    Appears to be for January - February, but not uploaded to the website until April 30th.

    Tom
     
    أعجب بهذه المشاركة Sheff
  2. Davo

    Davo Well-Known Member

    إنضم إلينا في:
    ‏12 اكتوبر 2018
    المشاركات:
    1,539
    عدد المعجبين:
    649
    الجنس:
    ذكر
    مكان الإقامة:
    W yorkshire 56f
    Heritage Railway Volunteer:
    No I do not currently volunteer
    So far then its the con rods and valve gear motion bearings that are been checked to see if the dimensions have been machined correctly, Does this include the main driving wheel bearings also are going to have to be checked as well including the pony trucks wheelsets in the near future or has the examination of the driver axle bearings been checked already? Seen as though the engineering update from the L.M.S. patriot project was written sometime in late january early febuary 2019?
     
  3. W.Williams

    W.Williams Well-Known Member

    إنضم إلينا في:
    ‏20 ديسمبر 2015
    المشاركات:
    1,650
    عدد المعجبين:
    1,559
    الوظيفة:
    Mechanical Engineer
    مكان الإقامة:
    Aberdeenshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I really admire the Patriot team for their transparency on this, highly commendable.

    I also really feel for them.

    I’d encourage an open mind on reworking non-conforming parts.

    Rework is an expensive activity. Making new can be just as cheap in some instances.
    Yes, it hurts, but it pays off later.
     
    أعجب بهذه المشاركة jnc
  4. Nigel Day

    Nigel Day Member

    إنضم إلينا في:
    ‏17 مارس 2015
    المشاركات:
    275
    عدد المعجبين:
    715
    الجنس:
    ذكر
    الوظيفة:
    Steam loco engineer
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Since the report mentioned above things are moving on fast. Most of the issues are being dealt with or are already done. The next warrior will be out in the next few weeks or so will tell of the big steps forward being made.
     

    الملفات المرفقة:

    • image.jpeg
      image.jpeg
      حجم الملف:
      4.3 ميغا
      المشاهدات:
      108
    big.stu, John Merry, 7P6F و 10 آخرون معجبون بهذا.
  5. crantock

    crantock Member

    إنضم إلينا في:
    ‏22 نوفمبر 2008
    المشاركات:
    528
    عدد المعجبين:
    276
    الجنس:
    ذكر
    الوظيفة:
    Beancounter
    مكان الإقامة:
    Birmingham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thanks Nigel. Could you have a word with someone that dirty linen washing is highly counterproductive to fund raising etc etc.


    Sent from my iPhone using Tapatalk
     
    Nigel Day, Matt78, Sheff و 1 شخص آخر معجبون بهذا.
  6. Gav106

    Gav106 Well-Known Member

    إنضم إلينا في:
    ‏29 مارس 2010
    المشاركات:
    1,772
    عدد المعجبين:
    2,170
    مكان الإقامة:
    Nantwich, Cheshire
    I 100% agree with this comment.

    As Nigel says, he and his group of volunteers are doing their best on the chassis down at Crewe, the guys down at Leaky Finders are working on the tender and HBSS are cracking on with the boiler. On their page they posted images of the dome being fitted this week.

    The report was indeed the one that ends at the end of January/February. It was missed for some reason and not posted until April. The next one should go on at the start of June as its currently being written.

    We are having an open weekend on the 8th of June at Crewe Heritage centre so if anyone is going to the LNWR/LSL open weekend on that same day, they can jump on the free bus and come and see progress on 5551, have a chat with us etc etc. The Crewe HC are also having a model railway show that weekend so there is plenty to see and do!
     
    أعجب بهذه المشاركة Sheff
  7. M Palmer

    M Palmer Guest

    Disagree. As a (admittedly very minor) contributor to this project, I for one would like to know that any defects or issues that arise are being dealt with as best as possible and the only way to know that is to know they exist in the first place. Surely if the Patriot Project kept quiet, contributors would wonder why the project suddenly started buying two of everything and fundraising would dry up faster than a puddle on Mercury's day-side! The project's expenditure must be in the public domain for it to function. I really don't see another way.

    I applaud the transparency and will be contributing as best I can to spite this setback. We're gonna get a bloomin' Patriot! Setbacks be damned!
     
