    Let me explain. A tube expander is a series of hardened rollers around the periphery of a steel 'cage'. This is inserted into the tube end (with plenty of oil) right up to the flange on the expander and a tapered mandrel pushed into the expander. There is a square drive on the end of mandrel which can be turned, slowly, by a hand ratchet or a windy drill. As the mandrel turns it screws its way down the expander pushing the rollers out as they turn. This pushes on the inside of the tube wall which expands sealing it in the tube hole. You can see the tube deforming as the expander is turned so tubes are best annealed first. Sometimes the tube may be swaged down and/or jumped up for several inches at the end. IIRC the ones on a Jinty were 1 3/4" dia swaged down to 1 5/8" at the firebox end and jumped up to 1 7/8" at the smokebox end. The idea being that the tube is easier to remove when covered in scale. The expander must be long enough to expand the tube for the full thickness of the tubeplate which is why tubes are trimmed to only leave 3/8 - 1/2" sticking out. The whole process is easier to do than describe, and if doing it by hand, one gets arm muscles like Popeye.
    On firebox tubeplates (and on some smokebox tubeplates) the tubes are beaded over onto the tubeplate using a beading tool - the "hook shape" you described. This can be done by hand or machine.
    The idea of beading is two-fold, to stop the tube end burning away and to protect the tubeplate. Hope this helps.
    Ray.
     
    osprey, ghost, 60017 en 4 anderen vinden dit leuk.
  2. Steve

    Steve Resident of Nat Pres Friend

    Lid geworden:
    7 okt 2006
    Berichten:
    12.732
    Leuk Bevonden:
    11.848
    Beroep:
    Gentleman of leisure, nowadays
    Locatie:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    More or less. Rolling is the term used in the US; we tend to say expanding in the UK but it is the same thing. The sealing of the tube to the tubeplate is done in the expanding process. The beading of the tube ends is to prevent them burning away. In the US beading is still quite common on industrial boilers but rarely happens in the UK where we tend to go for welding. You can't do this with a copper firebox on a loco boiler so it has to be by means of beading. Fitting of ferrules to protect the tube end is an alternative to beading but it is a long time since I saw this done with a loco boiler.

    Edit, Marshall5 just beat me to it.
     
    ghost, Bluenosejohn, Kylchap en 2 anderen vinden dit leuk.
  3. Davo

    Davo Well-Known Member

    Lid geworden:
    12 okt 2018
    Berichten:
    1.539
    Leuk Bevonden:
    649
    Geslacht:
    Man
    Locatie:
    W yorkshire 56f
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thanks to you both marshall5 and steve for that explanation on this subject. I've been looking all over Google sites to see if I could find anything about tube fitting. I came across a few You Tube vids on demos. Mainly Yankee boiler smithies fitting tubes and showing how rolling and beading is done.
     
    Last edited by a moderator: 5 feb 2019
  4. Kylchap

    Kylchap Member

    Lid geworden:
    15 dec 2015
    Berichten:
    492
    Leuk Bevonden:
    935
    Geslacht:
    Man
    Locatie:
    East Anglia
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thanks for the very interesting technical explanations above.
     
  5. Steve

    Steve Resident of Nat Pres Friend

    Lid geworden:
    7 okt 2006
    Berichten:
    12.732
    Leuk Bevonden:
    11.848
    Beroep:
    Gentleman of leisure, nowadays
    Locatie:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    More on tubing. You've mentioned tubes being swaged up and tubes being swaged down. Main line loco practice is generally for the tubes to be swaged down at the firebox whilst industrial loco practice is generally for tubes to be swaged up at the smokebox end, although, as you say, both can be applied. The advantage of the former is that the ligaments between the tubes are larger, making them less liable to fracture whilst the advantage of the latter is that the tubes are generally easier to remove when covered in scale. The diagram below shows the difference between two otherwise identical tube arrangements.
    upload_2019-2-4_22-20-10.png
     
    ghost, CH 19, 60017 en 3 anderen vinden dit leuk.
  6. CH 19

    CH 19 Well-Known Member Friend

    Lid geworden:
    30 dec 2013
    Berichten:
    1.271
    Leuk Bevonden:
    648
    Geslacht:
    Man
    Beroep:
    Hospital Porter
    Locatie:
    W14
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Like Kylchap, thank you all for the explanations, tis so good for me to be able to increasingly understand the technical side of our passion.

    Chris
     
  7. estwdjhn

    estwdjhn Member

    Lid geworden:
    24 jan 2013
    Berichten:
    342
    Leuk Bevonden:
    693
    Beroep:
    Boilermaker
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The advantage to "mainline practice" is increased heating surface, as for a given size of tube holes one gets to use tubes which are a size larger.

    There are also locos about which have the tubes swaged down at the firebox end, and swaged up in the front tubeplate (the front tubeplate is often very thick, which then permits a certain amount of reduction in the ligaments size) - to some extent this arrangement is a "best of both worlds".
     
    Bluenosejohn, ghost, Jamessquared en 2 anderen vinden dit leuk.
  8. 60017

    60017 Resident of Nat Pres Friend

    Lid geworden:
    6 jul 2008
    Berichten:
    9.103
    Leuk Bevonden:
    8.072
    Geslacht:
    Man
    Beroep:
    Retired from corporate slavery :o)
    Locatie:
    Fylde Coast
    Heritage Railway Volunteer:
    No I do not currently volunteer
    From the SNGLT website (members area) today...


