If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Brighton Atlantic: 32424 Beachy Head

الموضوع في 'Steam Traction' بواسطة Maunsell man, بتاريخ ‏20 اكتوبر 2009.

  1. S.A.C. Martin

    S.A.C. Martin Part of the furniture

    إنضم إلينا في:
    ‏31 أوت 2010
    المشاركات:
    5,615
    عدد المعجبين:
    9,418
    الجنس:
    ذكر
    الوظيفة:
    Asset Engineer (Signalling), MNLPS Treasurer
    مكان الإقامة:
    London
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    That is very interesting! So in theory - if true - Beachy Head could be this boilers first loco?

    That puts a rather different, rather beautiful slant to it.
     
  2. andrewshimmin

    andrewshimmin Well-Known Member

    إنضم إلينا في:
    ‏18 مارس 2011
    المشاركات:
    1,770
    عدد المعجبين:
    2,170
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It is entirely authentic steam-era railway accounting. In a way, it is preserving an important part of railway operation....
     
  3. Miff

    Miff Part of the furniture Friend

    إنضم إلينا في:
    ‏17 جوان 2008
    المشاركات:
    3,000
    عدد المعجبين:
    3,023
    I doubt it - unless the Bluebell are accounting for it from the ‘wrong’ budget :)

    It’s a brand new locomotive - isn’t that brilliant?
     
    أعجب بهذه المشاركة S.A.C. Martin
  4. andrewshimmin

    andrewshimmin Well-Known Member

    إنضم إلينا في:
    ‏18 مارس 2011
    المشاركات:
    1,770
    عدد المعجبين:
    2,170
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It is indeed. I can't wait. I love Atlantics, too
    But "real" railways often accounted brand new locos as rebuilds. The LNWR was always at it, for example. There are several well known examples of the "rebuild" entering service before the "scrapped" loco had been touched. One LNER pacific "rebuild" passed its alleged former self outside the works...
    It's all to do with revenue, capital and tax...
    At Crewe, a "rebuild" or "renewal" sometimes consisted of engine into works, new engine built, shift a few bits of expensive non-ferrous across (even number plates would be new), old engine dismantled, new engine out of the door.
    People who don't get this often get very excited about the "rebuilt" Scots and Patriots, but by Crewe standards that was just a heavy overhaul.
     
    Last edited: ‏6 أوت 2018
    Bluenosejohn, jnc و Miff معجبون بهذا.
  5. Miff

    Miff Part of the furniture Friend

    إنضم إلينا في:
    ‏17 جوان 2008
    المشاركات:
    3,000
    عدد المعجبين:
    3,023
    There’s also the myth that it was done to ‘fool’ the accountants whereas I reckon they always knew.
     
    andrewshimmin و jnc معجبون بهذا.
  6. S.A.C. Martin

    S.A.C. Martin Part of the furniture

    إنضم إلينا في:
    ‏31 أوت 2010
    المشاركات:
    5,615
    عدد المعجبين:
    9,418
    الجنس:
    ذكر
    الوظيفة:
    Asset Engineer (Signalling), MNLPS Treasurer
    مكان الإقامة:
    London
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    This is apparently true for Merry Hampton...and Great Northern, given her original frames were passed on shortly after she was dismantled for rebuilding into the A1/1 (in reality only the tender, driving wheels, some bits off the cab and the cartazzi arrangement survived).

    Does make you realise that these railways were not an enthusiasts' paradise, they were working railways.
     
    ragl و Bluenosejohn معجبون بهذا.
  7. Enterprise

    Enterprise Part of the furniture

    إنضم إلينا في:
    ‏9 سبتمبر 2005
    المشاركات:
    5,472
    عدد المعجبين:
    3,302
    They were both!
     
