If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Bridge that Gap: Great Central Railway News

Тема в разделе 'Heritage Railways & Centres in the UK', создана пользователем Gav106, 8 май 2010.

  1. Johann Marsbar

    Johann Marsbar Well-Known Member

    Дата регистрации:
    21 фев 2016
    Сообщения:
    1.669
    Симпатии:
    2.178
    Пол:
    Мужской
    Адрес:
    Suffolk
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Another update posted a couple of days ago...
    http://www.gcrailway.co.uk/unify/
     
    aron33, jnc, J Rob't Harrison и 4 другим нравится это.
  2. seawright

    seawright New Member

    Дата регистрации:
    30 сен 2012
    Сообщения:
    169
    Симпатии:
    26
    The article in the Rail Engineer states that speeds of up to 75mph are allowed for testing purposes. Is this correct, as I was under the impression that the dispensation only allowed speeds of up to 60mph?
     
  3. pwsw5054

    pwsw5054 Member

    Дата регистрации:
    5 янв 2016
    Сообщения:
    411
    Симпатии:
    1.284
    Пол:
    Мужской
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I think it's 60 for steam

    Sent from my SM-A310F using Tapatalk
     
  4. Raimondo

    Raimondo New Member

    Дата регистрации:
    24 окт 2005
    Сообщения:
    135
    Симпатии:
    116
    Yep, I understand it's 60mph for steam and 75mph for diesels.

    Here's a video of the Peak D123 doing some 75mph brake testing...
     
    echap и 30854 нравится это.
  5. JWKB

    JWKB Member

    Дата регистрации:
    17 апр 2005
    Сообщения:
    421
    Симпатии:
    95
    Morning All,
    I was wondering if there was anywhere that provided a breakdown of how much each of the elements of phase 1 had cost i.e Bridge, Abutments etc
    I have had a quick look at this thread and the offical website with no joy....
     
  6. John Webb

    John Webb Member

    Дата регистрации:
    2 мар 2010
    Сообщения:
    501
    Симпатии:
    86
    Род занятий:
    Retired
    Адрес:
    St Albans, Herts
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Bearing in mind commercial contractors are involved, I would think that such a breakdown might be considered as 'Commercial in Confidence' and unlikely to be put into the public domain. Out of curiosity what is your interest in such a breakdown of the costs?
     
    Black Jim нравится это.
  7. mogulb

    mogulb New Member

    Дата регистрации:
    20 дек 2010
    Сообщения:
    133
    Симпатии:
    95
    I was wondering if there was anywhere that provided a breakdown of how much each of the elements of phase 1 had cost i.e Bridge, Abutments etc
    I have had a quick look at this thread and the offical website with no joy...

    James. Not seen anything that gives a total breakdown, which is not surprising as a full design has not been completed and all permissions , agreements etc are not yet in place.
    The bridge over the MML construction cost is just under £2m (from GCRs accounts) plus additional piling works. The bridge over the canal refurbishment has been costed at £400,000 and is subject to a recently launched appeal. Also a substantial sum has already been spent on surveys, design work, legal work etc etc.
     
  8. JWKB

    JWKB Member

    Дата регистрации:
    17 апр 2005
    Сообщения:
    421
    Симпатии:
    95
    Evening,

    The reason was just pure curiosity on my part about the cost of physically constructing the steel deck and abutments. Over recent years many railways (NYMR, WHR, RVR) have built new bridges and it is just interesting to see what the replacement cost is compared to typical repair cost.


    James Buckley
     
  9. AndyY

    AndyY Member

    Дата регистрации:
    23 фев 2013
    Сообщения:
    433
    Симпатии:
    480
    Given that the bridge was completely missing there was only one option in this case!
     
  10. MellishR

    MellishR Resident of Nat Pres Friend

    Дата регистрации:
    16 апр 2009
    Сообщения:
    8.912
    Симпатии:
    5.847
    But on the other hand there was a second-hand deck available.
     
  11. Bean-counter

    Bean-counter Part of the furniture

    Дата регистрации:
    21 июл 2007
    Сообщения:
    5.844
    Симпатии:
    7.688
    Пол:
    Мужской
    Адрес:
    Former NP Member
    Heritage Railway Volunteer:
    No I do not currently volunteer
    In some respects, this would be cheaper - no old deck to get out of the way first! However, I believe the abutments needed at least major work if not building from scratch on one side, so it is 'swings and roundabouts'.

