Construction of 3' Gauge Blyth for Southwold Railway Trust by NBR Engineering, Darlington

Тема в разделе 'Narrow Gauge Railways', создана пользователем David Humphreys, 16 май 2019.

  1. arthur maunsell

    arthur maunsell Well-Known Member

    Дата регистрации:
    6 сен 2008
    Сообщения:
    1.047
    Симпатии:
    140
    Адрес:
    by the fire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thank you for that. Sensible move to build the boiler first isn't it. Sounds like 120 for the boiler and 130 for the rest then. That's doable. If only there was a derelict 3' gauge line within 40 miles of me :-(
     
  2. mikehartuk

    mikehartuk New Member

    Дата регистрации:
    29 июн 2007
    Сообщения:
    107
    Симпатии:
    515
    Пол:
    Мужской
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    [​IMG]

    In parts I think. Loco Talyllyn backhead clearly has welded square corners. But, I think the throat plate (the firebox front with its transition to the firebox sides and the boiler barrel bottom) is a pressing with curved/flanged corners - or so it appears. Mike
     
    Last edited: 30 май 2019
    LesterBrown нравится это.
  3. StoneRoad

    StoneRoad Member

    Дата регистрации:
    29 окт 2009
    Сообщения:
    976
    Симпатии:
    385
    Род занятий:
    Restoration of heritage items, mainly in timber.
    Адрес:
    Haltwhistle
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Saw this recently, well done to the team at NBR Engineering.
    Looking forward to the next phase ...
     
  4. huochemi

    huochemi Part of the furniture

    Дата регистрации:
    6 май 2008
    Сообщения:
    2.995
    Симпатии:
    1.515
    Пол:
    Мужской
    Адрес:
    UK
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I think that is right, Mike. Nevertheless, somewhat avant garde for its time. ISTR that the pressure is only 140 psi, but that I believe was due to retention of the original copper box, which meant keeping the original stay spacing.
     
  5. RLinkinS

    RLinkinS Member

    Дата регистрации:
    8 ноя 2008
    Сообщения:
    982
    Симпатии:
    972
    Пол:
    Мужской
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Modern ultrasonics will be able to detect cracks in the plates adjacent to the welds
     
    David Humphreys нравится это.
  6. David Humphreys

    David Humphreys New Member

    Дата регистрации:
    11 апр 2011
    Сообщения:
    99
    Симпатии:
    306
    Пол:
    Мужской
    Адрес:
    Boosbeck, Saltburn by the Sea
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Hello All,

    When any boiler is made it goes through a number of checks before any metal is cut.

    The design process has to be sound, calculations made and then submitted to an independent Authorising Body, in our case British Engineering Services. They confirm they are happy with the design, including flat ends. Indeed flat end boilers have been around since Victorian times - Lancashire Boilers. All modern plant boilers for hospitals, schools, power stations and alike are welded construction with flat ends. Formed rounded plates are required if the boiler is being manufactured with rivet joints to effectively transfer the joint through 90 degrees down the length of the firebox or boiler. We have manufactured boilers with rounded ends because that is what the client ordered.

    After receipt of the BES approval, the certified boiler plates are ordered and when received all edges are prepared at an angle for the potential welding. All stay holes are also prepared at an angle too. Once completed, the BES inspector visits to confirm the plates marry with the steel certificates and the weld preps are to the correct angle for a full pentration weld.

    Using TIG method, the certified Welder approved by BES then undertakes the knitting together of the plates using TIG with various fills to bring the joined plate back to level. It is the TIG route and hot pass that is the seal for the boiler and the fill on top collectively makes sure that the plates are not going to split apart. The firebox is assembled, again with appropriate joints and the foundation ring is prepared to weld in. When completed, the firebox is heated to relieve stress with appropriate paperwork re the temperatures and all long seam welds are X rayed, to prove there are no issues, voids and cracks. As with the heat treatment, this is undertaken by a third party specialist who issues their own certificate of conformity.
    The BES Inspector makes a final visit to make sure he is happy and all paperwork and the foundation ring prep and front tube plate preps are as designed before installation of the firebox and foundation ring, all the stays and the front tube plate.

    When finished all external welded joins and stays are then MPI'd (Magnetic Partical Inspection) to again prove there are no voids or cracks in the welds.