    Last edited by a moderator: ‏21 ماي 2019
    andrewshimmin, garth manor, W.Williams و 1 شخص آخر معجبون بهذا.
  8. Davo

    Davo Well-Known Member

    إنضم إلينا في:
    ‏12 اكتوبر 2018
    المشاركات:
    1,539
    عدد المعجبين:
    649
    الجنس:
    ذكر
    مكان الإقامة:
    W yorkshire 56f
    Heritage Railway Volunteer:
    No I do not currently volunteer
    P.s. if you read one of the posts #1238 earlier the costs are been recovered from llangollen engineering L.T.D. to pay for the new parts needed to be made again.
     
    أعجب بهذه المشاركة garth manor
  9. ghost

    ghost Part of the furniture

    إنضم إلينا في:
    ‏29 ماي 2006
    المشاركات:
    4,303
    عدد المعجبين:
    5,727
    الجنس:
    ذكر
    مكان الإقامة:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Actually it says "The costs involved will be recovered from Llangollen Engineering."

    I think the key words are 'will be' i.e. Llangollen haven't actually agreed to refund costs and unfortunately it may yet result in legal action.

    Keith
     
    Kinghambranch و jnc معجبون بهذا.
  10. DismalChips

    DismalChips Member

    إنضم إلينا في:
    ‏11 إبريل 2016
    المشاركات:
    682
    عدد المعجبين:
    715
    مكان الإقامة:
    9A
    Heritage Railway Volunteer:
    No I do not currently volunteer
    "recovered from" is also one of those phrases you tend to see more in the context of legal shenanigans than not.
     
    أعجب بهذه المشاركة Kinghambranch
  11. Kylchap

    Kylchap Member

    إنضم إلينا في:
    ‏15 ديسمبر 2015
    المشاركات:
    492
    عدد المعجبين:
    935
    الجنس:
    ذكر
    مكان الإقامة:
    East Anglia
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I hope the Patriot folks are looking at this with great caution. Litigation can be very expensive and soon exceed what you're trying to recover. I wouldn't want my contributions to the project ending up lining the pockets of lawyers.
     
  12. Kinghambranch

    Kinghambranch Well-Known Member

    إنضم إلينا في:
    ‏20 ديسمبر 2006
    المشاركات:
    1,879
    عدد المعجبين:
    1,612
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    White Rose County
    Heritage Railway Volunteer:
    No I do not currently volunteer
    My thoughts exactly. This new build project is too important (my personal view only) to waste funds on litigation. I will do my best to continue to support it nonetheless.
     
    أعجب بهذه المشاركة Gav106
  13. Sheff

    Sheff Resident of Nat Pres

    إنضم إلينا في:
    ‏21 إبريل 2006
    المشاركات:
    8,057
    عدد المعجبين:
    3,137
    الجنس:
    ذكر
    الوظيفة:
    Retired Engineer & Heritage Volunteer
    مكان الإقامة:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It’s not the listing of defects and rectification work that people are criticising, it’s the public appropriation of blame and of recompense, both of which may be open to dispute and would be better settled in private.
     
    49010, MuzTrem, Kinghambranch و 10 آخرون معجبون بهذا.
  14. M Palmer

    M Palmer Guest

    That doesn't make sense to me. How can you have defects and rectification work being necessary without the manufacturer's responsibility being implicit.

    As I have said it is at least a part-publicly-financed project so the finances must be made available which means the cost of rectification work must be made available which means the reason for the rectification work must be made available. Otherwise, I'm reasonably certain unjustified expenses would send up a red flag or two.

    To not be seen to be dealing with this, to cover it up to protect the manufacturer's modesty for lack of a better way of putting it would lead to an irrevocable breakdown in trust in the project's finances that would be catastrophic for the project.

    As for the threat of litigation, if the parts aren't fit for purpose, what litigation???

    One final question, if you ordered a conservatory built that had a 6 inch gap and didn't actually mate up to your house, would you be happy with the work?
     
    Last edited by a moderator: ‏22 ماي 2019
    أعجب بهذه المشاركة Gav106
  15. huochemi

    huochemi Part of the furniture

    إنضم إلينا في:
    ‏6 ماي 2008
    المشاركات:
    2,995
    عدد المعجبين:
    1,515
    الجنس:
    ذكر
    مكان الإقامة:
    UK
    Heritage Railway Volunteer:
    No I do not currently volunteer
    In answer to the first sentence, it all depends on what the contract says, as a "defect" is a subjective concept, and it depends heavily on what the contractor was asked to do. It would actually be quite difficult to draft a contract for say making a boiler, especially if your counterparty has limited financial resources e.g. how does one define completion of the boiler, what happens if it springs a major leak a couple of months later etc, and the same applies to some extent to a contract to white-metal a bearing. If you look at loco tendering specifications from the 1930s, you will generally find somewhere the expression "of very best workmanship" or similar,which I am sure was repeated in the contract, but the expression is in itself undefined and could lead to lengthy litigation if one was so inclined, no doubt relying on each side calling expert witnesses. How customers got round it in practice was to appoint a consulting engineer (or one of their own staff if the customer had the resources) to inspect all stages of manufacture, so if anything was going off piste, it could be dealt with immediately. The situation here suggests insufficient oversight.
     
