If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Swanage Railway General Discussion

Rasprava u 'Heritage Railways & Centres in the UK' pokrenuta od Rumpole, 10. Listopad 2012..

  1. Mogul

    Mogul Member

    Pridružen(a):
    2. Veljača 2016.
    Poruka:
    324
    Lajkova:
    687
    Spol:
    Muškarac
    Grad:
    Dorset
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Just to keep everyone up to date with the Motive power situation, SKP has arrived back on the premises after its brief visit to a wheel drop somewhere in south devon bringing the notionally available fleet to a healthy (by recent standards) four!
    Didn't stop to ask, but T9 looked to be on washout, Standard Spare, U in traffic. 257 continues to be worked on but not match fit yet.

    The 108 DMU is back in traffic on Green timetable days and running very well after some attention to a corridor connection.

    The P-way is standing up well to the heat and all in all people are getting ready for the onslaught of the school holidays. Bring it on!
     
    gz3xzf and NevilleKing like this.
  2. BR 73082

    BR 73082 Member

    Pridružen(a):
    8. Svibanj 2006.
    Poruka:
    956
    Lajkova:
    160
    Paid a brief visit on Saturday just gone (21st July) predominantly to do the SWR service. 33111 was out vice T9, staff suggested this was due to a fault with it. 31806 looked like it was being prepared for the dining train later in the day. Last SWR service back to Wareham was pretty much full which was good to see.
     
  3. Daddsie71b

    Daddsie71b Member Friend

    Pridružen(a):
    4. Travanj 2013.
    Poruka:
    943
    Lajkova:
    803
    Spol:
    Muškarac
    Grad:
    34091
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Yes, was there on Saturday. T9 worked early afternoon. Last SWR service standing room only.
     
  4. seawright

    seawright New Member

    Pridružen(a):
    30. Rujan 2012.
    Poruka:
    169
    Lajkova:
    26
    I note that industrial action by SWR has led to the cancellation of all services between Corfe Castle and Wareham today. Assuming that grievances are not resolved it would appear that 25th of August and 8th of September are the only remaining running days for this service.
     
  5. 30854

    30854 Resident of Nat Pres

    Pridružen(a):
    8. Ožujak 2017.
    Poruka:
    12,172
    Lajkova:
    11,496
    Spol:
    Muškarac
    Interesi:
    Retired
    Grad:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Will the 'missing' day be credited to the Swanage's total of Wareham running days?
     
  6. free2grice

    free2grice Part of the furniture Friend

    Pridružen(a):
    19. Rujan 2005.
    Poruka:
    5,626
    Lajkova:
    3,616
    Spol:
    Muškarac
    Interesi:
    Retired Rolls-Royce engineer
    Grad:
    Bath Green Park / Mangotsfield
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Service trains at present are in the hands of the Std tank (ex Swanage) and a class 33 (ex Norden) running 30 mins late.

    Possibly a problem with 31806. <BJ>
     
  7. ady

    ady Well-Known Member

    Pridružen(a):
    4. Srpanj 2006.
    Poruka:
    2,375
    Lajkova:
    285
    Spol:
    Muškarac
    Interesi:
    Post office
    Grad:
    South
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Oh Bother there no spear engines now is there?
     
  8. Gladiator 5076

    Gladiator 5076 Resident of Nat Pres

    Pridružen(a):
    2. Listopad 2015.
    Poruka:
    7,926
    Lajkova:
    6,661
    Spol:
    Muškarac
    Grad:
    Swanage
    Heritage Railway Volunteer:
    No I do not currently volunteer
    No issue, three rotating locos 31806,80104 and 33111 due to service trains having to use Platform 1 whilst the Steam Dreams tour occupies platform 2 and hence also the run round loop
     
    free2grice se sviđa ovo.
  9. Mogul

    Mogul Member

    Pridružen(a):
    2. Veljača 2016.
    Poruka:
    324
    Lajkova:
    687
    Spol:
    Muškarac
    Grad:
    Dorset
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Not as we speak. Two fit for traffic on a two loco timetable is not ideal. T9 is on washout and having attention to its main steam pipe. Fingers crossed this will be the quickest back. 257 is still undergoing commissioning work and hopefully not to far behind. SKP back from holiday in Devon but waiting for spare fitters.

    Just to up the fun quota, due to a problem with the water column one loco is taking water on shed and the other at the 'emergency supply' at Norden. These backup watering facilities deliver water much more slowly than the main column. Norden has a submersible pump and hose pipe. The shed tank has a much lower head of pressure so the water lazily flops in to the tender despite the 6" pipe. It takes really sharp footplate team work to unhook, get to the supply, take water and get back on the train and ready to go. A delay at either end tends to impact the other service when they pass at Harmans Cross. Despite this all advertised steam services (apart from charter day) still steam hauled and mostly on time. Swanage Carnival week in full flow. Staff and Volunteers to be congratulated.

