If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Tornado

Discuție în 'Steam Traction' creată de Leander's Shovel, 20 Oct 2007.

  1. Spamcan81

    Spamcan81 Nat Pres stalwart

    Înscris:
    25 Aug 2007
    Mesaje:
    35.834
    Aprecieri primite:
    22.272
    Ocupație:
    Training moles
    Locație:
    The back of beyond
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Harsh but fair. :)
     
    Jamessquared, LMS2968, 35B și încă o persoană apreciază asta.
  2. S.A.C. Martin

    S.A.C. Martin Part of the furniture

    Înscris:
    31 Aug 2010
    Mesaje:
    5.615
    Aprecieri primite:
    9.418
    Sex:
    Masculin
    Ocupație:
    Asset Engineer (Signalling), MNLPS Treasurer
    Locație:
    London
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Shots fired!

    On aside note ladies and gents - one of things that I am acutely aware of these days is that with ETCS (European Train Control Systems) issues on the horizon, we have to get our thinking caps on for everyone in the industry. The equipment is currently not cheap, it's not small, it will likely rule out tank engines at this stage. Tornado has an advantage in her tender setup (see space for additional control systems) but other locomotives will need to be retrofitted.

    See the latest SR for a short article on this - there is within its words an indication that NWR are going to help with the costs for a select few owners for fitting.

    The question I want to pose is - are we overthinking the ETCS issue? We are very hung up on fitting it in its entirety to the locomotive, when all locomotives do run with a support coach of some form. Is a compromise arrangement possible I wonder by having the majority of the electrical equipment in the coach instead of on the locomotive? This could allow multiple locomotives to be wired up to work with one specific coach as opposed paying out for multiple amounts of equipment on every locomotive.
     
    Sunnieboy, RalphW și jnc apreciază asta.
  3. The Green Howards

    The Green Howards Nat Pres stalwart

    Înscris:
    20 Feb 2016
    Mesaje:
    15.107
    Aprecieri primite:
    8.634
    Ocupație:
    Layabout
    Locație:
    My settee, mostly.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    What if one owner wants to run two locomotives on two different trains? Does every loco have a dedicated support coach?

    As an aside, just how big is the ETCS equipment? Is it all 19" rack mount kit?
     
  4. S.A.C. Martin

    S.A.C. Martin Part of the furniture

    Înscris:
    31 Aug 2010
    Mesaje:
    5.615
    Aprecieri primite:
    9.418
    Sex:
    Masculin
    Ocupație:
    Asset Engineer (Signalling), MNLPS Treasurer
    Locație:
    London
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Absolutely. These are the questions we need to ask. But off the top of my head, almost all of the big locos do run with a specific support coach - and there is a group support coach for some of the TOCs.

    The annoying answer is "it depends" - currently I reckon we are talking 19" rack mount or similar. See here for an example ETCS Siemens - to me, it looks like standardising it to a set size/setup for all of the different steam locomotives we have looks very unlikely.

    But if put into a coach...
     
  5. Big Al

    Big Al Nat Pres stalwart Staff Member Moderator

    Înscris:
    30 Mai 2009
    Mesaje:
    22.591
    Aprecieri primite:
    22.721
    Locație:
    1016
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Cruel....and fortunately for my keyboard, a cup of tea was not in my hand as I read this. :D
     
    MarkinDurham și The Green Howards apreciază asta.
  6. 240P15

    240P15 Well-Known Member

    Înscris:
    1 Dec 2017
    Mesaje:
    1.603
    Aprecieri primite:
    1.593
    Sex:
    Masculin
    Locație:
    Norway
    Heritage Railway Volunteer:
    No I do not currently volunteer

    I thought many mainline locos already had such equipment (inside their cab)?
    But I`m not en technical expert at all.

    Knut:)
     
  7. S.A.C. Martin

    S.A.C. Martin Part of the furniture

    Înscris:
    31 Aug 2010
    Mesaje:
    5.615
    Aprecieri primite:
    9.418
    Sex:
    Masculin
    Ocupație:
    Asset Engineer (Signalling), MNLPS Treasurer
    Locație:
    London
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    They do have some of the signalling equipment required, but not to ETCS standard yet - but if you wanted to fit all of the systems required to smaller locomotives (see Pannier tank on the mainline) it becomes an issue. In addition, cost of fitting it to each locomotive in future could be prohibitive.
     
  8. The Green Howards

    The Green Howards Nat Pres stalwart

    Înscris:
    20 Feb 2016
    Mesaje:
    15.107
    Aprecieri primite:
    8.634
    Ocupație:
    Layabout
    Locație:
    My settee, mostly.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    They have, AIUI, TPWS - which of course fell over on Tornado just as she was due to head along the S&C on The North Briton.
     
    S.A.C. Martin și 240P15 apreciază asta.
  9. The Green Howards

    The Green Howards Nat Pres stalwart

    Înscris:
    20 Feb 2016
    Mesaje:
    15.107
    Aprecieri primite:
    8.634
    Ocupație:
    Layabout
    Locație:
    My settee, mostly.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    My HP lapdog has a liquid-proof keyboard for just such occasions :D
     
    240P15 apreciază asta.
  10. Spamcan81

    Spamcan81 Nat Pres stalwart

    Înscris:
    25 Aug 2007
    Mesaje:
    35.834
    Aprecieri primite:
    22.272
    Ocupație:
    Training moles
    Locație:
    The back of beyond
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Your dog has a keyboard? :eek:
     
    MellishR și Bean-counter apreciază asta.
  11. The Green Howards

    The Green Howards Nat Pres stalwart

    Înscris:
    20 Feb 2016
    Mesaje:
    15.107
    Aprecieri primite:
    8.634
    Ocupație:
    Layabout
    Locație:
    My settee, mostly.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Woof!
     