    jnc, Davo, Martin Perry و 5 آخرون معجبون بهذا.
  16. Andy Williams

    Andy Williams Well-Known Member

    إنضم إلينا في:
    ‏23 إبريل 2010
    المشاركات:
    1,037
    عدد المعجبين:
    1,063
    الوظيفة:
    Design Engineer
    مكان الإقامة:
    Shropshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Until such time that any defect liability, and ensuing rectification/recompense has been agreed between the two parties, it is inappropriate for either of them to sound off about the subject in public. Publishing intemperant comments certainly won't do you any favours if the matter were to go to arbitration.

    It is entirely feasible for a manufacturer to produce a part that is later found to be unfit for purpose if he has been provided with incorrect information/measurements/drawings/materials by the party contracting out the works. I am not saying that this is the case with the Patriot group, but using it as an ilustration that things are not always so clear-cut as you imagine.

    Andy
     
    Last edited: ‏22 ماي 2019
    Christopher125, andrewshimmin, MuzTrem و 7 آخرون معجبون بهذا.
  17. JEB-245584

    JEB-245584 Member

    إنضم إلينا في:
    ‏21 ماي 2008
    المشاركات:
    462
    عدد المعجبين:
    530
    الوظيفة:
    ADI
    As I have said it is at least a part-publicly-financed project so the finances must be made available which means the cost of rectification work must be




    One final question, if you ordered a conservatory built that had a 6 inch gap and didn't actually mate up to your house, would you be happy with the work?[/QUOTE]

    But, whose at fault there?

    The surveyor who did the measuring, the client who was told by the surveyor that the walls were out of true and didn't rectify it, the factory who built to the surveyors dimensions or the fitters who installed it.

    What people are trying to say is that till all the ins and outs are looked into then the process should be dealt with discreetly, not in the public domain, there are always two sides to every dispute. No issue whatsoever in details being released to the people with vested interests in the group after it's all resolved.
     
    Christopher125, andrewshimmin, MuzTrem و 2 آخرون معجبون بهذا.
  18. Jamessquared

    Jamessquared Nat Pres stalwart

    إنضم إلينا في:
    ‏8 مارس 2008
    المشاركات:
    27,793
    عدد المعجبين:
    64,458
    مكان الإقامة:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Actually there are several ways. One might be incorrect or insufficient specification of the work to be done; another might be that the supplier requested a mid-stage sign off before proceeding, which the project didn't provide despite request.

    I'm not saying those things did happen; simply suggesting that considering this is cut-and-dried case with all the fault clearly assigned is probably an assumption too far. So while I agree that trust between donor and project is paramount, I'm not convinced that that trust is necessarily won by a very public apportioning of blame. The project will no doubt be in earnest discussion with the contractor(s); and if you are a subscriber, raising issues of project controls and governance at annual meetings is within your rights; I'm just not convinced that having the discussion - particularly in a one sided way, with only one party commenting - is the right way to help foster that sense of donor / project trust.

    Least said, soonest mended in my view: it's a small industry and you never know when you might wish to use that supplier again in the future.

    Tom
     
    49010, Christopher125, Gav106 و 9 آخرون معجبون بهذا.
  19. philw2

    philw2 Member

    إنضم إلينا في:
    ‏30 إبريل 2011
    المشاركات:
    494
    عدد المعجبين:
    86
    Does anybody know whether the boiler stays specification is agreed or is there a hold-up on this element of the project also?

    Sent from my Nexus 7 using Tapatalk
     
  20. Sunnieboy

    Sunnieboy New Member

    إنضم إلينا في:
    ‏25 فبراير 2012
    المشاركات:
    105
    عدد المعجبين:
    159
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Swanage
    Heritage Railway Volunteer:
    Yes I am an active volunteer
     
    أعجب بهذه المشاركة Jamessquared

مشاركة هذه الصفحة