    Latest issue of swanning around here let me know if the link doesn't works for you.
    http://srstaff.co.uk/swanningaround/swanningjul2418.pdf
     
    Last edited: 31. Srpanj 2018.
  10. ady

    ady Well-Known Member

    Pridružen(a):
    4. Srpanj 2006.
    Poruka:
    2,375
    Lajkova:
    285
    Spol:
    Muškarac
    Interesi:
    Post office
    Grad:
    South
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Hotdog might get more use yet then.
     
  11. cct man

    cct man Part of the furniture

    Pridružen(a):
    15. Siječanj 2007.
    Poruka:
    3,220
    Lajkova:
    49
    Interesi:
    CONSTRUCTION
    Grad:
    LONDON
    Not heard about the progress on N class 31874 recently after such a rapid start on the overhaul, is there a problem with this Loco?

    Kind regards
    Chris
     
  12. martin1656

    martin1656 Nat Pres stalwart Friend

    Pridružen(a):
    8. Prosinac 2014.
    Poruka:
    19,268
    Lajkova:
    12,518
    Spol:
    Muškarac
    Grad:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    As the bottom end is virtually complete I'm guessing its boiler related most likily extra work needed and that's raised the costs see this was the boiler with the BR era patch on the inner firebox side ,so most likily its needed new platework.
     
    cct man se sviđa ovo.
  13. Gladiator 5076

    Gladiator 5076 Resident of Nat Pres

    Pridružen(a):
    2. Listopad 2015.
    Poruka:
    7,926
    Lajkova:
    6,661
    Spol:
    Muškarac
    Grad:
    Swanage
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Not yet in service, but at least parked somewhere different to normal, 257 Squadron at Swanage on July 31st 2018. IMG_1303.JPG
     
  14. stephenvane

    stephenvane Member

    Pridružen(a):
    13. Rujan 2011.
    Poruka:
    526
    Lajkova:
    399
    Bottom half was completed some time ago and is in Herston works awaiting its boiler.

    Boiler is causing the delays. Not helped I believe by the original boiler contractor going bust.
     
    cct man se sviđa ovo.
  15. cct man

    cct man Part of the furniture

    Pridružen(a):
    15. Siječanj 2007.
    Poruka:
    3,220
    Lajkova:
    49
    Interesi:
    CONSTRUCTION
    Grad:
    LONDON
    Thank you martin, I am obliged to you

    Chris
     
  16. cct man

    cct man Part of the furniture

    Pridružen(a):
    15. Siječanj 2007.
    Poruka:
    3,220
    Lajkova:
    49
    Interesi:
    CONSTRUCTION
    Grad:
    LONDON
    Ans Stephan Vane, opologies for the omission.

    Chris
     
  17. johnofwessex

    johnofwessex Resident of Nat Pres

    Pridružen(a):
    6. Travanj 2015.
    Poruka:
    9,748
    Lajkova:
    7,860
    Spol:
    Muškarac
    Interesi:
    Thorn in my managers side
    Grad:
    72
    Heritage Railway Volunteer:
    No I do not currently volunteer
    That Ballast & lineside vegetation is very 'period'
     
  18. DcB

    DcB Well-Known Member

    Pridružen(a):
    5. Lipanj 2018.
    Poruka:
    1,488
    Lajkova:
    455
    Grad:
    Surrey
    Heritage Railway Volunteer:
    No I do not currently volunteer
    After yesterdays strike, talks are back on.
    Any news on the 2 DMUsthat are due back for main line certification and training for the 2019 season?

    From the 4TC unit website slow progress, but sadly will not be ready for 2019.
     
  19. Mogul

    Mogul Member

    Pridružen(a):
    2. Veljača 2016.
    Poruka:
    324
    Lajkova:
    687
    Spol:
    Muškarac
    Grad:
    Dorset
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There has been no substantial change in the DMU schedule that's been notified to us. Final assembly is progressing at Eastleigh with testing scheduled during Aug. All being well we should see them back at Swanage sometime in the autumn for our own testing and training program. There is an additional inspection pit going in at Corfe this winter to facilitate the FTR exams and then we will be then be at least physically ready then to operate the 2019 Wareham service. As always these days there is an amount of paperwork, compliance, exempting, consulting, licencing, timetabling, etc, etc, etc, also coming together.

    I've not looked at the TC website but the second coach is coming along after discovery of more tin worm than expected. Unfortunately Tin Worms like to dine on Cash for desert so a fundraising push will be needed for the third coach to get us to a 3TC.

    We have made a grant application for more MK1 rolling stock to be mainline certified in addition to the 5 we have already. Hopefully The N will come out main line equip as well if funding can be found for that. We will then be well placed for taking Steam off the branch in some form or other. Before anyone asks there are no solid plans for anything specific at this stage. We have enough on our plate at the moment and are taking this one step at a time.
     
  20. 45076

    45076 Member

    Pridružen(a):
    15. Rujan 2011.
    Poruka:
    478
    Lajkova:
    313
    Spol:
    Muškarac
    Interesi:
    Retired
    Grad:
    34004
    Heritage Railway Volunteer:
    No I do not currently volunteer

Podijelite ovu stranicu