If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Swanage Railway General Discussion

Dieses Thema im Forum 'Heritage Railways & Centres in the UK' wurde von Rumpole gestartet, 10 Oktober 2012.

  1. Mogul

    Mogul Member

    Registriert seit:
    2 Februar 2016
    Beiträge:
    324
    Zustimmungen:
    687
    Geschlecht:
    männlich
    Ort:
    Dorset
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Just to keep everyone up to date with the Motive power situation, SKP has arrived back on the premises after its brief visit to a wheel drop somewhere in south devon bringing the notionally available fleet to a healthy (by recent standards) four!
    Didn't stop to ask, but T9 looked to be on washout, Standard Spare, U in traffic. 257 continues to be worked on but not match fit yet.

    The 108 DMU is back in traffic on Green timetable days and running very well after some attention to a corridor connection.

    The P-way is standing up well to the heat and all in all people are getting ready for the onslaught of the school holidays. Bring it on!
     
    gz3xzf und NevilleKing gefällt dies.
  2. BR 73082

    BR 73082 Member

    Registriert seit:
    8 Mai 2006
    Beiträge:
    956
    Zustimmungen:
    160
    Paid a brief visit on Saturday just gone (21st July) predominantly to do the SWR service. 33111 was out vice T9, staff suggested this was due to a fault with it. 31806 looked like it was being prepared for the dining train later in the day. Last SWR service back to Wareham was pretty much full which was good to see.
     
  3. Daddsie71b

    Daddsie71b Member Friend

    Registriert seit:
    4 April 2013
    Beiträge:
    941
    Zustimmungen:
    803
    Geschlecht:
    männlich
    Ort:
    34091
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Yes, was there on Saturday. T9 worked early afternoon. Last SWR service standing room only.
     
  4. seawright

    seawright New Member

    Registriert seit:
    30 September 2012
    Beiträge:
    169
    Zustimmungen:
    26
    I note that industrial action by SWR has led to the cancellation of all services between Corfe Castle and Wareham today. Assuming that grievances are not resolved it would appear that 25th of August and 8th of September are the only remaining running days for this service.
     
  5. 30854

    30854 Resident of Nat Pres

    Registriert seit:
    8 März 2017
    Beiträge:
    12.172
    Zustimmungen:
    11.496
    Geschlecht:
    männlich
    Beruf:
    Retired
    Ort:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Will the 'missing' day be credited to the Swanage's total of Wareham running days?
     
  6. free2grice

    free2grice Part of the furniture Friend

    Registriert seit:
    19 September 2005
    Beiträge:
    5.625
    Zustimmungen:
    3.607
    Geschlecht:
    männlich
    Beruf:
    Retired Rolls-Royce engineer
    Ort:
    Bath Green Park / Mangotsfield
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Service trains at present are in the hands of the Std tank (ex Swanage) and a class 33 (ex Norden) running 30 mins late.

    Possibly a problem with 31806. <BJ>
     
  7. ady

    ady Well-Known Member

    Registriert seit:
    4 Juli 2006
    Beiträge:
    2.375
    Zustimmungen:
    285
    Geschlecht:
    männlich
    Beruf:
    Post office
    Ort:
    South
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Oh Bother there no spear engines now is there?
     
  8. Gladiator 5076

    Gladiator 5076 Resident of Nat Pres

    Registriert seit:
    2 Oktober 2015
    Beiträge:
    7.914
    Zustimmungen:
    6.647
    Geschlecht:
    männlich
    Ort:
    Swanage
    Heritage Railway Volunteer:
    No I do not currently volunteer
    No issue, three rotating locos 31806,80104 and 33111 due to service trains having to use Platform 1 whilst the Steam Dreams tour occupies platform 2 and hence also the run round loop
     
    free2grice gefällt dies.
  9. Mogul

    Mogul Member

    Registriert seit:
    2 Februar 2016
    Beiträge:
    324
    Zustimmungen:
    687
    Geschlecht:
    männlich
    Ort:
    Dorset
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Not as we speak. Two fit for traffic on a two loco timetable is not ideal. T9 is on washout and having attention to its main steam pipe. Fingers crossed this will be the quickest back. 257 is still undergoing commissioning work and hopefully not to far behind. SKP back from holiday in Devon but waiting for spare fitters.

    Just to up the fun quota, due to a problem with the water column one loco is taking water on shed and the other at the 'emergency supply' at Norden. These backup watering facilities deliver water much more slowly than the main column. Norden has a submersible pump and hose pipe. The shed tank has a much lower head of pressure so the water lazily flops in to the tender despite the 6" pipe. It takes really sharp footplate team work to unhook, get to the supply, take water and get back on the train and ready to go. A delay at either end tends to impact the other service when they pass at Harmans Cross. Despite this all advertised steam services (apart from charter day) still steam hauled and mostly on time. Swanage Carnival week in full flow. Staff and Volunteers to be congratulated.

