    Yes I am an active volunteer
    With Black 5 5428 now in traffic, the NYMR's loco works are moving on to their next project, which will be standard 4 4-6-0 75029. The main work required on it is the renewal of its copper firebox, which will be done in parallel with constructing an almost identical firebox for standard 4 2-6-4T 80135. A lot of preparatory work was carried out with the boiler in the frames, but the boiler has now been lifted from the frames for work to begin in earnest.

    With 1264, 5428, 926, 65894, 80136 and 76079 all in traffic with long boiler tickets plus 825, 63395, 29, 34101 92134 and Lucie set to join them over the coming year, the NYMR's motive power position is looking the healthiest it has been for many years.
     
  2. Richard Roper

    Richard Roper Well-Known Member

    إنضم إلينا في:
    ‏22 ماي 2006
    المشاركات:
    1,310
    عدد المعجبين:
    1,359
    الجنس:
    ذكر
    الوظيفة:
    Librarian
    مكان الإقامة:
    Just up the road from 56E Sowerby Bridge
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It will be nice to see 75029 out and about again... When was it last steamed? I saw it in May at the back of the shed, looking pretty weathered - But I know locos can weather pretty quickly outside at Grosmont!

    Richard.
     
  3. 5944

    5944 Resident of Nat Pres

    إنضم إلينا في:
    ‏14 يناير 2006
    المشاركات:
    8,863
    عدد المعجبين:
    9,262
    الجنس:
    ذكر
    الوظيفة:
    Train Maintainer for GTR at Hornsey
    مكان الإقامة:
    Letchworth
    Heritage Railway Volunteer:
    No I do not currently volunteer
    October 2015, so less than 3 years.
     
  4. Richard Roper

    Richard Roper Well-Known Member

    إنضم إلينا في:
    ‏22 ماي 2006
    المشاركات:
    1,310
    عدد المعجبين:
    1,359
    الجنس:
    ذكر
    الوظيفة:
    Librarian
    مكان الإقامة:
    Just up the road from 56E Sowerby Bridge
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Many Thanks for that info Sir!

    Richard.
     
  5. 61624

    61624 Part of the furniture

    إنضم إلينا في:
    ‏27 سبتمبر 2006
    المشاركات:
    5,294
    عدد المعجبين:
    3,599
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I believe it is hoped to return 75029 to traffic in 2020, but I think it may be quite an ambitious target considering the committment of the boiler shop to finishing 34101 and the mechanical team to 92134 - plus the fact that they will be doing two fireboxes in parallel.
     
  6. lil Bear

    lil Bear Part of the furniture

    إنضم إلينا في:
    ‏11 ديسمبر 2006
    المشاركات:
    6,136
    عدد المعجبين:
    1,700
    الجنس:
    ذكر
    الوظيفة:
    Railway Technician
    مكان الإقامة:
    8C / 5D / 27C / 71B
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    What's expected out from the works in 2019? S15 + 9F and the tram?
     
  7. Steve

    Steve Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏7 اكتوبر 2006
    المشاركات:
    12,729
    عدد المعجبين:
    11,847
    الوظيفة:
    Gentleman of leisure, nowadays
    مكان الإقامة:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    My money is on S15 825, LHJC 29 and Lucie. 92134 is in the frame but it will be towards the back end of the year.
     
    أعجب بهذه المشاركة lil Bear
  8. 61624

    61624 Part of the furniture

    إنضم إلينا في:
    ‏27 سبتمبر 2006
    المشاركات:
    5,294
    عدد المعجبين:
    3,599
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Work on 75029 seems to be progressing quickly (firebox patches about ready to be welded in) but the NYMR should be well off for locos this year so it would make sense to stagger the re-entry into traffic to 2020, when 34101 is also due to be finished.
     
    Hicks19862 و lil Bear معجبون بهذا.
  9. Steve

    Steve Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏7 اكتوبر 2006
    المشاركات:
    12,729
    عدد المعجبين:
    11,847
    الوظيفة:
    Gentleman of leisure, nowadays
    مكان الإقامة:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Post elsewhere by the NYMR boilersmith says he is hoping for 92134 in the next couple of months. That's a tall order but I hope he's right. Boiler cladding going on today.
     
    lil Bear و 26D_M معجبون بهذا.
  10. Andy2857

    Andy2857 Member

    إنضم إلينا في:
    ‏9 ديسمبر 2011
    المشاركات:
    632
    عدد المعجبين:
    296
    الجنس:
    ذكر
    مكان الإقامة:
    Wolverhampton/Sheffield
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There has been some outstanding restoration and overhaul work going on at Grosmont over the last couple of years (at least!) . The quality and pace of work done is very impressive and their engagement with the "outside world", especially through the MPD page on Facebook, is admirable.
     
    Mick45305, The Black Hat, DeccerGW و 6 آخرون معجبون بهذا.
  11. lil Bear

    lil Bear Part of the furniture

    إنضم إلينا في:
    ‏11 ديسمبر 2006
    المشاركات:
    6,136
    عدد المعجبين:
    1,700
    الجنس:
    ذكر
    الوظيفة:
    Railway Technician
    مكان الإقامة:
    8C / 5D / 27C / 71B
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    With all this progress, one would hope a concentrated effort can be made on Vera in the not too distant future ! That is one loco I remember from my childhood.
    http://dameveralynn.co.uk
     
  12. 61624

    61624 Part of the furniture

    إنضم إلينا في:
    ‏27 سبتمبر 2006
    المشاركات:
    5,294
    عدد المعجبين:
    3,599
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Latest news seems to be that the boiler and firebox are proving to be better than expected, and there is around £140,000 in the appeal fund, so a reasonable amount already there when expenditure starts. Contributions still welcome, though!

    Due to better than expected results last year work (previously suspended for lack of budget) on 75029's boiler/firebox repair and 80135's new firebox has been funded and is proceeding.
     