    Bluenosejohn و S.A.C. Martin معجبون بهذا.
  8. S.A.C. Martin

    S.A.C. Martin Part of the furniture

    إنضم إلينا في:
    ‏31 أوت 2010
    المشاركات:
    5,615
    عدد المعجبين:
    9,418
    الجنس:
    ذكر
    الوظيفة:
    Asset Engineer (Signalling), MNLPS Treasurer
    مكان الإقامة:
    London
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I stand corrected. :)
     
  9. huochemi

    huochemi Part of the furniture

    إنضم إلينا في:
    ‏6 ماي 2008
    المشاركات:
    2,995
    عدد المعجبين:
    1,515
    الجنس:
    ذكر
    مكان الإقامة:
    UK
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I think the accounting/reporting for the pre-nationalised railways was done to a detailed statutory schedule. I am not sure I fully understand the "renewals" concept but it seems as though the capital expenditure line may have been reserved for expansion capex. Thus the GWR Kings for instance appear to have been entirely classified as renewals rather than capex, and some at least of their external contractor-built locos were also considered renewals. I assume the renewals fund was effectively a different name for what would otherwise be part of the depreciation balance, but I have not got to the bottom of that. I don't think tax was a big driver (at least not latterly) as the Big Four were generally not in a tax-paying position.
     
    أعجب بهذه المشاركة andrewshimmin
  10. class8mikado

    class8mikado Part of the furniture

    إنضم إلينا في:
    ‏1 جوان 2009
    المشاركات:
    3,840
    عدد المعجبين:
    1,644
    الوظيفة:
    Print Estimator/ Repository of Useless Informatio.
    مكان الإقامة:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Easier to convince a board to sanction a renewal work budget as this would seem to be an on going necessity / overhead rather than new items which might be seen as less so without a worked up case of cost benefit.
     
    أعجب بهذه المشاركة andrewshimmin
  11. Jimc

    Jimc Part of the furniture

    إنضم إلينا في:
    ‏8 سبتمبر 2005
    المشاركات:
    4,117
    عدد المعجبين:
    4,821
    الوظيفة:
    Once computers, now part time writer I suppose.
    مكان الإقامة:
    SE England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    That's pretty much my understanding. I looked up renewal in 18th/19thC dictionaries on line, and in those days its meaning was much more like "replace with new" rather than "repair like new". In the 19thC a life expired 2-2-2 would be replaced with a new 2-2-2, and if there were parts of the old one that could be reused, well that was a bit of a saving. Once they were replacing 4-2-2s with 4-6-0s it got rather more complicated of course.

    Where budgets came into it was that repairs had to be paid for out of revenue. So if there was very little revenue it was a considerable advantage if a major rebuild could be classified as a renewal. This is often - and I've been guilty of it myself - presented as an attempt to fool the accountants, but on reflection I think it much more likely that the accountants knew exactly what was going on.
     
    Last edited: ‏7 أوت 2018
    Jamessquared, andrewshimmin و Bluenosejohn معجبون بهذا.
  12. 35B

    35B Nat Pres stalwart

    إنضم إلينا في:
    ‏18 جوان 2011
    المشاركات:
    28,731
    عدد المعجبين:
    28,657
    الجنس:
    ذكر
    مكان الإقامة:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I seem to remember reading somewhere - I think about the Festiniog Railway - that the accounting definition of the value of a company was very different in that era, and much more tightly aligned to the face value of the shares than is now the case. I imagine that this would have required considerable care over definitions of work, and how they affected the value of the company.
     
    أعجب بهذه المشاركة andrewshimmin
  13. LMS2968

    LMS2968 Part of the furniture

    إنضم إلينا في:
    ‏1 سبتمبر 2006
    المشاركات:
    3,072
    عدد المعجبين:
    5,361
    الجنس:
    ذكر
    الوظيفة:
    Lecturer retired: Archivist of Stanier Mogul Fund
    مكان الإقامة:
    Wigan
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The LNWR - and others - ordered new locos through either the Capital or Revenue Accounts. Basically, Capital engines were new in all senses of the word, while Revenue engines would each replace and existing engine, and so not add to the number of engines in stock. 'Capital' engines would receive new numbers in sequence as each engine entered traffic; 'Revenue' engines would take on the number of the displaced engine. Since the new engine might have absolutely nothing in common with its predecessor, Revenue engines' numbers followed no pattern and explains the LNWR's apparently random numbering system.
     