    The certified boiler tubes are then prepared and installed.

    All inspection and wash out holes are stopped up, the regulator hole and safety valve holes are stopped too for a pressure test to the desired maximum pressure. This is left for some time, often overnight to prove no major loss in pressure.

    The BES Inspector makes a final visit, proves the pressure test again, checks all certified paperwork is in place for the plates and tubes, along with the heat treatment and weld MPI checks and then can issue his certificate of conformity and stamp the plaque which is attached to the boiler in his presence.
     
    Last edited: 30 май 2019
    Goldie, Chris86, garth manor и 22 другим нравится это.
  7. cav1975

    cav1975 Member

    Дата регистрации:
    24 сен 2009
    Сообщения:
    526
    Симпатии:
    649
    Thank you for your very complete explanation.
     
  8. ross

    ross Well-Known Member

    Дата регистрации:
    18 май 2017
    Сообщения:
    1.002
    Симпатии:
    2.477
    Пол:
    Мужской
    Адрес:
    Titfield
    Heritage Railway Volunteer:
    No I do not currently volunteer
    At this point, how long can a boiler sit on the shelf without further testing being required? I believe that once the fire/steam test is done there is a ten year ticket, but could a boiler sit in the stores, unsteamed, for ten years without being regarded as not new?
     
    Wenlock нравится это.
  9. David Humphreys

    David Humphreys New Member

    Дата регистрации:
    11 апр 2011
    Сообщения:
    99
    Симпатии:
    306
    Пол:
    Мужской
    Адрес:
    Boosbeck, Saltburn by the Sea
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The boiler has been manufactured to specifications agreed by BES.

    The Boiler Inspector is the one that will issue the steam ticket and start the 10 year rolling as and when. It is up to them to decide what, if any additional testing is required. As a matter of course, before the in steam test, it has a further hydraulic to prove the fittings like valves and gauges. The steam test also proves fittings arr all ok and that there are no problems. A full visual inspection is also completed, safety valves tested to make sure there is no accumulation of steam with a roaring fire and it at blowing off level. Finally, all methods of introducing water into the boiler work - pumps and injectors.

    If it was sitting around in the wrong type of environment, I am sure that they would be adding additional stipulations before a steam test is undertaken.
     
    Paul42, RLinkinS, Hicks19862 и 3 другим нравится это.
  10. Hicks19862

    Hicks19862 Member

    Дата регистрации:
    6 окт 2015
    Сообщения:
    828
    Симпатии:
    749
    Пол:
    Мужской
    Адрес:
    Manchester
    This is one of the main reasons I come on these forums. To read informative posts from the experts in the know.
     
    MattA, Bluenosejohn, ghost и 2 другим нравится это.
  11. BiggerBob

    BiggerBob New Member

    Дата регистрации:
    9 сен 2007
    Сообщения:
    73
    Симпатии:
    52
    Thank you - illuminating explanation. Do you have an estimated date for completion that you are able to share?
     
  12. David Humphreys

    David Humphreys New Member

    Дата регистрации:
    11 апр 2011
    Сообщения:
    99
    Симпатии:
    306
    Пол:
    Мужской
    Адрес:
    Boosbeck, Saltburn by the Sea
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Unfortunately I do not have a completion timescale. This is up to the owners but any financial hrlp for them will be appreciated.
     
    Hicks19862 нравится это.
  13. Johann Marsbar

    Johann Marsbar Well-Known Member

    Дата регистрации:
    21 фев 2016
    Сообщения:
    1.669
    Симпатии:
    2.178
    Пол:
    Мужской
    Адрес:
    Suffolk
    Heritage Railway Volunteer:
    No I do not currently volunteer
    According to their website, the Contract is for £300,000 and they would like to get it completed by the end of 2020.........
    https://www.southwoldrailway.co.uk/trust-projects/2-4-0t-no-3-blyth/
    If they don't get the money coming in on a regular basis, then that date will obviously slip.
    Like all "new build" projects, they will only get the job done if people contribute to them!
     
    ross и Hicks19862 нравится это.
  14. estwdjhn

    estwdjhn Member

    Дата регистрации:
    24 янв 2013
    Сообщения:
    342
    Симпатии:
    693
    Род занятий:
    Boilermaker
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It's a costs vs lifespan issue.

