monkey Magic

    Monkey Magic Part of the furniture

    إنضم إلينا في:
    ‏6 يناير 2018
    المشاركات:
    3,498
    عدد المعجبين:
    6,845
    مكان الإقامة:
    Here, there, everywhere
    Heritage Railway Volunteer:
    No I do not currently volunteer
    :) Who'd not want to be a monkey born out of an egg on the top of a mountain.

    I wasn't being entirely serious but more to flag up the diesels west of Southampton.

    I am assuming that XC don't have the stock. My understanding is that the whole reason why Virgin XC cut back from Brighton, Poole and Portsmouth was so they could run a more frequent service with fewer trains. (I am entirely happy to be corrected in this).

    Although, as I recall (and I am sure someone knows better) isn't the Lymington Shuttle a 158/159 during the week and 450 at weekends, so potentially there is a 158/159 around that isn't in use over the weekends so maybe SWR could use that?
     
  15. Gladiator 5076

    Gladiator 5076 Resident of Nat Pres

    إنضم إلينا في:
    ‏2 اكتوبر 2015
    المشاركات:
    7,914
    عدد المعجبين:
    6,647
    الجنس:
    ذكر
    مكان الإقامة:
    Swanage
    Heritage Railway Volunteer:
    No I do not currently volunteer
    With services about to commence at the weekend a few shots from the engineering activity in the station area. The other side of the Birds Nest has already been painted.
    Also today 257 Squadron made a brief appearance away from its regular location near the pit IMG_0466.JPG IMG_0476.JPG IMG_0481.JPG IMG_0480.JPG .
     
    6960 Raveningham Hall, nine elms fan و David R معجبون بهذا.
  16. cymroglan

    cymroglan Member

    إنضم إلينا في:
    ‏9 جوان 2009
    المشاركات:
    584
    عدد المعجبين:
    90
    Any chance of a heads up regarding loco roster for the return of trains? Hoping to nip down sometime in the next few days. Thanks!
     
  17. Gladiator 5076

    Gladiator 5076 Resident of Nat Pres

    إنضم إلينا في:
    ‏2 اكتوبر 2015
    المشاركات:
    7,914
    عدد المعجبين:
    6,647
    الجنس:
    ذكر
    مكان الإقامة:
    Swanage
    Heritage Railway Volunteer:
    No I do not currently volunteer
    31806 was in light steam when I went down the Post Office this morning, so I guess that will be the loco for half term week.
     
  18. cymroglan

    cymroglan Member

    إنضم إلينا في:
    ‏9 جوان 2009
    المشاركات:
    584
    عدد المعجبين:
    90
  19. burmister

    burmister Member

    إنضم إلينا في:
    ‏2 أوت 2008
    المشاركات:
    284
    عدد المعجبين:
    292
    Introducing a bit of drift, I suspect the whole question of tyre and pan renewals and the cost of them is one the heritage railways have not thought about let alone addressed seriously. Yes running on good railhead profile at 25mph with no flat incidents will not cause a lot of wear per year but as rails grow older any lipping will chew through flanges like butter let alone people leaving handbrakes on or stuffing in full brake on a wet rusty rail with a resulting loud bang bang noise after release. As its not sexy it does not get attention till it smashes you in the face ( just ask the Bluebell) but its the elephant in the room in my opinion.
     
  20. threelinkdave

    threelinkdave Well-Known Member

    إنضم إلينا في:
    ‏1 أوت 2013
    المشاركات:
    2,065
    عدد المعجبين:
    1,240
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Stratford-upon-Avon or in a brake KD to BH
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Perhaps it has not been mentioned in the comics but the SVR has recently had a set of LNER wheels retyred and profiled
     

مشاركة هذه الصفحة