If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Current and Proposed New-Builds

الموضوع في 'Steam Traction' بواسطة aron33, بتاريخ ‏15 أوت 2017.

  1. S.A.C. Martin

    S.A.C. Martin Part of the furniture

    إنضم إلينا في:
    ‏31 أوت 2010
    المشاركات:
    5,615
    عدد المعجبين:
    9,418
    الجنس:
    ذكر
    الوظيفة:
    Asset Engineer (Signalling), MNLPS Treasurer
    مكان الإقامة:
    London
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Two words.

    Tiger.

    Yes.
     
  2. Hermod

    Hermod Well-Known Member

    إنضم إلينا في:
    ‏6 ماي 2017
    المشاركات:
    1,110
    عدد المعجبين:
    317
    الجنس:
    ذكر
    مكان الإقامة:
    Klitmoeller,Denmark
    Heritage Railway Volunteer:
    No I do not currently volunteer
    What was an A5?
     
    أعجب بهذه المشاركة Black Jim
  3. Jamessquared

    Jamessquared Nat Pres stalwart

    إنضم إلينا في:
    ‏8 مارس 2008
    المشاركات:
    27,803
    عدد المعجبين:
    64,500
    مكان الإقامة:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    S.A.C. Martin و 240P15 معجبون بهذا.
  4. Hermod

    Hermod Well-Known Member

    إنضم إلينا في:
    ‏6 ماي 2017
    المشاركات:
    1,110
    عدد المعجبين:
    317
    الجنس:
    ذكر
    مكان الإقامة:
    Klitmoeller,Denmark
    Heritage Railway Volunteer:
    No I do not currently volunteer
  5. TonyMay

    TonyMay Member

    إنضم إلينا في:
    ‏2 فبراير 2010
    المشاركات:
    559
    عدد المعجبين:
    76
    An A5 would have a historical connection with today's preserved GCR and would be efficient for heritage operations, unlike other new build pacific projects based there.
     
    أعجب بهذه المشاركة andrewshimmin
  6. ghost

    ghost Part of the furniture

    إنضم إلينا في:
    ‏29 ماي 2006
    المشاركات:
    4,306
    عدد المعجبين:
    5,737
    الجنس:
    ذكر
    مكان الإقامة:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Which pacifics would those be?
    The only new build I can think of that is connected to the GCR is 567, which is a 4-4-0 and actually based at GCR(N)

    Keith
     
    2392 و 240P15 معجبون بهذا.
  7. Gav106

    Gav106 Well-Known Member

    إنضم إلينا في:
    ‏29 مارس 2010
    المشاركات:
    1,772
    عدد المعجبين:
    2,170
    مكان الإقامة:
    Nantwich, Cheshire
    It was stated that Hengist was to be based their once it had become a rolling chassis. I'm not sure if that is still the case?!?
     
  8. ghost

    ghost Part of the furniture

    إنضم إلينا في:
    ‏29 ماي 2006
    المشاركات:
    4,306
    عدد المعجبين:
    5,737
    الجنس:
    ذكر
    مكان الإقامة:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Members of the 72010 group could answer with more authority, but there's no longer any mention of the GCR as a base on their website and they've moved everything from the GCR to their contractor in Sheffield. They also plan to fit a Sheffield shedcode in reference to the build location.

    Keith
     
    Sheff, Black Jim و Gav106 معجبون بهذا.
  9. Black Jim

    Black Jim Member

    إنضم إلينا في:
    ‏21 اكتوبر 2009
    المشاركات:
    468
    عدد المعجبين:
    166
    I agree , fabulous.
     
    أعجب بهذه المشاركة 240P15
  10. aron33

    aron33 Member

    إنضم إلينا في:
    ‏22 ماي 2016
    المشاركات:
    517
    عدد المعجبين:
    630
    الجنس:
    ذكر
    الوظيفة:
    Food packaging worker
    مكان الإقامة:
    Mayfield, KY (USA)
    Heritage Railway Volunteer:
    No I do not currently volunteer
    An A5? Definitely YES!! The GCR would be an excellent homebase for a newbuild A5.[​IMG]
     
    andrewshimmin, Kinghambranch, 240P15 و 1 شخص آخر معجبون بهذا.
  11. clinker

    clinker Member

    إنضم إلينا في:
    ‏8 اكتوبر 2016
    المشاركات:
    612
    عدد المعجبين:
    372
    الجنس:
    ذكر
    مكان الإقامة:
    romford
    Heritage Railway Volunteer:
    No I do not currently volunteer
    That is stunning, it's almost a B12 as a tank engine
     
    أعجب بهذه المشاركة 240P15
  12. pete2hogs

    pete2hogs Member

    إنضم إلينا في:
    ‏16 اكتوبر 2007
    المشاركات:
    721
    عدد المعجبين:
    418
  13. andrewshimmin

    andrewshimmin Well-Known Member

    إنضم إلينا في:
    ‏18 مارس 2011
    المشاركات:
    1,770
    عدد المعجبين:
    2,170
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I'm a passionate Horwichite and big fan of Hughes. But I think the 4-6-4T would be useless: far too heavy and coal guzzling. They were replaced by Fowler 2-6-4Ts for a reason!
    The Furness one (or a Brighton Baltic) might be more useful, and would have the distinction of coming from a railway for which we have no "modern" locos preserved (only some very early ones).
     