  12. martin1656

    martin1656 Nat Pres stalwart Friend

    Înscris:
    8 Dec 2014
    Mesaje:
    19.264
    Aprecieri primite:
    12.516
    Sex:
    Masculin
    Locație:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    So whats his , or her favourite engine, The Duke Dog?
     
  13. 240P15

    240P15 Well-Known Member

    Înscris:
    1 Dec 2017
    Mesaje:
    1.603
    Aprecieri primite:
    1.593
    Sex:
    Masculin
    Locație:
    Norway
    Heritage Railway Volunteer:
    No I do not currently volunteer

    Deleted
     
    Last edited: 24 Noi 2018
    S.A.C. Martin apreciază asta.
  14. big.stu

    big.stu Well-Known Member

    Înscris:
    5 Mai 2008
    Mesaje:
    1.195
    Aprecieri primite:
    2.113
    Sex:
    Masculin
    Ocupație:
    Software Engineer
    Locație:
    Cambridge
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The problem then is that the connection to the support coach presumably becomes part of the FTR, so you have introduced even more complexity and potential failure points.

    (Edited to add that turning locos on turntables then becomes a logistical and paperwork nightmare!)
     
    Last edited: 12 Noi 2018
    MellishR și S.A.C. Martin apreciază asta.
  15. S.A.C. Martin

    S.A.C. Martin Part of the furniture

    Înscris:
    31 Aug 2010
    Mesaje:
    5.615
    Aprecieri primite:
    9.418
    Sex:
    Masculin
    Ocupație:
    Asset Engineer (Signalling), MNLPS Treasurer
    Locație:
    London
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Absolutely fair point.
     
  16. The Green Howards

    The Green Howards Nat Pres stalwart

    Înscris:
    20 Feb 2016
    Mesaje:
    15.107
    Aprecieri primite:
    8.634
    Ocupație:
    Layabout
    Locație:
    My settee, mostly.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thanks, Simon - what I see there is approximately 11U (484mm) height of equipment, of indeterminate depth (and that's some serious earth bonding going on there!:eek:). So you're looking at most likely a 2' cube to "lose" somewhere, I expect it will have some sort of UPS arrangement as well... not easy without eating into coal/water space I reckon, the footplate (or under it) would probably be a bit of a squeeze.
     
    S.A.C. Martin apreciază asta.
  17. The Green Howards

    The Green Howards Nat Pres stalwart

    Înscris:
    20 Feb 2016
    Mesaje:
    15.107
    Aprecieri primite:
    8.634
    Ocupație:
    Layabout
    Locație:
    My settee, mostly.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    26054 Pluto, of course!
     
    240P15 apreciază asta.
  18. The Green Howards

    The Green Howards Nat Pres stalwart

    Înscris:
    20 Feb 2016
    Mesaje:
    15.107
    Aprecieri primite:
    8.634
    Ocupație:
    Layabout
    Locație:
    My settee, mostly.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    But would it be any worse than connections twixt engine and tender? You only need duplicate the connections at each end of the support coach using Simon's suggestion. Of course, you'd end up adding a connection so you could separate loco from tender...
     
  19. big.stu

    big.stu Well-Known Member

    Înscris:
    5 Mai 2008
    Mesaje:
    1.195
    Aprecieri primite:
    2.113
    Sex:
    Masculin
    Ocupație:
    Software Engineer
    Locație:
    Cambridge
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Yes, but you now have two intermediate connections where you previously only had one (loco <-> tender <-> support coach) and connectors are always vulnerable to unreliability issues. Then consider that you have to disconnect the support coach to turn the loco on a turntable. You now have to re-test at least a significant subset of the FTR.
     
    S.A.C. Martin apreciază asta.
  20. S.A.C. Martin

    S.A.C. Martin Part of the furniture

    Înscris:
    31 Aug 2010
    Mesaje:
    5.615
    Aprecieri primite:
    9.418
    Sex:
    Masculin
    Ocupație:
    Asset Engineer (Signalling), MNLPS Treasurer
    Locație:
    London
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The issues seem to me to be the following:

    1. Cost of the ETCS equipment

    This at the moment is in the millions - NWR have offered to pay for some locomotives to be trial fitted at this stage. Which ones - who knows. Point 1 may render the rest of the points redundant.

    Solution - who knows

    2. Size of equipment

    On larger tender engines such as Tornado, possible to retrofit in existing superstructure of tender - anywhere else, I wonder if space will be an issue - certainly a big issue for the tank engines.

    Solution - for tank engines - fit on support coach, potentially.

    3. FTR

    Stu has rightly pointed out that by adding complexity to the setup and more connections we introduce a more complicated setup to the FTR - and more issues when it comes to the loco/support coach issue for running round, etc.

    So the equipment has to become both cheaper and smaller in time. It will - in theory - but right now...hmmm.
     

Distribuie pagina asta