Construction of 3' Gauge Blyth for Southwold Railway Trust by NBR Engineering, Darlington

الموضوع في 'Narrow Gauge Railways' بواسطة David Humphreys, بتاريخ ‏16 ماي 2019.

  1. David Humphreys

    David Humphreys New Member

    إنضم إلينا في:
    ‏11 إبريل 2011
    المشاركات:
    99
    عدد المعجبين:
    306
    الجنس:
    ذكر
    مكان الإقامة:
    Boosbeck, Saltburn by the Sea
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The boiler was finished last week and is awaiting final certification from British Engineering.

    Today, the chassis assembly was started.

    Have added the photo of the completed boiler to complete the record to date
    [​IMG]

    [​IMG]

    [​IMG]
     
    StoneRoad, Bluenosejohn, ghost و 3 آخرون معجبون بهذا.
  2. Russ Bulley

    Russ Bulley New Member

    إنضم إلينا في:
    ‏13 إبريل 2014
    المشاركات:
    36
    عدد المعجبين:
    31
    الجنس:
    ذكر
    Why build a new loco when there is are two perfectly good 3 foot gauge locos Kettering Furnaces No.8 and Handyman from Kettering ironstone railways crying out for support, one at Market Harborough and the other at the NRM?
     
  3. David Humphreys

    David Humphreys New Member

    إنضم إلينا في:
    ‏11 إبريل 2011
    المشاركات:
    99
    عدد المعجبين:
    306
    الجنس:
    ذكر
    مكان الإقامة:
    Boosbeck, Saltburn by the Sea
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The Trust who is paying can choose whatever locomotive they like.
     
    Last edited: ‏16 ماي 2019
    Meiriongwril, StoneRoad, staffordian و 11 آخرون معجبون بهذا.
  4. ghost

    ghost Part of the furniture

    إنضم إلينا في:
    ‏29 ماي 2006
    المشاركات:
    4,306
    عدد المعجبين:
    5,737
    الجنس:
    ذكر
    مكان الإقامة:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Perfect response David!

    Great work with the boiler, looking forward to seeing this loco emerge, hopefully you'll be able to post a few pics here from time to time as construction progresses?

    Keith
     
    Hicks19862, Wenlock, Bluenosejohn و 1 شخص آخر معجبون بهذا.
  5. David Humphreys

    David Humphreys New Member

    إنضم إلينا في:
    ‏11 إبريل 2011
    المشاركات:
    99
    عدد المعجبين:
    306
    الجنس:
    ذكر
    مكان الإقامة:
    Boosbeck, Saltburn by the Sea
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Hi Keith,

    Thanks.

    That is the plan.

    You can follow the progress of this locomotive and other new builds and components for others on Facebook aswell https://www.facebook.com/North-Bay-Railway-Engineering-Services-222968755125074/?ref=bookmarks
     
    StoneRoad, The Green Howards, garth manor و 3 آخرون معجبون بهذا.
  6. kscanes

    kscanes Resident of Nat Pres

    إنضم إلينا في:
    ‏1 يناير 2008
    المشاركات:
    9,167
    عدد المعجبين:
    4,401
    Probably because The Southwold Railway want a Southwold Railway locomotive?
     
    Martin Perry, MattA, 48624 و 10 آخرون معجبون بهذا.
  7. ady

    ady Well-Known Member

    إنضم إلينا في:
    ‏4 جويلية 2006
    المشاركات:
    2,375
    عدد المعجبين:
    285
    الجنس:
    ذكر
    الوظيفة:
    Post office
    مكان الإقامة:
    South
    Heritage Railway Volunteer:
    No I do not currently volunteer
    And their owned by someone else. The NRM may not want to enter a lease agreement. The loan of No. 8 might come with strings attached.

    Annnd.... a new locomotive has the benefits of a new locomotive... i.e. won't be worn out...
     
    ross, ghost, Hicks19862 و 1 شخص آخر معجبون بهذا.
  8. Guitar

    Guitar New Member

    إنضم إلينا في:
    ‏28 فبراير 2013
    المشاركات:
    127
    عدد المعجبين:
    66
    I think having an original Southwold locomotive is a statement of intent as much as it is having a working locomotive.
     
    andrewshimmin, David Humphreys, ghost و 2 آخرون معجبون بهذا.
  9. Hicks19862

    Hicks19862 Member

    إنضم إلينا في:
    ‏6 اكتوبر 2015
    المشاركات:
    828
    عدد المعجبين:
    749
    الجنس:
    ذكر
    مكان الإقامة:
    Manchester
    Congratulations to the Southwold Trust and all of the team working on this project.
     