    pete2hogs, jnc و Monkey Magic معجبون بهذا.
  14. Sheff

    Sheff Resident of Nat Pres

    إنضم إلينا في:
    ‏21 إبريل 2006
    المشاركات:
    8,059
    عدد المعجبين:
    3,138
    الجنس:
    ذكر
    الوظيفة:
    Retired Engineer & Heritage Volunteer
    مكان الإقامة:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I'd love to see a big L&Y or GC loco - but suitably 'modernised' to cure their insatiable appetites for the black stuff!
     
    240P15, Allegheny و Gav106 معجبون بهذا.
  15. Jamessquared

    Jamessquared Nat Pres stalwart

    إنضم إلينا في:
    ‏8 مارس 2008
    المشاركات:
    27,803
    عدد المعجبين:
    64,500
    مكان الإقامة:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Just a thought about this. Relative to their time in original service, heritage locos spend a disproportionately large proportion of their time burning coal while stationary: lighting up and cooling down (because of intermittent duty cycles, and short daily mileages); and even express locos spend far more of their time running round relative to the long sustained work they would originally have done. (As an example on the Bluebell, in a typical three trip, 66 mile daily duty, the regulator is only open for about two hours. For the other ten hours of the day, the regulator is shut, either stationary or coasting).

    The locos also run slowly. One historic cause of high coal consumption was a constricted front end; however, at low speeds, the valves are open for longer duration, so that issue is far less important - for the same cut off, the valves are open three times longer in time at 25mph than at 75mph.

    Given that, I suspect that the gains from "modernising" are rather less than you might hope. Put bluntly, you can have the most efficient front end in history but it won't save any coal while standing still - which is pretty much what locos on heritage lines do most of the time.

    Tom
     
    oddsocks, andrewshimmin, ragl و 6 آخرون معجبون بهذا.
  16. Sheff

    Sheff Resident of Nat Pres

    إنضم إلينا في:
    ‏21 إبريل 2006
    المشاركات:
    8,059
    عدد المعجبين:
    3,138
    الجنس:
    ذكر
    الوظيفة:
    Retired Engineer & Heritage Volunteer
    مكان الإقامة:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I take your ;point, but who's thinking of only heritage line operation ;)
     
  17. 8126

    8126 Member

    إنضم إلينا في:
    ‏17 مارس 2014
    المشاركات:
    831
    عدد المعجبين:
    976
    الجنس:
    ذكر
    I agree with most of that, but I seem to remember the big L&Y engines at least suffered horrendously from leaking piston valves, both past the rings and through the ball valves in the valve heads intended to give free coasting, like a slide valve. They'd leave the shops in reasonable nick and within short order the crews would be piling the tenders high with coal to make the same runs, as also happened with the Royal Scots as-built. In the case of the 4-6-0s, they got standard narrow ring piston valves shortly before the LMS scrapped them all and were much improved, but rather too late.

    Losses past the valves are just a function of steamchest pressure, which again I guess probably isn't very high on heritage lines, but if I were doing a new build of anything (which, barring miracles, I will not be), I'd be tempted to go to town on the piston, valve and lubrication design to minimise losses and (more importantly) increase the interval between valve and piston exams.
     
    أعجب بهذه المشاركة Jamessquared
  18. Jamessquared

    Jamessquared Nat Pres stalwart

    إنضم إلينا في:
    ‏8 مارس 2008
    المشاركات:
    27,803
    عدد المعجبين:
    64,500
    مكان الإقامة:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Indeed, there is far more money to be saved increasing mileage between repairs (planned or otherwise) than in coal dodging. If you could change the interval between p&v exams from say 20k miles to 30k miles while maintaining the same reliability otherwise would allow cutting one whole p&v exam out of a nominal ten year cycle, which would be a substantial saving.

    Tom
     
    أعجب بهذه المشاركة RLinkinS
  19. RLinkinS

    RLinkinS Member

    إنضم إلينا في:
    ‏8 نوفمبر 2008
    المشاركات:
    982
    عدد المعجبين:
    972
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I wonder if there is an opportunity here to develop steam loco technology in this area. Lubrication and materials are the areas that would need to be investigated. Perhaps here is something to be learned from internal combustion engine technology where mileages achieved by engines has drastically increased in the last 50 years. is enough attention paid to surface finish on rings and bores?
     
  20. JayDee

    JayDee Member

    إنضم إلينا في:
    ‏15 ديسمبر 2017
    المشاركات:
    354
    عدد المعجبين:
    272
    الجنس:
    ذكر
    مكان الإقامة:
    Swadlincote
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    If I remember rightly, Porta tried that on the Rio Turbio and would continue to advocate for disel style piston rings on his designs including the Cuban engine designed to be mostly welded together in a shed...
     
    أعجب بهذه المشاركة ragl

مشاركة هذه الصفحة