If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

LE Movements, ECS and Test Runs 2019

Rasprava u 'What's Going On' pokrenuta od Big Al, 3. Siječanj 2019..

  1. noelist

    noelist Member

    Pridružen(a):
    5. Travanj 2009.
    Poruka:
    799
    Lajkova:
    110
    Spol:
    Muškarac
    Interesi:
    LGV C+E(FormerlyHGVClass1) Driver
    Grad:
    Lancaster
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Hmm, not having heard of TRACKSY, I was at Grange for the 8F, on return to Lancaster, people were asking station staff for next train to Leeds, they were told to get a Manchester Airport train and change at ??? cos it was bus from Hellifield to Skipton, which is flooded they were informed, which would take longer.
    I assume the water level must have dropped for 35018 to have been given the RA, albeit, around 4 hours late.
    what was also strange, the train I got back to Lancaster was supposed to go to Preston, but terminated at Lancaster, and sent on to Barrow, although the electronic sign said the next train was going to Morecambe, not an easy job for station staff.
     
    Last edited: 18. Ožujak 2019.
  2. noelist

    noelist Member

    Pridružen(a):
    5. Travanj 2009.
    Poruka:
    799
    Lajkova:
    110
    Spol:
    Muškarac
    Interesi:
    LGV C+E(FormerlyHGVClass1) Driver
    Grad:
    Lancaster
    Heritage Railway Volunteer:
    No I do not currently volunteer
  3. Landshrew

    Landshrew New Member

    Pridružen(a):
    11. Travanj 2018.
    Poruka:
    166
    Lajkova:
    977
    Spol:
    Muškarac
    Interesi:
    Guard with SWR
    Grad:
    London
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    35018 north of Ely at Little Downham around 12:00 today. A nice birthday treat as she heads home with the Nigel Dobbing headboard still equipped. DSC_8220 (2).JPG
     
    D1002, alrohomer, leander i 12 ostalih se sviđa ovo.
  4. 30567

    30567 Part of the furniture Friend

    Pridružen(a):
    7. Kolovoz 2012.
    Poruka:
    6,125
    Lajkova:
    4,088
    My take on it is that they were given the road from Carnforth at 1000, one hour late. The 0819 from Leeds arrived at Carnforth at 1010. Between then and the unit's scheduled return at 1058, control must have decided conditions were too bad for the unit to risk it. Fortunately the special just squeaked through to Hellifield. Then yes, the water level either side of Skipton dropped in the afternoon and traffic resumed, though not on the Little North Western. Copy Pit stayed open all day on Sat, so I expect the Leeds people were routed via Preston. A long journey if you were going from Lancaster to Skipton though!

    The water level at York and Naburn Lock only peaked 24 hours later.

    That's an interesting route back. Do steam locos often go from Burton to Lichfield
     
  5. staffordian

    staffordian Well-Known Member

    Pridružen(a):
    27. Ožujak 2012.
    Poruka:
    1,524
    Lajkova:
    2,172
    Spol:
    Muškarac
    Interesi:
    Retired
    Grad:
    The Potteries
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I'm pretty sure this is a regular route from the East Midlands to Crewe and the north.

    Personally speaking, I wish they would turn right at North Staffs junction and proceed via Uttoxeter and Stoke, but assume either paths are trickier on parts of that route or maybe gauging is a problem.

    Having said that, Tornado is booked that way sometime later this year, on a trip that should have happened soon after it's failure...
     
  6. derobeck

    derobeck New Member

    Pridružen(a):
    18. Srpanj 2007.
    Poruka:
    71
    Lajkova:
    251
    At March - in sunshine!
    2019-03-18 35018 March_0625.jpg
     
    alrohomer, leander, Jerr Grey i 9 ostalih se sviđa ovo.
  7. class8mikado

    class8mikado Part of the furniture

    Pridružen(a):
    1. Lipanj 2009.
    Poruka:
    3,840
    Lajkova:
    1,644
    Interesi:
    Print Estimator/ Repository of Useless Informatio.
    Grad:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Looking back, the reason that WCRC wouldnt accept Tornado was the use of a non approved company to skim the cylinder liners ? ... in the mean time have those liners been reskimmed/replaced by someone else ...a WCRC approved contractor maybe.
     