    David Humphreys, Robkitchuk, ghost و 1 شخص آخر معجبون بهذا.
  10. David Humphreys

    David Humphreys New Member

    إنضم إلينا في:
    ‏11 إبريل 2011
    المشاركات:
    99
    عدد المعجبين:
    306
    الجنس:
    ذكر
    مكان الإقامة:
    Boosbeck, Saltburn by the Sea
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Southwold boiler finished, tested and approved by British Engineering Services.


    upload_2019-5-24_22-22-17.jpeg

    upload_2019-5-24_22-24-32.png

    upload_2019-5-24_22-22-41.png
     
    J Rob't Harrison, StoneRoad, taliesin1999 و 8 آخرون معجبون بهذا.
  11. cav1975

    cav1975 Member

    إنضم إلينا في:
    ‏24 سبتمبر 2009
    المشاركات:
    526
    عدد المعجبين:
    649
    Is it normal for welded boilers to have such sharp corners where the plates are welded together?
     
  12. David Humphreys

    David Humphreys New Member

    إنضم إلينا في:
    ‏11 إبريل 2011
    المشاركات:
    99
    عدد المعجبين:
    306
    الجنس:
    ذكر
    مكان الإقامة:
    Boosbeck, Saltburn by the Sea
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Yes, if that is what is designed.
     
    أعجب بهذه المشاركة Hicks19862
  13. Steve

    Steve Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏7 اكتوبر 2006
    المشاركات:
    12,734
    عدد المعجبين:
    11,852
    الوظيفة:
    Gentleman of leisure, nowadays
    مكان الإقامة:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Square cornered boilers aren’t popular with traditionalists but are well proven.
     
    Hicks19862 و David Humphreys معجبون بهذا.
  14. cav1975

    cav1975 Member

    إنضم إلينا في:
    ‏24 سبتمبر 2009
    المشاركات:
    526
    عدد المعجبين:
    649
    I assume that the designers have taken account of the lessons learned here https://www.news.com.au/travel/trav...r/news-story/bc723a15ce58a97d839483bfd0e7ce4a

    ........the square shape of the Comet’s windows played a big role in the metal fatigue that caused those crashes.

    The sharp corners of the windows put the surrounding metal under extra stress in high altitudes — as much as two or three times more than other places on the plane. The stress was concentrated in the four corners of every window, causing the metal fatigue.............
     
  15. mdewell

    mdewell Well-Known Member Friend

    إنضم إلينا في:
    ‏23 مارس 2005
    المشاركات:
    1,925
    عدد المعجبين:
    2,999
    الوظيفة:
    UK & Ireland Heritage Railways Webmaster
    مكان الإقامة:
    Ruabon, Wrexham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I don't think there are many windows in steam loco boilers. ;)

    (Sorry, someone had to say it :D)
     
    ross, andrewshimmin, The Dainton Banker و 7 آخرون معجبون بهذا.
  16. cav1975

    cav1975 Member

    إنضم إلينا في:
    ‏24 سبتمبر 2009
    المشاركات:
    526
    عدد المعجبين:
    649
    Indeed Mark:), but they are pressure vessels subject to fatigue with (in this case) internal sharp corners.

    Still, if they meet the various codes of practise, etc. all will be well.
     
  17. arthur maunsell

    arthur maunsell Well-Known Member

    إنضم إلينا في:
    ‏6 سبتمبر 2008
    المشاركات:
    1,047
    عدد المعجبين:
    140
    مكان الإقامة:
    by the fire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    yes but they were internal squares not external. The stress cracks would radiate out from the corners, which aren't there on the boiler.
     
    andrewshimmin, Steve و Hicks19862 معجبون بهذا.
  18. arthur maunsell

    arthur maunsell Well-Known Member

    إنضم إلينا في:
    ‏6 سبتمبر 2008
    المشاركات:
    1,047
    عدد المعجبين:
    140
    مكان الإقامة:
    by the fire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    how much would such a loco be costing, ballpark. ?
     
  19. Johann Marsbar

    Johann Marsbar Well-Known Member

    إنضم إلينا في:
    ‏21 فبراير 2016
    المشاركات:
    1,669
    عدد المعجبين:
    2,180
    الجنس:
    ذكر
    مكان الإقامة:
    Suffolk
    Heritage Railway Volunteer:
    No I do not currently volunteer
    According to their May 2019 Newsletter that someone gave me the other day, they are quoting around £250,000 to complete the loco. Don't know whether the boiler is included in that, though presumably so.
    The "rolling chassis" is apparently the next phase (frames/wheels/cylinders/motion) and is costed at over £130,000.
     
  20. huochemi

    huochemi Part of the furniture

    إنضم إلينا في:
    ‏6 ماي 2008
    المشاركات:
    3,002
    عدد المعجبين:
    1,521
    الجنس:
    ذكر
    مكان الإقامة:
    UK
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Talyllyn / No1, has had an all-welded boiler without flanged plates, since rebuilding c. 1957.
     

    الملفات المرفقة:

    • talyllyn.jpg
      talyllyn.jpg
      حجم الملف:
      357.6 ك. ب
      المشاهدات:
      538
    Mrcow, Wenlock, ross و 4 آخرون معجبون بهذا.