GWSR Broadway Developments

Rasprava u 'Heritage Railways & Centres in the UK' pokrenuta od Breva, 1. Kolovoz 2014..

  1. Breva

    Breva Well-Known Member

    Pridružen(a):
    11. Listopad 2010.
    Poruka:
    2,347
    Lajkova:
    4,078
    Grad:
    Gloucestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The video of the train departing has now uploaded. You can see it here:



    The first steam hauled train out of the newly rebuilt Broadway station.
     
  2. AndyY

    AndyY Member

    Pridružen(a):
    23. Veljača 2013.
    Poruka:
    433
    Lajkova:
    480
    The cameraman standing in the four-foot is going to have to learn that he isn't on a building site any more, he's now on a working railway!!!

    Splendid stuff.
     
    Kinghambranch and 30854 like this.
  3. 30854

    30854 Resident of Nat Pres

    Pridružen(a):
    8. Ožujak 2017.
    Poruka:
    12,172
    Lajkova:
    11,496
    Spol:
    Muškarac
    Interesi:
    Retired
    Grad:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Enquiry: Has the official inspection to clear the extension for opening been conducted yet?
     
  4. AndyY

    AndyY Member

    Pridružen(a):
    23. Veljača 2013.
    Poruka:
    433
    Lajkova:
    480
    Does it need one? I believe there is a self-certification process in place these days.
     
    30854 se sviđa ovo.
  5. Matt78

    Matt78 Well-Known Member

    Pridružen(a):
    27. Lipanj 2007.
    Poruka:
    1,730
    Lajkova:
    3,867
    Interesi:
    Solicitor
    Grad:
    South Wales
    There is, but an Independent Competent Person may have been appointed for any “new” aspects. New in this sense meaning “a different way of working” rather than physically new. In saying that the GWSR already have dual platforms, overbridges and CWR track on the existing line so there probably isn’t much that is “new” to the existing operation.

    Regards

    Matt
     
    30854 se sviđa ovo.
  6. Mark Thompson

    Mark Thompson Well-Known Member

    Pridružen(a):
    10. Rujan 2017.
    Poruka:
    1,592
    Lajkova:
    3,934
    Spol:
    Muškarac
    Grad:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Beautiful sight!
    What a week it has been for the heritage movement- first events at Lynton, now this at Broadway. Get IN!
     
    green five, Beckford i 30854 se sviđa ovo.
  7. Steve

    Steve Resident of Nat Pres Friend

    Pridružen(a):
    7. Listopad 2006.
    Poruka:
    12,734
    Lajkova:
    11,851
    Interesi:
    Gentleman of leisure, nowadays
    Grad:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    HMRI/ORR no longer carry out official inspections of new works. This is largely to avoid them 'approving' as they cannot then be the enforcing authority if something is found wanting. You now have a safety verification by an Independent Competent Person but only if what is being put to use is (1) new technology, or new to the system , and, (2) There is a significant new risk or increase in risk. I would say the answer to both of these is no so the railways change management system should be sufficient.
     
    Kinghambranch, 30854 i D1039 se sviđa ovo.
  8. D6969

    D6969 New Member

    Pridružen(a):
    16. Siječanj 2009.
    Poruka:
    67
    Lajkova:
    35
    Spol:
    Muškarac
    Interesi:
    Pway
    Grad:
    Gloucestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The person in question is a long standing Pway member and a director, the person to the left well?!
     
    30854 se sviđa ovo.
  9. Steve

    Steve Resident of Nat Pres Friend

    Pridružen(a):
    7. Listopad 2006.
    Poruka:
    12,734
    Lajkova:
    11,851
    Interesi:
    Gentleman of leisure, nowadays
    Grad:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    And was probably using common sense, in any case. My guess is that there wasn't another loco/piece of motive power for miles and my next guess is that, unlike me, he knew that for a fact.
     
    flying scotsman123 and michaelh like this.
  10. AndyY

    AndyY Member

    Pridružen(a):
    23. Veljača 2013.
    Poruka:
    433
    Lajkova:
    480
    For the benefit of those who didn't realise, my tongue was firmly in my cheek when I made my comment.........
     
  11. Gloucester Boy

    Gloucester Boy New Member

    Pridružen(a):
    1. Listopad 2013.
    Poruka:
    125
    Lajkova:
    352
    Spol:
    Muškarac
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    We did, I counted that there were 20 of us on the signing on sheet on Saturday. The team I was working with were preparing the sub base surface of the platform at the North end ( South end already completed) and the driveway path ready for tarmacking , which will take place on Monday/Tuesday next week. Only a short section to do of the path which will be done on Monday. Hard work as all the materials were brought to where we were working by volunteers with wheel barrows and a lot of time was spent on our knees leveling the sub base level.

