If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

The Somerset & Dorset Railway at Midsomer Norton Updates

Rasprava u 'Heritage Railways & Centres in the UK' pokrenuta od Talking to Bears 00, 11. Ožujak 2019..

  1. Talking to Bears 00

    Talking to Bears 00 New Member

    Pridružen(a):
    3. Svibanj 2018.
    Poruka:
    54
    Lajkova:
    29
    Grad:
    Somerset
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The Somerset & Dorset Railway at Midsomer Norton March 2019 Diesel Gala British Railways Class 08 D4095 & English Electric 0.6.0DH D1120 - Had a great weekend thanks to all involved. :)

    British Railways Class 08 D4095.jpg English Electric 0.6.0DH D1120.jpg
     
    Kinghambranch and brmp201 like this.
  2. daveannjon

    daveannjon Well-Known Member

    Pridružen(a):
    31. Ožujak 2006.
    Poruka:
    1,114
    Lajkova:
    425
    Grad:
    Waiting for the Right Away
    Just got their latest magazine, superb quality and you can't help but wish them well with their expansion plans which will be boosted by a £500,000 legacy.

    Dave
     
    48624 and Greenway like this.
  3. Kinghambranch

    Kinghambranch Well-Known Member

    Pridružen(a):
    20. Prosinac 2006.
    Poruka:
    1,879
    Lajkova:
    1,612
    Spol:
    Muškarac
    Interesi:
    Retired
    Grad:
    White Rose County
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I agree totally. I received my magazine on Saturday and it is extremely informative and very good quality as usual. I've never been to MSN yet but I thoroughly enjoy being a distant member and I would encourage anyone with an interest in railways to join the society at Midsomer Norton.
     
    torgormaig se sviđa ovo.
  4. FearOfManchester

    FearOfManchester Member

    Pridružen(a):
    24. Siječanj 2016.
    Poruka:
    362
    Lajkova:
    418
    Spol:
    Muškarac
    Grad:
    Peak District
    Heritage Railway Volunteer:
    No I do not currently volunteer
    What's the legacy tied up in, AFAIK the station site is pretty much in its original configuration, I think they have space for an out of sight shed further down the line?
     
  5. Greenway

    Greenway Part of the furniture

    Pridružen(a):
    16. Ožujak 2008.
    Poruka:
    4,019
    Lajkova:
    3,804
    Spol:
    Muškarac
    Grad:
    South Hams
    Heritage Railway Volunteer:
    No I do not currently volunteer
    A most welcome sum of money for sure. They mention the extension to Chilcompton so maybe this is what the extra money will support.
    Of course the money may be restricted in its use. Anyway time will tell.
    https://www.sdjr.co.uk/
     
  6. Great Western

    Great Western Member

    Pridružen(a):
    22. Studeni 2009.
    Poruka:
    327
    Lajkova:
    174
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Crossing Silver Street, at least work towards that would be better than a pipe dream of clearing the cutting.
     
    48624 se sviđa ovo.
  7. johnofwessex

    johnofwessex Resident of Nat Pres

    Pridružen(a):
    6. Travanj 2015.
    Poruka:
    9,748
    Lajkova:
    7,858
    Spol:
    Muškarac
    Interesi:
    Thorn in my managers side
    Grad:
    72
    Heritage Railway Volunteer:
    No I do not currently volunteer
    But only going through the cutting allows the railway to 'break out' to an area with the potential for a larger site for sidings/workshops/parking etc
     
  8. realistidealist

    realistidealist New Member

    Pridružen(a):
    13. Siječanj 2013.
    Poruka:
    3
    Lajkova:
    2
    I would consider the cutting to be more practical in terms of cost to benefit. Yes it is a lot to dig out and that is expensive to do, but Silver Street is a logistical nightmare and i'm not convinced it would be any less costly.

    When I say 'more practical', I am not meaning that I consider either option to be feasible in the next ten years. But when considering the options the society will have to think about the whole of the routes that can potentially be unlocked, not just the first obstacles.

    Radstock - to reach it you have to cross Silver Street, which means re-aligning that road to gain clearance for the bridge without making the gradient prohibitive for road traffic. It would be part-closures of the road for a significant period, services being re-sited etc and that's before you start on the actual bridge. Then you would need to rip up the cycle path and relay it to share the trackbed, including doing some surveys of the old colliery tips etc as that was always subject to a speed restriction. The Radstock Road crossing is relatively simple in terms of what is actually needed, a long, single span skew would do it - but again that is millions in terms of surveys, engineering and disruption. Five arches would need repair to get to Radstock and then what? You're on a 1 in 50 gradient ending at a main road, where would a station go?

    Chilcompton - obviously the cuttings and tunnel, plus over and under bridges that would need repair. That is all serious work and serious money. But after that there is room to get a single line through the old station site and out to the other side of Chilcompton, where the trackbed passes behind some light industrial estates on its way to Old Down and Emborough. There's no hope of reviving the old station as-was, the site is too enclosed and some would-be preservationists have set the locals firmly against it.
     
    lil Bear and jnc like this.
  9. brmp201

    brmp201 Member

    Pridružen(a):
    18. Svibanj 2010.
    Poruka:
    614
    Lajkova:
    964
    Spol:
    Muškarac
    Interesi:
    IT Director
    Grad:
    Surrey, UK
    Heritage Railway Volunteer:
    No I do not currently volunteer

Podijelite ovu stranicu