    MarkinDurham se sviđa ovo.
  8. NeilL

    NeilL Well-Known Member

    Pridružen(a):
    30. Ožujak 2012.
    Poruka:
    2,030
    Lajkova:
    1,522
    Interesi:
    Retired & OAPWay & tree feller
    Grad:
    Staffordshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The sun went in just as it was approaching Fradley (between Alrewas and Lichfield)
    P3186762.JPG
     
  9. sunstream

    sunstream Member Friend

    Pridružen(a):
    1. Kolovoz 2007.
    Poruka:
    560
    Lajkova:
    147
    Grad:
    York
  10. 60017

    60017 Resident of Nat Pres Friend

    Pridružen(a):
    6. Srpanj 2008.
    Poruka:
    9,103
    Lajkova:
    8,072
    Spol:
    Muškarac
    Interesi:
    Retired from corporate slavery :o)
    Grad:
    Fylde Coast
    Heritage Railway Volunteer:
    No I do not currently volunteer
    sunstream se sviđa ovo.
  11. john34077

    john34077 New Member

    Pridružen(a):
    12. Lipanj 2011.
    Poruka:
    184
    Lajkova:
    105
    Spol:
    Muškarac
    Grad:
    St Neots
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Flying Scotsman positioning move from York to Southall



    John
     
    The Green Howards, 68923 i leander se sviđa ovo.
  12. Ploughman

    Ploughman Part of the furniture

    Pridružen(a):
    1. Travanj 2008.
    Poruka:
    5,969
    Lajkova:
    2,761
    Interesi:
    Ex a lot of things.
    Grad:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Looks like it may be the last steam movement over the damaged bridge at Castleton on the Esk Valley line.
    As the new bridge is due to be installed over the last weekend in March.
    Should keep a few bodies happy on Mothers Day after a shortened night shift due to the hour change sunday morning.
    Or make the day shift guys happy to miss out on going out with relatives.
     
  13. Davo

    Davo Well-Known Member

    Pridružen(a):
    12. Listopad 2018.
    Poruka:
    1,539
    Lajkova:
    649
    Spol:
    Muškarac
    Grad:
    W yorkshire 56f
    Heritage Railway Volunteer:
    No I do not currently volunteer
    How long will that take N.R. to install the new bridge deck. Is it a steel plate bridge the one in question that a bin wagon struck last year on the Esk valley line.
     
    Last edited by a moderator: 19. Ožujak 2019.
  14. 46236

    46236 Well-Known Member

    Pridružen(a):
    19. Rujan 2005.
    Poruka:
    1,408
    Lajkova:
    250
    Spol:
    Muškarac
    Interesi:
    lord of the manor
    Grad:
    city of gold
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The whole area is a managed flood plain
     
  15. staffordian

    staffordian Well-Known Member

    Pridružen(a):
    27. Ožujak 2012.
    Poruka:
    1,524
    Lajkova:
    2,172
    Spol:
    Muškarac
    Interesi:
    Retired
    Grad:
    The Potteries
    Heritage Railway Volunteer:
    No I do not currently volunteer
    A video of 35018 and ECS en route to Carnforth earlier today...

     
  16. jsm8b

    jsm8b Part of the furniture

    Pridružen(a):
    3. Prosinac 2014.
    Poruka:
    3,141
    Lajkova:
    7,491
    Spol:
    Muškarac
    Interesi:
    Escapee from the corporate bear-pit
    Grad:
    Shropshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    A little further on approaching Cranberry.

    DSC_3375 35018 Cranberry 180319.JPG
     
    green five, alrohomer, nige757 i 8 ostalih se sviđa ovo.
  17. Romsey

    Romsey Part of the furniture

    Pridružen(a):
    14. Srpanj 2007.
    Poruka:
    3,868
    Lajkova:
    1,849
    Spol:
    Muškarac
    Interesi:
    Retired SPM
    Grad:
    Close to Spike Island
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    That depends on how much damage there is to the stonework. They will have to remove the old bridge beams and bearings and make good the stone abutment walls before installing the new bearings. Then they will need to allow some hours for the mortar to cure under the pre cast bearings before lowering the new bridge section into place. Allowing for removing and reinstating the track, 52 hours is reasonable, including 10% contingency for equipment failures.

    Cheers, Neil
     
    Michael Anderson and 60017 like this.
  18. 60017

    60017 Resident of Nat Pres Friend

    Pridružen(a):
    6. Srpanj 2008.
    Poruka:
    9,103
    Lajkova:
    8,072
    Spol:
    Muškarac
    Interesi:
    Retired from corporate slavery :o)
    Grad:
    Fylde Coast
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I see BIL made it back to Carnforth ok last night. She's clocked up a fair few miles over the past 2/3 days! After a tentative start, this MN has emerged as a star performer for 10A. All credit to Mr Smith and his team at WCRC!
     
  19. dublo6231

    dublo6231 Member

    Pridružen(a):
    22. Kolovoz 2011.
    Poruka:
    577
    Lajkova:
    474
    Spol:
    Muškarac
    Interesi:
    IT
    Grad:
    Sat at home
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Scotsman on the move and 50 early meaning I’ve missed it through Maidenhead...
     
  20. dublo6231

    dublo6231 Member

    Pridružen(a):
    22. Kolovoz 2011.
    Poruka:
    577
    Lajkova:
    474
    Spol:
    Muškarac
    Interesi:
    IT
    Grad:
    Sat at home
    Heritage Railway Volunteer:
    No I do not currently volunteer
    And now 11 late at Reading after a lengthy wait in Sonning Bridge loop. Ggrrr
     

Podijelite ovu stranicu