    The actual beams and decking units can be quite 'cheap' (I seem to recall the basic beams for Bridge 30 were under £100k but were probably around 10% of the total project costs including associated trackwork). In this case, installation would be the main cost I suspect - not least NwR possessions.

    I was once told by someone who knows that certain bridges were just 'little bridges - around £100k to replace'!

    Steven
     
    Black Jim и Bluenosejohn нравится это.
  12. AndyY

    AndyY Member

    Дата регистрации:
    23 фев 2013
    Сообщения:
    433
    Симпатии:
    480
    True, but not long enough to reach across in one span, and the second-hand decks are planned to be used on the 'gap' job anyway.
     
    jnc нравится это.
  13. AndyY

    AndyY Member

    Дата регистрации:
    23 фев 2013
    Сообщения:
    433
    Симпатии:
    480
    As a further observation, I understand that once the bridge is complete it will be handed over to Network Rail who will then take on responsibility for its maintenance. Having a new bridge to a NR standard design therefore makes sense.
     
    W.Williams, aron33, CH 19 и 4 другим нравится это.
  14. mikechant

    mikechant Member

    Дата регистрации:
    24 окт 2012
    Сообщения:
    225
    Симпатии:
    243
    The GCR is very much on the ball as far as fundraising. There is a specific £475,000 appeal now for the canal bridge to be restored this Autumn and inspired by the reality of the Midland Mainline bridge installation I have just made a substantial donation (>1/1000 of the cost). This is not to boast (I'm very lucky to be in this position due to an inheritance) but to encourage others who can afford to donate to do so. This project can come to fruition sooner rather than later if the donations keep flowing.
     
    David R, Black Jim, desperado и 8 другим нравится это.
  15. Railboy

    Railboy New Member

    Дата регистрации:
    10 дек 2016
    Сообщения:
    166
    Симпатии:
    238
    Пол:
    Мужской
    Адрес:
    Hamburg
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Here I will share to you one of the most recent videos of the GCR concerning the planning and the future developments required for reunification.


    It's really interesting to see they use the world wide (I think I have to exlude to somehow the states, because they're still performing well in their way of exeptionalism) understandable SI system (metric system) in most of the given information and probably also for construction, although they give the total length in nostalgic miles. For every engineer it's real headache but at least we do now have the information how the whole embankment will look like in about a decade time(or maybe even a bit less).

    Cheers!
     
    deaftech, CH 19, J Rob't Harrison и 5 другим нравится это.
  16. Johann Marsbar

    Johann Marsbar Well-Known Member

    Дата регистрации:
    21 фев 2016
    Сообщения:
    1.669
    Симпатии:
    2.178
    Пол:
    Мужской
    Адрес:
    Suffolk
    Heritage Railway Volunteer:
    No I do not currently volunteer
    J Rob't Harrison, Tuska и TommyD нравится это.
  17. Johann Marsbar

    Johann Marsbar Well-Known Member

    Дата регистрации:
    21 фев 2016
    Сообщения:
    1.669
    Симпатии:
    2.178
    Пол:
    Мужской
    Адрес:
    Suffolk
    Heritage Railway Volunteer:
    No I do not currently volunteer
    jnc, David R, J Rob't Harrison и ещё 1-му нравится это.
  18. Johann Marsbar

    Johann Marsbar Well-Known Member

    Дата регистрации:
    21 фев 2016
    Сообщения:
    1.669
    Симпатии:
    2.178
    Пол:
    Мужской
    Адрес:
    Suffolk
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The latest edition of the FoGCML magazine Main Line, which arrived yesterday, has a 3 page article on the changes necessary to link the "Gap" section to Loughborough station, including a rebuilt loco shed/workshops on its existing location. Looks like double track is planned to extend north of the canal bridge area, passing by the shed on its western side .
     
    Last edited: 4 мар 2018
    Black Jim и J Rob't Harrison нравится это.
  19. Johann Marsbar

    Johann Marsbar Well-Known Member

    Дата регистрации:
    21 фев 2016
    Сообщения:
    1.669
    Симпатии:
    2.178
    Пол:
    Мужской
    Адрес:
    Suffolk
    Heritage Railway Volunteer:
    No I do not currently volunteer
    David R, Black Jim, jnc и ещё 1-му нравится это.
  20. mikechant

    mikechant Member

    Дата регистрации:
    24 окт 2012
    Сообщения:
    225
    Симпатии:
    243
    'Match funding March' for the canal bridge fund is drawing to a close, I've just donated and with gift aid *and* match funding my donation is worth about 2.5x the amount I paid. Get in there now, 2 days to go!
     