    Square cornered boilers are inferior for a number of reasons, mostly related to stress cracking. They therefore tend (and I know that is not a definitive statement - there are exceptions for various reasons) to have shorter working lives that boilers with flanged endplates. They are however also much cheaper to build, to the point that one can probably build two all welded square cornered quarry hunslet boilers for the cost of one traditional one.
    The issues are more or less proportional to the boiler's size - a corner welded boiler on a small loco like this should have a reasonable lifespan - put one on a black five and I'd be surprised if it managed 10 years.
    Most of the cracking in boilers is due to the expansions and contraction as the boiler goes through steaming cycles - the slower it's brought into and out of steam, the better the life span is likely to be.
     
    Last edited: 8 июн 2019
    Bluenosejohn нравится это.
  15. Dag Bonnedal

    Dag Bonnedal New Member

    Дата регистрации:
    28 мар 2012
    Сообщения:
    184
    Симпатии:
    317
    Пол:
    Мужской
    Адрес:
    Stockholm, Sweden
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The problems with stress cracking is very much related to size. Big boilers should definitely not have square corners, but small narrow gauge boilers are usually OK.
    But one thing related to stress cracking that could not be emphasised enough is the heating up process. Rapid firing up will always lead to cracking. Most critical is getting the whole boiler (including foundation ring) over 50 C when the steel becomes less brittle. And it is only when the water starts to boil at 100 C that the water starts to circulate and evens out the temperature differences between the upper and lower parts.
    For our medium size locos of 12 ton total weight we state at least 90 minutes to get up to boiling temperature.
     
  16. estwdjhn

    estwdjhn Member

    Дата регистрации:
    24 янв 2013
    Сообщения:
    342
    Симпатии:
    693
    Род занятий:
    Boilermaker
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It's not just the bringing into steam - it's also the putting to bed. An engine brought on shed with the glass nearly empty and blowing off, which then has the injector stuffed on in one long burst to take it from 180lbs to 50lbs whilst the crew empty the ashpan and shovel the fire out will have a much shorter boiler life than one fetched on shed with 100lbs, and nearly full glass, when then gets injected down to 50lbs to top the boiler up, and is left with a grate covered glowing embers and a ashpan full of hot ash. It's much kinder to an engine to empty the firebox and ashpan the following day once it's gone cold.
     
    Dag Bonnedal и Jamessquared нравится это.
  17. Dag Bonnedal

    Dag Bonnedal New Member

    Дата регистрации:
    28 мар 2012
    Сообщения:
    184
    Симпатии:
    317
    Пол:
    Мужской
    Адрес:
    Stockholm, Sweden
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    True, but the dominating problem in that case is the introduction of water with dissolved oxygen (air) in it.
    When the injected water is warmed up the air forms small gas bubbles that stick to any irregularities on any surface, and lead to local corrosion.
    Next time the irregularity is slightly bigger and the gas bubble will stick to the exact same spot again, and again, and again.
    This leads to pitting corrosion that soon will go through the metal plate or tube.

    Don't top up the boiler if the fire is to be dropped. We have the rule that after the loco enters the terminal station at its last run for the day the injectors should not be touched. The shunting at the end of the day gives enough steaming to make the oxygen bubbles go away. Our relative small boilers are almost pressure-less the next morning. We have water hose connections on all boilers and can top up with some extra water if needed before lighting up.
    For big boilers you keep the pressure up with some fire on the grate, and then the pitting problem is not as grave.
     
  18. richards

    richards Part of the furniture

    Дата регистрации:
    1 окт 2008
    Сообщения:
    4.708
    Симпатии:
    2.083
    Пол:
    Мужской
    Адрес:
    London
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Are they also cheaper/easier to make?
     
  19. marshall5

    marshall5 Part of the furniture

    Дата регистрации:
    26 окт 2010
    Сообщения:
    2.521
    Симпатии:
    4.359
    Адрес:
    i.o.m
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Much!
    Ray.
     
  20. cncmodeller

    cncmodeller New Member

    Дата регистрации:
    11 май 2013
    Сообщения:
    101
    Симпатии:
    88
    Пол:
    Мужской
    Род занятий:
    Industrial Modelmaker
    Адрес:
    Lincolnshire
    It's probably me but those frames look incredibly thin?
    John
     