    Latest issue of swanning around here let me know if the link doesn't works for you.
    http://srstaff.co.uk/swanningaround/swanningjul2418.pdf
     
    Last edited: 31 Juli 2018
  10. ady

    ady Well-Known Member

    Registriert seit:
    4 Juli 2006
    Beiträge:
    2.375
    Zustimmungen:
    285
    Geschlecht:
    männlich
    Beruf:
    Post office
    Ort:
    South
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Hotdog might get more use yet then.
     
  11. cct man

    cct man Part of the furniture

    Registriert seit:
    15 Januar 2007
    Beiträge:
    3.220
    Zustimmungen:
    49
    Beruf:
    CONSTRUCTION
    Ort:
    LONDON
    Not heard about the progress on N class 31874 recently after such a rapid start on the overhaul, is there a problem with this Loco?

    Kind regards
    Chris
     
  12. martin1656

    martin1656 Nat Pres stalwart Friend

    Registriert seit:
    8 Dezember 2014
    Beiträge:
    19.263
    Zustimmungen:
    12.514
    Geschlecht:
    männlich
    Ort:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    As the bottom end is virtually complete I'm guessing its boiler related most likily extra work needed and that's raised the costs see this was the boiler with the BR era patch on the inner firebox side ,so most likily its needed new platework.
     
    cct man gefällt dies.
  13. Gladiator 5076

    Gladiator 5076 Resident of Nat Pres

    Registriert seit:
    2 Oktober 2015
    Beiträge:
    7.914
    Zustimmungen:
    6.647
    Geschlecht:
    männlich
    Ort:
    Swanage
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Not yet in service, but at least parked somewhere different to normal, 257 Squadron at Swanage on July 31st 2018. IMG_1303.JPG
     
  14. stephenvane

    stephenvane Member

    Registriert seit:
    13 September 2011
    Beiträge:
    526
    Zustimmungen:
    399
    Bottom half was completed some time ago and is in Herston works awaiting its boiler.

    Boiler is causing the delays. Not helped I believe by the original boiler contractor going bust.
     
    cct man gefällt dies.
  15. cct man

    cct man Part of the furniture

    Registriert seit:
    15 Januar 2007
    Beiträge:
    3.220
    Zustimmungen:
    49
    Beruf:
    CONSTRUCTION
    Ort:
    LONDON
    Thank you martin, I am obliged to you

    Chris
     
  16. cct man

    cct man Part of the furniture

    Registriert seit:
    15 Januar 2007
    Beiträge:
    3.220
    Zustimmungen:
    49
    Beruf:
    CONSTRUCTION
    Ort:
    LONDON
    Ans Stephan Vane, opologies for the omission.

    Chris
     
  17. johnofwessex

    johnofwessex Resident of Nat Pres

    Registriert seit:
    6 April 2015
    Beiträge:
    9.748
    Zustimmungen:
    7.858
    Geschlecht:
    männlich
    Beruf:
    Thorn in my managers side
    Ort:
    72
    Heritage Railway Volunteer:
    No I do not currently volunteer
    That Ballast & lineside vegetation is very 'period'
     
  18. DcB

    DcB Well-Known Member

    Registriert seit:
    5 Juni 2018
    Beiträge:
    1.487
    Zustimmungen:
    455
    Ort:
    Surrey
    Heritage Railway Volunteer:
    No I do not currently volunteer
    After yesterdays strike, talks are back on.
    Any news on the 2 DMUsthat are due back for main line certification and training for the 2019 season?

    From the 4TC unit website slow progress, but sadly will not be ready for 2019.
     
  19. Mogul

    Mogul Member

    Registriert seit:
    2 Februar 2016
    Beiträge:
    324
    Zustimmungen:
    687
    Geschlecht:
    männlich
    Ort:
    Dorset
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There has been no substantial change in the DMU schedule that's been notified to us. Final assembly is progressing at Eastleigh with testing scheduled during Aug. All being well we should see them back at Swanage sometime in the autumn for our own testing and training program. There is an additional inspection pit going in at Corfe this winter to facilitate the FTR exams and then we will be then be at least physically ready then to operate the 2019 Wareham service. As always these days there is an amount of paperwork, compliance, exempting, consulting, licencing, timetabling, etc, etc, etc, also coming together.

    I've not looked at the TC website but the second coach is coming along after discovery of more tin worm than expected. Unfortunately Tin Worms like to dine on Cash for desert so a fundraising push will be needed for the third coach to get us to a 3TC.

    We have made a grant application for more MK1 rolling stock to be mainline certified in addition to the 5 we have already. Hopefully The N will come out main line equip as well if funding can be found for that. We will then be well placed for taking Steam off the branch in some form or other. Before anyone asks there are no solid plans for anything specific at this stage. We have enough on our plate at the moment and are taking this one step at a time.
     
  20. 45076

    45076 Member

    Registriert seit:
    15 September 2011
    Beiträge:
    478
    Zustimmungen:
    313
    Geschlecht:
    männlich
    Beruf:
    Retired
    Ort:
    34004
    Heritage Railway Volunteer:
    No I do not currently volunteer

Die Seite empfehlen