    I am aware that at least 3 painters were working today, some more volunteers doing carpentry work, some fitting the lamps with their bulbs and Lantern (?) tops on the driveway. Also Building & Services were fitting a few more granite kerbs so we can continue with the slabbing on the forecourt side of the station building on Monday. I am sure that many other jobs were being preformed on site by others that I have missed, sorry.

    When the tarmacking is finished, there is a further 10 meters of slabbing to do on the North end of the platform before the first train arrives on the 21st, lots to do, so plenty of extra days being worked by many volunteers, perhaps we should have a tented village there to save all the travelling, as the navvies did when they built the line - now that would be authentic!
     
    jnc, Kinghambranch, AndyY i 7 ostalih se sviđa ovo.
  12. toplight

    toplight Well-Known Member

    Pridružen(a):
    18. Svibanj 2009.
    Poruka:
    1,351
    Lajkova:
    1,288
    Grad:
    Swindon, England
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Nice that the train is 8 coaches, I read on the blog that they will all be 8 coaches from now on (previously was 7) which is great. Hopefully they will generally be full. Would it be a struggle for smaller engines though like small praires although I know the line is generally flat. ? Foremarke Hall looking good, I remember it running for the very first time on the Swindon and Cricklade Railway after is rebuild from Barry condition.
     
  13. LC2

    LC2 Member

    Pridružen(a):
    10. Lipanj 2012.
    Poruka:
    854
    Lajkova:
    1,023
    Interesi:
    IT
    Grad:
    70B
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Oh gawd NO!!!! You'll summon *HIM* with all that talk about running train lengths appropriate for now, rather than just prior to closing.
    Quick, delete it now and pretend it didn't happen ;)
     
    green five, 1472, Copper-capped i 7 ostalih se sviđa ovo.
  14. Pete Thornhill

    Pete Thornhill Resident of Nat Pres Staff Member Administrator Moderator Friend

    Pridružen(a):
    24. Srpanj 2008.
    Poruka:
    7,774
    Lajkova:
    5,908
    Yes really you need to swap the Hall for a Castle and add a couple more coaches then you would have an authentic train for the line - The Cornishman ;)

    Or nearer to closer, after the regular trains stopped you could have a Duff on 15 MK1’s which was a regular race day occurrence :D
    The advantage of an ex main line :)
     
  15. LC2

    LC2 Member

    Pridružen(a):
    10. Lipanj 2012.
    Poruka:
    854
    Lajkova:
    1,023
    Interesi:
    IT
    Grad:
    70B
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Double, double 7P and trouble;
    Fire burn and Welsh Coal bubble.
    Fillet of a 8 Coach rake,
    In the caldron a Queen Mary brake;
    Eye of Annie and toe of Claribel,
    Ryde to Pier and Wooton to Newport,
    Linear scrapyard and rust stained tin,
    Load 3 and a Terrier's fin,
    For a charm the Mainline Connection,
    Like a hell-broth boil and WIBN.

    I'll get me coat.
     
  16. Mark Thompson

    Mark Thompson Well-Known Member

    Pridružen(a):
    10. Rujan 2017.
    Poruka:
    1,592
    Lajkova:
    3,934
    Spol:
    Muškarac
    Grad:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Hahahahaaa! Excellent!
     
  17. MellishR

    MellishR Resident of Nat Pres Friend

    Pridružen(a):
    16. Travanj 2009.
    Poruka:
    8,913
    Lajkova:
    5,851
    As the departing train went straight past a signal in the ON position, I assume that the signals are not yet in use, but that raises some questions. When is it necessary and when not for signals that are not in use to be so marked? And how are the train movements controlled at present? Is Broadway station treated at present as part of the single line section from Toddington?
     
  18. Kinghambranch

    Kinghambranch Well-Known Member

    Pridružen(a):
    20. Prosinac 2006.
    Poruka:
    1,879
    Lajkova:
    1,612
    Spol:
    Muškarac
    Interesi:
    Retired
    Grad:
    White Rose County
    Heritage Railway Volunteer:
    No I do not currently volunteer
    White crosses will be fixed on the boards imminently I believe.
     
  19. Kinghambranch

    Kinghambranch Well-Known Member

    Pridružen(a):
    20. Prosinac 2006.
    Poruka:
    1,879
    Lajkova:
    1,612
    Spol:
    Muškarac
    Interesi:
    Retired
    Grad:
    White Rose County
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Halls were common sights on this route, even I can just remember them! Sometimes the Cornishman would be hauled by a Hall but, as you quite rightly state, Castles were the preferred motive power. the GWSR doesn't have one, yet. What's a "Duff" btw?
     
  20. Kje7812

    Kje7812 Part of the furniture

    Pridružen(a):
    25. Studeni 2010.
    Poruka:
    2,846
    Lajkova:
    1,205
    Grad:
    Kidderminster/ York
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Class 47, or Brush Type 4 if you're being pre-TOPS.
     