    andrewshimmin, oddsocks, Bluenosejohn و 1 شخص آخر معجبون بهذا.
  14. Jamessquared

    Jamessquared Nat Pres stalwart

    إنضم إلينا في:
    ‏8 مارس 2008
    المشاركات:
    27,790
    عدد المعجبين:
    64,454
    مكان الإقامة:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    You could replace "LNWR" with "LSWR" in the above and not substantially change anything else - least of all the erratic numbering sequence. In the days before having formal duplicate lists, if an engine was renewed but the old engine had a continuing existence, you'd have engines referred to as e.g. "Bison" (current capital stock loco) and "the old engine Bison" (duplicate stock loco).

    It's struck me that in the 100 year period between the Stockton and Darlington Railway and the Grouping, not only did modern railways develop into something of a recognisably modern form, but so did modern companies. I've always wondered to what extent the railways - as amongst the largest enterprises then in existence - drove development of modern methods / understanding of accounting and company structure.

    Tom
     
    domeyhead, jnc, Richard Roper و 3 آخرون معجبون بهذا.
  15. andrewshimmin

    andrewshimmin Well-Known Member

    إنضم إلينا في:
    ‏18 مارس 2011
    المشاركات:
    1,770
    عدد المعجبين:
    2,170
    Heritage Railway Volunteer:
    No I do not currently volunteer
    @Jamessquared The railway companies were utterly formative in terms of the modern understanding of what a company is.
    In G. Stevenson's day, when people thought of a company, they thought of the East India Company or the Hudson's Bay Company.
    The railway companies were the largest joint stock companies in Britain and many other countries, and had the sort of structures and systems we would now recognise - lots of shareholders, a board led by a chairman, general managers separate from the chairman, departments with internal responsibility and organisation, annual budgets, operation and maintenance processes, defined prices for their services, fixed and moveable assets.... The list could go on.
     
    domeyhead, S.A.C. Martin, MellishR و 3 آخرون معجبون بهذا.
  16. Jamessquared

    Jamessquared Nat Pres stalwart

    إنضم إلينا في:
    ‏8 مارس 2008
    المشاركات:
    27,790
    عدد المعجبين:
    64,454
    مكان الإقامة:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Latest update:

    http://www.bluebell-railway.co.uk/bluebell/locos/atlantic/latest.html

    Boiler and tender out of the works, and discussion of construction of the tender tank amongst other things. The crane lift shown was the same day that 84030 was rewheeled - one of the unseen facets of these kind of project is is the interdependencies on other projects.

    Tom
     
  17. Dan Hamblin

    Dan Hamblin Part of the furniture

    إنضم إلينا في:
    ‏27 مارس 2006
    المشاركات:
    2,549
    عدد المعجبين:
    190
    الوظيفة:
    Rolling Stock Engineer
    مكان الإقامة:
    Kent
    Good to see more progress, hopefully will get the chance to view it tomorrow as part of the Shareholders Weekend as Atlantic House will be open.

    Regards,

    Dan
     
    S.A.C. Martin و Jamessquared معجبون بهذا.
  18. WishIHadAName

    WishIHadAName New Member

    إنضم إلينا في:
    ‏7 أوت 2013
    المشاركات:
    199
    عدد المعجبين:
    176
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    How come its getting air brakes?
     
  19. Jamessquared

    Jamessquared Nat Pres stalwart

    إنضم إلينا في:
    ‏8 مارس 2008
    المشاركات:
    27,790
    عدد المعجبين:
    64,454
    مكان الإقامة:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Because the original had air brakes - the LBSCR was an air-braked line.

    The reverser is also power-assisted using compressed air.

    Tom
     
  20. misspentyouth62

    misspentyouth62 Well-Known Member

    إنضم إلينا في:
    ‏8 نوفمبر 2017
    المشاركات:
    1,717
    عدد المعجبين:
    2,221
    الجنس:
    ذكر
    مكان الإقامة:
    34D, now flexible
    Heritage Railway Volunteer:
    No I do not currently volunteer

مشاركة هذه الصفحة