If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

LMS Patriot Project Updates

本贴由 Gav1062011-04-10 发布. 版块名称: Steam Traction

  1. Muzza

    Muzza New Member

    注册日期:
    2006-02-16
    帖子:
    180
    支持:
    185
    性别:
    所在地:
    Mareeba, Qld, Australia
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    He does look like he's having fun though.......
     
  2. BanburyKev

    BanburyKev New Member

    注册日期:
    2009-09-09
    帖子:
    66
    支持:
    382
    性别:
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Engineering Up-date - February 2018
    Submitted by Kevin West on 16 April, 2018 - 08:42
    Locomotive Frame Assembly
    Firstly, an apoligy from me for the delay in posting this up-date. The reports are created around the schedule for our Warrior Newsletter, for this up-date I just forgot to post it on the web-site!

    Work continues on the construction of The Unknown Warrior at number of locations.

    [​IMG]

    Board Members inspect progress on the boiler at West Shed, Sat 27th January prior to a board meeting. Photo – Kevin West

    Boiler
    Construction of the boiler for the Unknown Warrior continues to make good progress at Heritage Boiler Steam Services.

    Work is mainly progressing on marking out the various parts ready to start drilling the many rivet and stay holes required.

    [​IMG]

    The Doorplate being marked out for drilling. HBSS, West Shed, 27th January 2018. Photo – Kevin West

    [​IMG]

    The Outer Firebox Wrapper showing the stay holes marked out prior to drilling. Photo – Kevin West

    A small issue was discovered on some of the holes drilled in the Doorplate. The Doorplate was returned to LNWR Heritage, Crewe and was back at the West Shed within a week following correction.

    [​IMG]

    The Doorplate showing the doubler plate fitted inside. Photo – Kevin West

    HBSS have continued marking out the various parts ready for drilling rivet and stay holes.

    [​IMG]

    Boiler Components in the workshop at HBSS. Photo – Kevin West

    The Doubler Plates for fitting inside the sides of the Outer Firebox have been delivered to HBSS and work has started on marking out for drilling.

    [​IMG]

    The Doubler Plates. Photo – Kevin West

    This work is a major step forward towards the completion of the boiler assembly.

    The casting for the Boiler Steady Bracket which fits to the base of the Doorplate on the rear of the Boiler has been cast and awaits quotation for machining.

    [​IMG]

    [​IMG]

    Casting for the Boiler Steady Bracket. Photo – Kevin West

    [​IMG]

    Inner Firebox at West Shed. Photo – Kevin West

    [​IMG]

    Inside view of the Inner Firebox showing the stay holes in the crown. Photo – Kevin West

    Locomotive Chassis
    From outside appearances little work appears to be progressing on the chassis at present. In fact, the work being undertaken is final lining up of the Valve Crosshead Slides and other motion parts.

    [​IMG]

    Front of the locomotive showing the Smokebox floor area. Photo – Kevin West

    The Blast Pipe and Blast Pipe Cap have been delivered to Llangollen. These will be trial fitted to the chassis in the near future to check for alignment.

    Following completion of the lubrication pipework under the Smokebox, the Smokebox Floor Plate work can be completed.

    We are waiting for delivery of the Reverser Shafts following machining before the next round of major work starts on the chassis.

    [​IMG]

    Main Reverser Shaft Bearings. Photo – Kevin West

    Brake System and Lubrication System
    Work continues on installing the lubrication system pipework.

    [​IMG]

    Cylinder Oil Atomiser in position with evidence of lubrication pipework in the background. Photo – Kevin West

    The drive gear for the mechanical lubricators has been checked and the Running Plates slotted for the Operating Arms.

    [​IMG]

    At view from below the Running Board showing the Lubricator Drive Arm. Photo – Kevin West

    The machining required on the Brake Cylinder Piston has finally been undertaken and is due back at Llangollen to allow the Cylinder to be assembled and fitted to the Chassis. This will complete the mechanical assemble of the locomotive braking system.

    Refurbishment of the original 9” Tender Brake Cylinder from 8F 48518 continues at Harco Engineering.

    Pistons, Valves and Motion
    Work is progressing on the procurement and manufacture of the remaining Inside Valve Gear parts.

    The Return Cranks have been finished and await delivery to Llangollen.

    [​IMG]

    Return Cranks. Photo – Robert Stephenson Engineering

    [​IMG]

    RH Valve Crosshead Slide. Photo – Kevin West

    Design work is progressing on the Piston Rod Glands and Covers plus Squab Boxes for lubrication of the Piston Rods. These will be based on those fitted to the Black 5’s as no drawings of the originals have been found.

