GWSR Broadway Developments

Discuție în 'Heritage Railways & Centres in the UK' creată de Breva, 1 Aug 2014.

  1. Sheff

    Sheff Resident of Nat Pres

    Înscris:
    21 Apr 2006
    Mesaje:
    8.059
    Aprecieri primite:
    3.138
    Sex:
    Masculin
    Ocupație:
    Retired Engineer & Heritage Volunteer
    Locație:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Also scuffing from vehicles turning and tree sap (look at any road surface under overhanging trees). (To be clear, this is a comment on tarmac in general, not a criticism of GWSR's use of it)
     
    Last edited: 2 Feb 2019
  2. AndyY

    AndyY Member

    Înscris:
    23 Feb 2013
    Mesaje:
    433
    Aprecieri primite:
    480
    And any repairs are inevitably done in a different grade and colour of black! I also can't abide the stuff, our country is swamped in it.
     
    Jamessquared apreciază asta.
  3. Breva

    Breva Well-Known Member

    Înscris:
    11 Oct 2010
    Mesaje:
    2.347
    Aprecieri primite:
    4.078
    Locație:
    Gloucestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Note that the new council car park only has tarmac at the throat, the main part has been surfaced with permeable blocks.

    The surface of the station approach is not an easy choice.

    - The railway has no spare cash despite the Broadway success, due to ongoing heavy infrastructure repair costs
    - The original 1904 surface was Cotswolds stone gravel, which is quickly ground to mush (like my drive :-( ) and is out of the question today.
    - Also to bear in mind is that it is a shared drive with 7 other properties, who have certain expectations for cost, ease of use etc.
    - The drive is on a slope with the embankment next to it. The builder's original intention was to let the stormwater drain into the embankment, without the use of kerbstones!

    It is probable that the drive will be used by coaches, so how the tarmac behaves we shall see. It seems to be OK at Toddington.
     
  4. Kinghambranch

    Kinghambranch Well-Known Member

    Înscris:
    20 Dec 2006
    Mesaje:
    1.879
    Aprecieri primite:
    1.612
    Sex:
    Masculin
    Ocupație:
    Retired
    Locație:
    White Rose County
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I love it. More tarmac please! Preferably without ice and snow on it!
     
  5. Sheff

    Sheff Resident of Nat Pres

    Înscris:
    21 Apr 2006
    Mesaje:
    8.059
    Aprecieri primite:
    3.138
    Sex:
    Masculin
    Ocupație:
    Retired Engineer & Heritage Volunteer
    Locație:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Seems we need a new thread for GWSR extension discussions.
     
    The Dainton Banker și Kinghambranch apreciază asta.
  6. flying scotsman123

    flying scotsman123 Resident of Nat Pres

    Înscris:
    9 Sep 2013
    Mesaje:
    10.674
    Aprecieri primite:
    18.700
    Sex:
    Masculin
    Locație:
    Cheltenham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Or dig out one of the numerous old ones!
     
    Kinghambranch, Jamessquared și Bluenosejohn apreciază asta.
  7. Big Al

    Big Al Nat Pres stalwart Staff Member Moderator

    Înscris:
    30 Mai 2009
    Mesaje:
    22.591
    Aprecieri primite:
    22.721
    Locație:
    1016
    Heritage Railway Volunteer:
    No I do not currently volunteer
  8. Sheff

    Sheff Resident of Nat Pres

    Înscris:
    21 Apr 2006
    Mesaje:
    8.059
    Aprecieri primite:
    3.138
    Sex:
    Masculin
    Ocupație:
    Retired Engineer & Heritage Volunteer
    Locație:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Bluenosejohn, jnc și flying scotsman123 apreciază asta.
  9. Breva

    Breva Well-Known Member

    Înscris:
    11 Oct 2010
    Mesaje:
    2.347
    Aprecieri primite:
    4.078
    Locație:
    Gloucestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The thread title seems to have changed - I don't remember calling it what it is now.
     
    michaelh și Sheff apreciază asta.
  10. flying scotsman123

    flying scotsman123 Resident of Nat Pres

    Înscris:
    9 Sep 2013
    Mesaje:
    10.674
    Aprecieri primite:
    18.700
    Sex:
    Masculin
    Locație:
    Cheltenham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I agree with @Sheff can we keep this thread just for Broadway please, and revert to original thread title? There's still lots of future development work there and it would be nice not to dilute it with talk of extensions which surface every few months or so. There is a perfectly good thread at https://www.national-preservation.c...er-reach-cheltenham-spa-station.35999/page-14 for the recent discussion to be moved to.
     
  11. JJJ

    JJJ New Member

    Înscris:
    24 Iul 2007
    Mesaje:
    59
    Aprecieri primite:
    47
    Sex:
    Masculin
    Locație:
    Gloucestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    keeping it Broadway focused then, did you see in the last blog post the very nice GWR poster frames being made for th3 station building. Very authentic and can only add to the ambiance.