    Update 24 April:

    The overhaul of our locomotive achieved a significant milestone yesterday when the boiler successfully passed its formal hydraulic test to the satisfaction of our insurers. A steam test will follow shortly. The superheater needs to be re-fitted after which the boiler will be moved to York and reunited with the frames. It is envisaged a further in-frames hydraulic test will be conducted during the re-assembly process to reset the clock on the ten year boiler approval.
     
  9. garth manor

    garth manor Well-Known Member

    Lid geworden:
    10 apr 2009
    Berichten:
    1.890
    Leuk Bevonden:
    529
    Thanks for spotting that, good progress for a much needed A4 working presence.
     
    Wingsandwheels vindt dit leuk.
  10. Davo

    Davo Well-Known Member

    Lid geworden:
    12 okt 2018
    Berichten:
    1.539
    Leuk Bevonden:
    649
    Geslacht:
    Man
    Locatie:
    W yorkshire 56f
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Any news on when a move of 60007,s boiler is moved back to N.R.M.? Then early to mid summer im presuming if a out of frames steam test is to take place.
    Good news on the hydraulic test.:)
     
  11. 60017

    60017 Resident of Nat Pres Friend

    Lid geworden:
    6 jul 2008
    Berichten:
    9.103
    Leuk Bevonden:
    8.072
    Geslacht:
    Man
    Beroep:
    Retired from corporate slavery :o)
    Locatie:
    Fylde Coast
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Not yet. Be patient!
     
    Wingsandwheels en steamvideosnet vinden dit leuk.
  12. Davo

    Davo Well-Known Member

    Lid geworden:
    12 okt 2018
    Berichten:
    1.539
    Leuk Bevonden:
    649
    Geslacht:
    Man
    Locatie:
    W yorkshire 56f
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Ok john.:Morewaitingisrequired:
     
  13. Eightpot

    Eightpot Resident of Nat Pres Friend

    Lid geworden:
    10 aug 2006
    Berichten:
    8.340
    Leuk Bevonden:
    2.506
    Geslacht:
    Man
    Beroep:
    Engineer Emeritus
    Locatie:
    Aylesbury
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Snap! Got my 5" gauge LNER V1 2-6-2 tank loco boiler hydraulically tested successfully today by the local model engineering club.
     
    Davo, 242A1, Johnb en 1 andere persoon vinden dit leuk.
  14. Davo

    Davo Well-Known Member

    Lid geworden:
    12 okt 2018
    Berichten:
    1.539
    Leuk Bevonden:
    649
    Geslacht:
    Man
    Locatie:
    W yorkshire 56f
    Heritage Railway Volunteer:
    No I do not currently volunteer
    update from rail advent 28th/5/2019 written by jamie duggan issue 40 engineering update on A4 60007 S.N.G. latest restoration work of tender and middle valve gear components and more......
    Check the link above Davo 56F.
     
  15. Thompson1706

    Thompson1706 Part of the furniture

    Lid geworden:
    19 nov 2007
    Berichten:
    2.524
    Leuk Bevonden:
    1.886
    Geslacht:
    Man
    Beroep:
    Retired
    Locatie:
    Rhiwabon
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    A fire was lit this morning to warm up the boiler in readiness for its steam test.

    Bob.
     
    ykin01, Johnme101, blink bonny en 14 anderen vinden dit leuk.
  16. pwsw5054

    pwsw5054 Member

    Lid geworden:
    5 jan 2016
    Berichten:
    411
    Leuk Bevonden:
    1.284
    Geslacht:
    Man
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Boiler steam testing has started at Llangollen, this is part of a series of tests leading to the formal insurance test when the superheater header has been fitted. The fire was first lit on 23rd May 2019, 60 years after 60007 set the post war speed record.

     
  17. Eightpot

    Eightpot Resident of Nat Pres Friend

    Lid geworden:
    10 aug 2006
    Berichten:
    8.340
    Leuk Bevonden:
    2.506
    Geslacht:
    Man
    Beroep:
    Engineer Emeritus
    Locatie:
    Aylesbury
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Just one quibble with this. From my experience isn't it more of a case of the tube being initially rolled and expanded so that it is in contact all round with the hole in the tube plate, then being squeezed between the rollers of the expander and the tube plate, which results in the circumference of the tube being stretched and thus made larger in diameter to effect a seal? A bit difficult to find words to describe the procedure, but hope you understand what I mean.
     
    Last edited: 1 jun 2019
    Gwrman 1985 vindt dit leuk.
  18. Davo

    Davo Well-Known Member

    Lid geworden:
    12 okt 2018
    Berichten:
    1.539
    Leuk Bevonden:
    649
    Geslacht:
    Man
    Locatie:
    W yorkshire 56f
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Reaming the tube ends?
     
  19. 61624

    61624 Part of the furniture

    Lid geworden:
    27 sep 2006
    Berichten:
    5.294
    Leuk Bevonden:
    3.599
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Expanding a tube to fit a hole in a tube plate is not reaming as I understand it, which is finishing a hole to a precise size
     
    marshall5, ghost, MarkinDurham en 3 anderen vinden dit leuk.
  20. Sheff

    Sheff Resident of Nat Pres

    Lid geworden:
    21 apr 2006
    Berichten:
    8.059
    Leuk Bevonden:
    3.138
    Geslacht:
    Man
    Beroep:
    Retired Engineer & Heritage Volunteer
    Locatie:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Do you mean beading-over?