    [​IMG]

    Squab Box fitted to Black 5 45337. Photo – Kevin West



    Manufacture of the Cab Reverser unit continues at Harco Engineering.





    Drain Cock Gear, Cylinder Relief Valves & Sanding Gear
    The Cylinder Relief Valves have been sent to a specialist Safety Valve company in Gloucester for testing and setting. Once set up on the test rig it has shown up a weakness in one of the castings. The Spring Cages are failing and cracking. The supplier of the castings has been contacted and we await a reply regarding replacement castings.

    [​IMG]

    Cylinder Relief Valve on the test rig. Photo – Kevin West

    [​IMG]

    Relief Valve Spring Cage casting showing failed casting. Photo – Kevin West

    Without these parts the Valves cannot be completed and tested allowing fitting to the locomotive which has a knock on effect on delaying the installation of the rest of the Drain Cock operating gear.

    Fittings
    We continue sourcing fittings required for the locomotive.

    We are presently looking to obtain the Steam Heating Shut Off Valves that are fitted to the Buffer Beams of the Locomotive and Tender. The LMS fittings appear to be very scarce, so we will probably have to make new castings rather that obtain complete valves. The original drawings also do not appear to have survived so we are looking to borrow a valve to create new drawings. Unfortunately, even this is proving difficult as most are fitted to working locomotives!

    [​IMG]

    The Steam Heat Valve fitted to Black 5 45337. Photo – Kevin West

    Tender

    Work has re-started on the preparation of the Tender chassis for riveting with the countersinking of numerous holes.

    Future Work Planning
    Areas of existing design work include, Boiler Cladding Sheets, Cab Footplate structure and Tender Tank.
     
    已获得Kempenfelt 82e, Haighie, CH 19另外14人的支持.
  3. RalphW

    RalphW Nat Pres stalwart Staff Member Administrator Friend

    注册日期:
    2005-09-11
    帖子:
    36,451
    支持:
    9,911
    性别:
    职业:
    Retired-ish, Part time rail tour steward.
    所在地:
    Northwich
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Once again Kevin thank you for your very comprehensive update, it helps to underline what I huge task it is.
     
    已获得30854Richard Roper的支持.
  4. Gav106

    Gav106 Well-Known Member

    注册日期:
    2010-03-29
    帖子:
    1,772
    支持:
    2,170
    所在地:
    Nantwich, Cheshire
  5. 240P15

    240P15 Well-Known Member

    注册日期:
    2017-12-01
    帖子:
    1,603
    支持:
    1,593
    性别:
    所在地:
    Norway
    Heritage Railway Volunteer:
    No I do not currently volunteer
    已获得Gav106的支持.
  6. Richard Roper

    Richard Roper Well-Known Member

    注册日期:
    2006-05-22
    帖子:
    1,310
    支持:
    1,359
    性别:
    职业:
    Librarian
    所在地:
    Just up the road from 56E Sowerby Bridge
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thank You for the update Gav! It looks odd seeing the outer wrapper attached to the throatplate before the plate is cut to follow the slope of the throatplate.
    Good progress though, it's all coming together!

    Richard.:)
     
    已获得Gav106240P15的支持.
  7. 240P15

    240P15 Well-Known Member

    注册日期:
    2017-12-01
    帖子:
    1,603
    支持:
    1,593
    性别:
    所在地:
    Norway
    Heritage Railway Volunteer:
    No I do not currently volunteer
  8. Gav106

    Gav106 Well-Known Member

    注册日期:
    2010-03-29
    帖子:
    1,772
    支持:
    2,170
    所在地:
    Nantwich, Cheshire
  9. RalphW

    RalphW Nat Pres stalwart Staff Member Administrator Friend

    注册日期:
    2005-09-11
    帖子:
    36,451
    支持:
    9,911
    性别:
    职业:
    Retired-ish, Part time rail tour steward.
    所在地:
    Northwich
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Another excellently detailed progress report, many thanks for keeping them coming.
     
    已获得jnc, Kinghambranch, S.A.C. Martin另外2人的支持.
  10. huochemi

    huochemi Part of the furniture

    注册日期:
    2008-05-06
    帖子:
    3,002
    支持:
    1,521
    性别:
    所在地:
    UK
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Good stuff. Does Kevin mean a trapezoidal rather than "triangular" thread? Seems bizarre that a square form tap could be delivered in response to a spec for a vee form thread. Also seems odd that the LNWR/LMS used a vee thread form for a regularly used heavy duty screw thread rather than an Acme / trapezoidal profile or square form. To cut the internal thread, presumably you would rough it out with a tool mounted in a between centres boring bar, started three times at 0,120, 240 by indexing?
     