    Also once the steps are completed what would be the chance that part of platform two being open for taking photos and visits to the signal box. Maybe for Galas and the like.
     
    Kinghambranch apreciază asta.
  12. Breva

    Breva Well-Known Member

    Înscris:
    11 Oct 2010
    Mesaje:
    2.347
    Aprecieri primite:
    4.078
    Locație:
    Gloucestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Thanks for the compliment about the poster frames. We are also working on V boards, using the same mouldings and more replica letters. We have a REFRESHMENTS one almost ready to go.

    Re the footbridge steps, we are not planning access to P2 so there will have to be some sort of barrier at the end of the centre span. The bridge will be a viewing platform for a while.

    P2 is unsurfaced and unfenced, and looks set to remain so for a while yet. It has been declared a CDM zone and when one of us was invited to attend a meeting in the office there a hard hat was forced on him for the 50 yd walk to it!
     
  13. Thompson1706

    Thompson1706 Part of the furniture

    Înscris:
    19 Noi 2007
    Mesaje:
    2.524
    Aprecieri primite:
    1.886
    Sex:
    Masculin
    Ocupație:
    Retired
    Locație:
    Rhiwabon
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    And the danger of head injury on that fifty yard walk was ?

    Bob.
     
  14. Breva

    Breva Well-Known Member

    Înscris:
    11 Oct 2010
    Mesaje:
    2.347
    Aprecieri primite:
    4.078
    Locație:
    Gloucestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Zero. There has been no work there for a year, and none is forecast. It's an example of the crap thrown at us to which I referred earlier.
     
    michaelh, The Dainton Banker și jnc apreciază asta.
  15. Big Al

    Big Al Nat Pres stalwart Staff Member Moderator

    Înscris:
    30 Mai 2009
    Mesaje:
    22.591
    Aprecieri primite:
    22.721
    Locație:
    1016
    Heritage Railway Volunteer:
    No I do not currently volunteer
    OK - No problem. Posts moved and title reinstated.

    Can we just ask that everyone keeps their posts relevant to the appropriate thread - i.e.

    Broadway developments at:
    https://www.national-preservation.com/threads/gwsr-broadway-developments.323671/page-141
    Cheltenham Spa matters and extensions at:
    https://www.national-preservation.com/threads/gwsr-cheltenham-spa-and-possible-extensions.35999/
    GWSR General Matters and Operations at:
    https://www.national-preservation.c...n-and-operations.1073733/page-25#post-2368123
     
    MellishR, jnc, michaelh și alți 3 apreciază asta.
  16. Jamessquared

    Jamessquared Nat Pres stalwart

    Înscris:
    8 Mar 2008
    Mesaje:
    27.798
    Aprecieri primite:
    64.475
    Locație:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Blimey, you lot have got more threads than the West Somerset :eek:

    Tom
     
    Bluenosejohn, Bean-counter, MellishR și alți 2 apreciază asta.
  17. Big Al

    Big Al Nat Pres stalwart Staff Member Moderator

    Înscris:
    30 Mai 2009
    Mesaje:
    22.591
    Aprecieri primite:
    22.721
    Locație:
    1016
    Heritage Railway Volunteer:
    No I do not currently volunteer
    But far less hassle........:)
     
    MellishR, Bill Drewett, Mark Thompson și alți 9 apreciază asta.
  18. MellishR

    MellishR Resident of Nat Pres Friend

    Înscris:
    16 Apr 2009
    Mesaje:
    8.912
    Aprecieri primite:
    5.849
    Not zero hassle though: there was more than a little relating to chimneys, the exact position of the footbridge, etc; but happily all satisfactorily resolved.
     
  19. JJJ

    JJJ New Member

    Înscris:
    24 Iul 2007
    Mesaje:
    59
    Aprecieri primite:
    47
    Sex:
    Masculin
    Locație:
    Gloucestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I think I know some of these answers from looking at the blogs but just fir clarity which of the following projects will be completed for the new season start? And if later any best guesses.

    Cafe and kitchen
    Local authority car park
    Driveway etc
    Signalling
    Stairs to foot bridge
    Extension to end of station building

    I know P2 is a while away but again what period have people in mind for starting / completing the P2 waiting room. Assume all materials will be rail delivery !
     
  20. Breva

    Breva Well-Known Member

    Înscris:
    11 Oct 2010
    Mesaje:
    2.347
    Aprecieri primite:
    4.078
    Locație:
    Gloucestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Here's what is most likely:

    Cafe and kitchen Ready mid March 2019
    Local authority car park Ready mid March 2019
    Driveway etc Ready mid March 2019
    Signalling Ready March 2020
    Stairs to foot bridge 2020 season? - P1 steps and centre span will be first, P2 steps only when P2 is declared fit for use (not 2020 though)
    Extension to end of station building Construction is penciled in for the YE 2019 winter shut down. Many parts already made.

    There are no firm plans for P2 or the P2 waiting room at the moment. Other priorities for free cash exist elsewhere on the railway.
     
    Last edited: 4 Feb 2019