If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

The Welsh Mountaineer 23/07/19

الموضوع في 'What's Going On' بواسطة Davo, بتاريخ ‏25 مارس 2019.

  1. Davo

    Davo Well-Known Member

    إنضم إلينا في:
    ‏12 اكتوبر 2018
    المشاركات:
    1,540
    عدد المعجبين:
    650
    الجنس:
    ذكر
    مكان الإقامة:
    W yorkshire 56f
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Due to heavy flooding on the Conwy Valley line on 16th March in different locations the trackbed has been severely damaged in some places (but where exactly on the line I'm not sure) and may not be repaired in time for the Welsh Mountaineer tour from Preston via Manchester to Blaenau Ffestiniog. NR estimate work to be complete on this line the latest in July (Full story on Rail Advent news) I've booked my seat on this trip but not heard anything from RTC about postponing or cancelling the tour. Anybody who else on NP who may be booked on this trip have you heard anything from NR or RTC. Davo 56F.
     
    Last edited by a moderator: ‏25 مارس 2019
  2. 60017

    60017 Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏6 جويلية 2008
    المشاركات:
    9,107
    عدد المعجبين:
    8,076
    الجنس:
    ذكر
    الوظيفة:
    Retired from corporate slavery :o)
    مكان الإقامة:
    Fylde Coast
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It's four months away!
     
    أعجب بهذه المشاركة steamvideosnet
  3. Davo

    Davo Well-Known Member

    إنضم إلينا في:
    ‏12 اكتوبر 2018
    المشاركات:
    1,540
    عدد المعجبين:
    650
    الجنس:
    ذكر
    مكان الإقامة:
    W yorkshire 56f
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Yes but N.R. Estimate the shoring up of the earthworks could be as late as July John I'm just concerned any others on NP who have booked this tour may be doubting NR estimated timescale for completing repairs on the route. We will see anyhow if RTC Offer us refunds or not within the coming months.
     
    Last edited by a moderator: ‏25 مارس 2019
  4. Big Al

    Big Al Nat Pres stalwart Staff Member Moderator

    إنضم إلينا في:
    ‏30 ماي 2009
    المشاركات:
    22,602
    عدد المعجبين:
    22,741
    مكان الإقامة:
    1016
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Don't ask on here. Wait for the RTC to tell you.
     
    MarkinDurham, steamvideosnet و 60017 معجبون بهذا.
  5. Davo

    Davo Well-Known Member

    إنضم إلينا في:
    ‏12 اكتوبر 2018
    المشاركات:
    1,540
    عدد المعجبين:
    650
    الجنس:
    ذكر
    مكان الإقامة:
    W yorkshire 56f
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thanks for the advice big al im just looking out for others who may have booked the welsh mountaineer who may be doubting.
     
  6. RalphW

    RalphW Nat Pres stalwart Staff Member Administrator Friend

    إنضم إلينا في:
    ‏11 سبتمبر 2005
    المشاركات:
    36,453
    عدد المعجبين:
    9,914
    الجنس:
    ذكر
    الوظيفة:
    Retired-ish, Part time rail tour steward.
    مكان الإقامة:
    Northwich
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It's scheduled for 23rd July so RTC will not bother making any announcements one way or the other until a lot closer to the date. Patience is required, I doubt if anyone else is worried at the moment.
     
    MarkinDurham, KRM47827 و Davo معجبون بهذا.
  7. Big Al

    Big Al Nat Pres stalwart Staff Member Moderator

    إنضم إلينا في:
    ‏30 ماي 2009
    المشاركات:
    22,602
    عدد المعجبين:
    22,741
    مكان الإقامة:
    1016
    Heritage Railway Volunteer:
    No I do not currently volunteer

مشاركة هذه الصفحة