If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

York Yuletide Express 17/11/2018

Dieses Thema im Forum 'What's Going On' wurde von peckett gestartet, 7 November 2018.

  1. Big Al

    Big Al Nat Pres stalwart Staff Member Moderator

    Registriert seit:
    30 Mai 2009
    Beiträge:
    22.890
    Zustimmungen:
    23.021
    Ort:
    1016
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The same problem as when the doors fail on a SWT service, a power car fails on a HST or a points failure prevents a service getting to its destination. There are some failures where a 'just in case' option is, frankly, ridiculous. My understanding is that WCRC doesn't 'do' insurance. But it does 'do' necessity - e.g. for turning moves, heating if steam heat is not available, underpowered loco up front for the train load etc. They don't waste their time and money for something as bizarre as a turntable not being available.
     
    26D_M, banana patch, Haighie und 3 anderen gefällt dies.
  2. Fred Kerr

    Fred Kerr Resident of Nat Pres Friend

    Registriert seit:
    24 März 2006
    Beiträge:
    8.428
    Zustimmungen:
    5.402
    Geschlecht:
    männlich
    Beruf:
    Freelance photo - journalist
    Ort:
    Southport
    I will leave Mr Shuttleworth of this parish to respond if he thinks a response has any value and doesn't betray commercial confidences.
     
  3. peckett

    peckett Member

    Registriert seit:
    26 September 2006
    Beiträge:
    959
    Zustimmungen:
    648
    Yes and more recent ,46100 Ealing to York,60009 back .16/12/2017.I 'm surprised no one has commented on the the run from York to Kettering on one tank of water, I recon its about 130miles ,the A4 did about 30GALS(at best) to the mile on ECML train in steam days .So Saturdays run on those figures from York to Kettering it would have used about 4000gal ,but with a heavier train and a more graded route that could have been higher .So if 60009 still has 5000gal tender there wouldn't have been much water left at Kettering.
    I spoke to the support crew with 71000 when taking water at Kettering a few years ago ,and that had used just over 3000 gals from Barrow Hill to Kettering, York to Barrow Hill is about the same mileage ,so that would put 71000 as using 6000 gals York to Kettering.
     
    Last edited: 20 November 2018
  4. 46223

    46223 Resident of Nat Pres Friend

    Registriert seit:
    10 April 2011
    Beiträge:
    6.755
    Zustimmungen:
    6.413
    Geschlecht:
    männlich
    Ort:
    Lancs
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Shouldn't that be the other way round?
     
    60017 gefällt dies.
  5. peckett

    peckett Member

    Registriert seit:
    26 September 2006
    Beiträge:
    959
    Zustimmungen:
    648
    Thanks for the correction.
     
    46223 gefällt dies.
  6. guycarr360

    guycarr360 Part of the furniture

    Registriert seit:
    4 Oktober 2005
    Beiträge:
    4.911
    Zustimmungen:
    3.212
    Geschlecht:
    männlich
    Ort:
    Chester le Street County Durham
    When 60019 brought us back to York, I am surprised she used any water, the 47 shoved out on Kings X that hard, we were doing 60 into Gasworks Tunnel (maybe 30 then).

    Same happened all the way up ECML, no stop, she did have the water carrier that day, if memory serves me correct.
     
  7. torgormaig

    torgormaig Part of the furniture Friend

    Registriert seit:
    17 Juli 2007
    Beiträge:
    5.033
    Zustimmungen:
    7.939
    No. 9 didn't do York to Kettering on one tank of water - there was a booked water stop at Barrow Hill and it left there with a full tender. I bet you've been confused by the times given on RTT - don't worry so was the signaller! The water stop was shown as Barrow Hill North Junction so we were brought to a stand there. In fact it was at Barrow Hill South Junction hence the fact that it appears that we left the signal stop at North Junction 8 mins early and were 26 mins late at Tapton Junction, three miles further on.

    Peter
     
    sunstream gefällt dies.
  8. alts1985

    alts1985 Well-Known Member

    Registriert seit:
    29 August 2007
    Beiträge:
    1.913
    Zustimmungen:
    770
    Geschlecht:
    männlich
    Beruf:
    Store Manager for the Co-operative Group
    Ort:
    Stevenage
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Short clip from Harlington in the evening included in my video from today's run...

     
  9. peckett

    peckett Member

    Registriert seit:
    26 September 2006
    Beiträge:
    959
    Zustimmungen:
    648
    Thanks Peter .I had been following the train down from York on Realtime. As I live half a mile from Kettering station I intended to see No9 there. But with no stop at Barrow Hill,and the hold up at Tapton which I thought was to get on the MML.Then a few minutes stop at Melton M and 21 mins reported on RTT from Manton to Kettering ,that was some going.(When they run MML Meridians are booked 23 min, admitted with a stop at Corby.) I bet it made a grand sight climbing away from the slack over Welland (Harringworth )Viaduct up the 1 in200 to Corby Tunnel. After that I was convinced the train was diesel hauled and didn't venture out.
     
  10. Swiss Toni

    Swiss Toni Well-Known Member

    Registriert seit:
    9 November 2008
    Beiträge:
    1.997
    Zustimmungen:
    3.814
    Ort:
    Switzshire
    A video I came across of this railtour HERE.
     

Die Seite empfehlen