    已获得John Merry的支持.
  11. andalfi1

    andalfi1 Well-Known Member

    注册日期:
    2008-11-05
    帖子:
    1,007
    支持:
    466
    性别:
    职业:
    Semi Retired.
    所在地:
    Haworth
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Spoken like a true machinist...
     
    已获得oddsocksJohn Merry的支持.
  12. Gav106

    Gav106 Well-Known Member

    注册日期:
    2010-03-29
    帖子:
    1,772
    支持:
    2,170
    所在地:
    Nantwich, Cheshire
    已获得andalfi1S.A.C. Martin30854的支持.
  13. 30854

    30854 Resident of Nat Pres

    注册日期:
    2017-03-08
    帖子:
    12,172
    支持:
    11,496
    性别:
    职业:
    Retired
    所在地:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It is Gav ..... cheers. Just can't select individual images (as with all FB pages) without signing in.
     
    已获得Gav106的支持.
  14. Richard Roper

    Richard Roper Well-Known Member

    注册日期:
    2006-05-22
    帖子:
    1,310
    支持:
    1,359
    性别:
    职业:
    Librarian
    所在地:
    Just up the road from 56E Sowerby Bridge
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thank You for the link Gav! More excellent progress being made! I hope the replacement reverser shafts won't take a massively long time to be manufactured and supplied too.

    Richard.
     
    已获得andalfi1的支持.
  15. Kylchap

    Kylchap Member

    注册日期:
    2015-12-15
    帖子:
    492
    支持:
    935
    性别:
    所在地:
    East Anglia
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The Patriot Project has had some serious setbacks over the last year so it's good to see that the current boiler build seems to be a success story so far. Let's hope HBSS becomes an important part of the rebuild/newbuild scene.
     
    已获得andalfi1, Gav106, Kinghambranch另外3人的支持.
  16. 240P15

    240P15 Well-Known Member

    注册日期:
    2017-12-01
    帖子:
    1,603
    支持:
    1,593
    性别:
    所在地:
    Norway
    Heritage Railway Volunteer:
    No I do not currently volunteer
    已获得S.A.C. Martin, Richard Roper, Gav106另外1人的支持.
  17. 49010

    49010 Well-Known Member

    注册日期:
    2012-04-23
    帖子:
    1,237
    支持:
    1,032
    性别:
    职业:
    Gentleman of Leisure
    所在地:
    Stockport
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I don't know if this is the right thread but.... I took advantage of the special offer on the new book The Patriots - vol 1 45500-45525 and I think it's fantastic.

    Landscape format, 4 or 5 pics for each loco in the range covered, many previously unpublished, most being of locos out on the road (personal grump here - so often books on locos feature almost entirely side on shots on shed which I find too static, I much prefer action shots), there's a particularly good shot of 45509 The Derbyshire Yeomanry at Millers Dale with masses of background details... how soon will Vol 2 be out ;)

    Well worth £20 of anyone's money......
     
    已获得240P15Richard RoperMatt37401的支持.
  18. Matt37401

    Matt37401 Nat Pres stalwart

    注册日期:
    2014-06-08
    帖子:
    15,551
    支持:
    11,955
    所在地:
    Wnxx
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Something to do with Patriots on the Patriot thread?! How dare you not take this thread off into some sort of drift! :)
     
    已获得andrewshimminGav10649010的支持.
  19. LMS2968

    LMS2968 Part of the furniture

    注册日期:
    2006-09-01
    帖子:
    3,072
    支持:
    5,361
    性别:
    职业:
    Lecturer retired: Archivist of Stanier Mogul Fund
    所在地:
    Wigan
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Ah yes, The Derby Yoyo, so called because it so often had to return to Derby Works...
     
    已获得andrewshimmin, bgw0166, andalfi1另外2人的支持.
  20. Richard Roper

    Richard Roper Well-Known Member

    注册日期:
    2006-05-22
    帖子:
    1,310
    支持:
    1,359
    性别:
    职业:
    Librarian
    所在地:
    Just up the road from 56E Sowerby Bridge
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I shall be hoping to acquire a copy at the Llangollen open-day tomorrow.
    Hopefully the second volume won't be out until The Unknown Warrior is complete and running! Thus the full story can then be told...

    Richard.
     

分享此页面